Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Development of the SII “Mission” Mineral Sands ProjectBy D. Settles, R. Rose, P. L. Dunn
"A new mineral sands operation is being developed in Georgia by Southern Ionics, Inc. (SII). Prevailing mineralogy and certain design constraints required detailed testing and circuit analysis to cre
Jan 1, 2015
-
OFR-135-85 Strategic And Critical Materials Program Annual ReportBy R. E. Chaney
This report summarizes the research on the Strategic and Critical Materials Program tasks conducted at the Idaho National Engineering Laboratory (INEL) between May 1984 and April 1985. The work is
Jan 1, 1985
-
Integrating Hydro-Fracturing Technology And Geophysics Into 3d Mapping And Extraction Of Metals In Heap Leaching; Hydro-Jex And High Resolution Resistivity ?.By Seal. Thom
Large heap leach operations around the world contain significant under-leached metal values that present recovery challenges to operators. The first challenge is to find the location of the highest
Jan 1, 2008
-
Two-Seam Mining Stability at OCI’s Big Island Trona MinaBy J. F. T. Agapito
OCI Wyoming mines two flat-lying trona seams that are 3- to 3.5-m- (10- to 11.5-ft-) thick, about10 m (33 ft) apart and 250-m- (820-ft-) deep at its Big Island Mine in Wyoming. Continuous miners and
Jan 1, 2000
-
Cavability Investigation Of A Stratabound Copper Deposit, Tong Kuang Yu Mine, Shanxi Province, ChinaBy W. C. Lacy
Stratabound copper ore bodies in thick Proterozoic metamorphosed sedimentary and volcanic rocks at the Tong Kuang Yu Mine in southern Shanxi Province of China were considered as possibly being amenabl
Jan 1, 1989
-
Design, Start-up and Optimization of Pb & Zn Flotation Circuits Utilizing Ultra-Fine Grinding TechnologyBy Lyne Côté, Jose Adante
"The Caribou underground mine, 50 km west of Bathurst, the Restigouche open-pit mine, another 30 km west and the concentrator located at the Caribou mine site resumed operations in July 2007 after a n
Jan 1, 2009
-
Recycling for Recovery of Critical Metals from LiCoO2 Cathode Material Through Methanesulfonic Acid‑Citric Acid Organic Leaching System - Mining, Metallurgy & Exploration (2023)By Jaeheon Lee, Jai‑Won Byeon, Junmo Ahn, Jun‑Jae Lee, Eun‑Woo Kim, Yoo‑Jin Kim, Jiajia Wu, Jae‑Yeon Kim
Growing demand for valuable battery materials and environmental issues from battery disposal make the recycling of spent lithium-ion batteries (LIBs) essential. Specifically, the green approaches usin
Sep 20, 2023
-
Practical Applications and Blast Designs with Nonelectric Initiation SystemsBy Tom Treleaven
Several nonelectric blast initiation systems have been developed since the mid 1970's. Until that time, most blasts were initiated either electrically with electric blasting caps or nonelectrically wi
Jan 1, 1991
-
Efeito Da Energia De Soldagem Na Microestrutura E Resistencia À Corrosão Do Aço Inoxidável Superduplex Uns S32750 Pelo Processo TigBy Francisco Necy Alves Júnior
Os aços inoxidáveis superduplex (AISD) aliam boas propriedades mecânicas e resistência à corrosão, possuindo um vasto campo de aplicação na indústria petroquímica. Geralmente, os reparos dos equipamen
Aug 7, 2018
-
Caracterização Da Lama De Alto-forno De Uma Siderúrgica Integrada Do Sudeste Do ParáBy Verônica Scarpini Candido
O Alto-Forno é o principal equipamento em uso para a produção do ferro gusa. Para a redução do minério de ferro em gusa são alimentados pelo topo do alto forno a carga composta por minério de ferro, c
Oct 30, 2017
-
Non-Linear System Identification Of An Autocatalytic Reactor Using Least Squares Support Vector MachinesPaper written on project work carried out in partial fulfilment of B.Sc. Eng. (Extractive Metallurgy)degree The concepts behind support vector machines are very interesting both in theory and in pr
Jan 1, 2003
-
Cadmuim-Base Bearing MetalsIn considering the preparation of any paper concerning bearing metals, one feels a certain amount of diffidence in venturing into a field which has been capably explored at great length and in great d
Jan 1, 1934
-
High Temperature Electrochemical Measurement of Tin Oxide Activity in SlagFew, if any, reliable thermodynamic data are available for the activity of tin oxide in slags. In this work, the activity of the oxide in silica saturated iron silicate slags has been measured at 1573
Jan 1, 1983
-
Kudremukh Experience With Roller Press - A SagaKudremukh Iron Ore Company Ltd, a wholly owned Government of India Enterprise, was established in the year 1976 to develop mine and plant facilities to produce 7.5 Mtpa of high-grade iron ore conce
Jan 1, 1999
-
Construction Of A Continuous Flight Auger Secant Wall: Chattahoochee Water Treatment Plant, Atlanta, Georgia - Project DetailsBy Gordon King
The City of Atlanta Water Department required the construction of a two sludge tanks and a wet well at the existing Chattahoochee Water Treatment Plant. Western Summit won a design build contract to b
Jan 1, 2003
-
Canadian Clean Power Coalition Project: The evaluation of options for CO2 extraction from existing and new coal-fired power plantsBy D. du Plessis, R. Stobbs
The Canadian Clean Power Coalition (CCPC) was created in 2001 to protect and enhance Canada’s vast coal and other carbon-based resource wealth, and to ensure that environmental public policy decisions
Jan 1, 2006
-
Hand-Dug Underreamed Piles At Embankment Place, LondonBy W. J. Grose
The Embankment Place office development over the platforms of Charing Cross Railway Station in London has presented many interesting and unusual problems to the engineers involved with the project. Th
Jan 1, 1989
-
An Analysis of the Performance of Multi-Stage Grinding and Cyclone Classification CircuitsBy Lynch A. J
A method has been developed for the prediction of the performance of multi-stage grinding-cyclone classification circuits of any degree of complexity on any ore for a wide range of operating condition
Jan 1, 1965
-
The Challenges Of Construction In Karstic Limestone: Three Major Case HistoriesBy Donald A. Bruce
The construction of major structures in karstic limestone terrains poses difficult problems to designer and contractor alike. This reflects the inherent variability of such conditions, and also the si
Jan 1, 2002
-
The Technored Process - Redefining the Steel BusinessThe rush for alternate iron-units in the last few years spurred a true outbreak of new alternate iron units projects many of them incorporating new process in what can be classified as the.most fru
Jan 1, 1999