Search Documents

  • AUSIMM
    Deposit Effects on the Kinetics of the Cementation of Copper with Zinc from Dilute Aqueous Solution

    A rotating disc of precipitant zinc in a single stage flow reactor was used to study the effects of deposit mass on the reaction kinetics of copper cementing on to zinc from dilute aqueous solutions.T

    Jan 1, 1973

  • CIM
    Best-in-class maintenance benchmarks in Chilean open-pit mines

    By P. Oyanader

    "In 2001, the Catholic University of Chile undertook a maintenance benchmarking study of six open pit copper mines having mill capacities varying between 18,000 t/d and 156,000 t/d, and collectively r

    Jan 1, 2005

  • SME
    Geologic Data Collection and Assessment Techniques in Coal Mining for Ground Control

    By Mark Van Dyke, Ted Klemetti, Joe Wickline

    "The identification and mitigation of adverse geologic conditions are critical to the safety and productivity of underground coal mining operations. To anticipate and mitigate adverse geologic conditi

    Jan 1, 2019

  • AUSIMM
    Upgrading of Iron Ores by Wet High Intensity Magnetic Separation (WHIMS)

    By Misra V. N, Cheng C. Y

    Two types of Mt Tom Price hematite iron ore from Hamersley Iron P/L were tested using a Humboldt Wedag Jones P40 wet high intensity magnetic separator (WHIMS). The parameters tested were magnetic i

    Jan 1, 1999

  • NIOSH
    RI 3016 The Lower Limits of Inflammability of Natural Gas-Air Mixtures in a Large Gallery

    By J. E. Crawshaw

    "The few previous observations of the effect of turbulence on limits of inflammability have been made on a small scale in turbulence produced either by a fan or by movement of the mixture.By a suitabl

    Jul 1, 1930

  • AIME
    The Constitution And Melting-Points Of A Series Of Copper-Slags.

    By Charles H. Fulton

    (Cleveland Meeting, October, 1912.) I. INTRODUCTION. THERE are comparatively few accurate data on the melting-or the freezing-point temperature of metallurgical slays, or on related physical phenome

    Dec 1, 1912

  • AUSIMM
    Design to closure – construction of detailed rehabilitation designed iron ore waste rock dumps based on upfront site specific assessment

    By A Kemp, I Taylor, S C. Lamoureux

    Detailed landform designs were completed for six (integrated) iron ore waste rock dumps at a Western Australian iron ore mine site to meet closure objectives and to optimise material movements for clo

    Jul 24, 2017

  • SAIMM
    Stochastic simulation for budget prediction for large surface mines in the South African mining industry

    By V. S. S. Yadavalli, J. Hager, R. Webber-Youngman

    "This article investigates the complex problem of a budgeting process for a large mining operation. Strict adherence to budget infers that financial results align with goals. In reality, the budget is

    Jan 1, 2015

  • SME-ICGCM
    Geomechanical Support Of Adaptive Mining Technology

    By I. V. Baklashov

    Geomechanical conditions of mining operation are determined by varying in time and space mechanical properties and initial state of the rock mass, by geological and technological factors. We define ad

    Jan 1, 1996

  • SME
    Current Ground Support Membrane Applications In North American Underground Mines

    By L. Lacerda

    Spray-on ground support membranes (GSM) or thin support liners hold today perhaps as much potential to impact underground (u/g) ground support operations as dry and later wet-mix shotcrete when introd

    Jan 1, 2002

  • IIMP
    Aclimitación a la altura

    By Alberto Hurtado

    El presente texto refiere los aspectos fisiopatológicos y clínicas que comprende un ambiente de mayor altitud para el organismo, así como que las dificultades en la adquisición, transporte y utilizac

    May 1, 1975

  • SAIMM
    A Heuristic Sublevel Stope Optimizer With Multiple Raises

    By X. Bai

    A new heuristic sublevel mining stope optimizer is presented. The optimizer seeks the best locations and lengths of a series of vertical raises that, together with the blocks linked to each raise, def

    Jan 1, 2014

  • DFI
    Post-Grouted Drilled Shafts: A Case History Of The PGA Boulevard Bridge Project

    By Gray Mullins

    A post grouted drilled shaft foundation system was successfully used in place of the specified driven pile foundation system as a Value Engineering Cost Proposal (VECP) for the new PGA Boulevard Grade

    Jan 1, 2003

  • DFI
    Drilled Pier Foundations In Downtown Seattle - Introduction

    By Thomas M. Gurtowski

    This paper presents a summary of allowable bearing pressures and skin friction values that have been used to design drilled pier foundations for support of high-rise structures in downtown Seattle, Wa

    Jan 1, 1990

  • NIOSH
    RI 3184 Sanitary Surveys of the Coal-Minig, Metal-Mining & Smelter Towns of Utah

    By Arthur L. Murray

    "INTRODUCTION In compliance with those provisions of the organic act establishing the Bureau. of Mines which relate to improvement of health conditions of persons engaged in the mining, preparation, o

    Oct 1, 1932

  • SME
    Numerical Analyses Of Stability Of Three-Way And Four-Way Coal Mine Intersections In Illinois

    Roof falls in coal mines typically occur in or around intersections and this has not changed in the last two decades. This research develops an improved scientific understanding of stress distribution

    Feb 27, 2013

  • SAIMM
    Management of the Nkomati Mine Crusher Slope Failure

    By R. Armstrong

    Due to limited available level ground, Nkomati Nickel Mine cut a weathered rock slope at the base of a mountain spur in order to create a platform for construction of the primary crusher plant and run

    Jan 1, 2014

  • DFI
    Design And Construction Of Large Diameter Drilled Shafts For The Bath - Woolwich Bridge

    By Andrew Peterson

    The Maine Department of Transportation offered this challenging design-build project for a new, 12-span, bridge over the Kennebec River in Bath, Maine. This structure would be built to replace the exi

    Jan 1, 1999

  • NIOSH
    OFR-90-82 Analysis Of Groundwater Criteria And Recent Restoration Attempts After In Situ Uranium Leaching

    By Grant Buma

    Groundwater restoration is an uranium leaching. Information on the technology, costs, and the current permitting regulations is of vital operators and to firms considering in important aspect of in si

    Jan 1, 1981

  • TMS
    Investigation Of The Slag Forming Route When Smelting Medium-Phosphorus Hot Metal

    By Mingmei Zhu, Xin Qiu, Xiaofei Dou, Yu Wang, Tiancheng Lin, Bing Xie

    In this study, the slag forming route of the single-slag steel melting when smelting medium phosphorus hot metal was investigated. The CaO-SiO2-FeO-MgO-MnO-P2O5 as hexahydric slag system was adopted i

    Jan 1, 2015