Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Determination of Load Transfer Characteristics of Gloved Resin Bolts from Laboratory and In Situ Field Testing

    By Dion Pastars

    Resin based grouts are the main form of rock bolt anchorage in the underground coal industry in Australia and New Zealand. To be effective, the system requires the mixing of the catalyst and mastic co

    Jan 1, 2005

  • SME-ICGCM
    Assessment of Ground Conditions Near a Mine Portal Using Ground Penetrating Radar

    By Michael Trevits

    The NIOSH Lake Lynn Laboratory (LLL) is a unique research facility, located about 50 miles southeast of Pittsburgh, Pennsylvania, that is designed to provide a full-scale mining environment for testin

    Jan 1, 2005

  • SME-ICGCM
    Evaluation of the Impact of Standing Support on Ground Behavior in Longwall Tailgates (8a8cef19-7d7c-417d-83e0-31858c1152c5)

    By Thomas Barczak

    Longwall mines typically use some form of standing support for secondary roof support in longwall tailgate entries. Although there have been several new support products developed for this application

    Jan 1, 2005

  • SME-ICGCM
    Implication of Highly Anisotropic Horizontal Stresses on Entry Stability at the West Elk Mine, Somerset, Colorado

    By J. F. T. Agapito

    Overcore measurements at the North Fork Valley (NFV) coal mines in western Colorado have shown that horizontal stresses are highly anisotropic. Measurements have been made in four mines at various dep

    Jan 1, 2005

  • SME-ICGCM
    Field Measurements of Overburden Strata Deformation Response to Longwall Mining

    By Xinzhi (Thomas) Du

    "In order to monitor the overburden strata deformation over a longwall mining area in the Pittsburgh Coal Seam, three boreholes were drilled across the longwall panel. Each borehole employed multiple-

    Jan 1, 2018

  • SME-ICGCM
    Longwall Shield Recovery, Using Phenolic Foam Injection for Gob Control As An Alternative to Recovery Mesh

    By James D. Pile

    Following a methane ignition in the active panel of a longwall coal mine, the affected panel was successfully isolated from the rest of the mine. This allowed for the remainder of the mine to return t

    Jan 1, 2013

  • SME-ICGCM
    Multi?Seam Mining Over Old Workings with Small Pillars - A Case Study

    By Peter Zhang

    Room and pillar mining under shallow depth is usually conducted with a high extraction ratio, which leaves small pillars with a low safety factor in some old workings in abandoned mines. Pillar slough

    Jan 1, 2014

  • SME-ICGCM
    Basics on the Dimensioning and the Extraction of Shaft Safety Zones

    By Anton Sroka

    The dimensioning of shaft safety zones is a substantial task of mining subsidence engineering. On the one hand, the coal reserves in shaft proximity are to be mined as complete as possible, because th

    Jan 1, 2005

  • SME-ICGCM
    Development of a Laboratory Facility for Testing Shear Performance of Installed Rock Reinforcement Tendons

    By L. Mahony

    This paper describes the design, construction and commissioning testing program for a laboratory facility at the School of Mining Engineering, UNSW, Australia, aimed at evaluating reinforcement tendon

    Jan 1, 2005

  • SME-ICGCM
    BORE Bolt: No Milled Notch? No Hot Notch? No Problem

    By Stephen C. Tadolini, Anand Bhagwat

    "Intrinsic supports installed in mines with limited seam or mining heights have always proven to be difficult when the required support length is longer. To date, three solutions have been used to ens

    Jan 1, 2018

  • SME-ICGCM
    Establishment and Application of Deformation Monitoring System of Roadway Based on the Three?Dimensional Model Experiment

    By Yongping Wu

    Roadway deformation and stress migration occur with uncertainty and randomness because of geology, tunneling and mining influence. In order to study the surrounding rock deformation and failure mechan

    Jan 1, 2013

  • SME-ICGCM
    Deformation Mechanism and Floor Heave Control Technology in Deep? Buried Full Seam Chamber

    By Xicai Gao

    With the intensification and expansion of deep coal mining, the surrounding rock stress environment becomes further deteriorated because of the complicated geological environment and powerful mining e

    Jan 1, 2013

  • SME-ICGCM
    Case Study and Design of Standing Steel Set Support for Aged Belt Entry Rehabilitation

    By Kevin J. Ma, John Stankus

    "In order to access remote reserve areas, some U.S. coal mines have to maintain aged underground entries for a great distance. However, high humidity, warm temperature, and time dependent deterioratio

    Jan 1, 2017

  • SME-ICGCM
    Analysis of Coal Pillar Stability (ACPS): A New Generation of Pillar Design Software

    By Zach Agioutantis, Christopher Mark

    "Thirty years ago, the Analysis of Longwall Pillar Stability (ALPS) inaugurated a new era in coal pillar design. ALPS was the first empirical pillar design technique to consider the abutment loads tha

    Jan 1, 2018

  • SME-ICGCM
    Basic Procedures for Monitoring and Modeling Abandoned Underground Coal Mines for Safety Due to Uncontrolled Closures: Case Study of Verdinho Mine, Santa Catarina State, Brazil

    By Selmar A. Oliveira

    "Safe mine closure is an important step in the mining lifecycle. Plans for safe and efficient closure should begin at the inception of mining. Ideally, closure occurs when the reserve has been deplete

    Jan 1, 2017

  • SME-ICGCM
    A Method for Quantitative Void/Fracture Detection and Estimation of Rock Strength for Underground Mine Roof

    By Syd Peng

    In designing a proper roof support system, one must know the features of roof geology in advance of mining. The drilling parameters obtained during normal roof bolt installation cycle can provide a l

    Jan 1, 2005

  • SME-ICGCM
    Investigation of Fully Grouted Roof Bolts Installed Under In Situ Conditions (8fabb507-7dbd-4e7d-b9c9-518c3be86281)

    By Craig Compton

    The The National Institute for Occupational Safety ane Health (NIOSH) Pittsburgh Research Laboratory (PRL) is continuing to investigate the behavior of fully grouted roof bolts in the weak roof rock o

    Jan 1, 2005

  • SME-ICGCM
    Seam Structure - An Important Criterion for Coal Pillar Design

    By Kot F. v. Unrug

    In spite of the extensive research and accumulated experience from mining operations, an appropriate pillar design remains an open issue. Due to the shrinking reserve base, present mining operations m

    Jan 1, 2005

  • SME-ICGCM
    Experimental and Numerical Methodology Assessment of Load Transfer Capacity of Bolts

    By Naj Aziz

    n Australia, the common method of laboratory testing of bolt for load transfer capacity determination is by short encapsulation push testing. Some concerns are raised about the validity of the test me

    Jan 1, 2005

  • SME-ICGCM
    Development of the Laboratory Short Encapsulation Pull Test for a Revised British Standard on Rock Reinforcement Components Used in Coal Mining

    By D. Bigby

    The current British Standard on rock reinforcement components used in coal mining (BS7861:1996) employs the axial double embedment tensile PET) test to determine the main system load transfer performa

    Jan 1, 2005