Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Sampling and Weighing

    I have chosen this subject in view of the fact that, while there are many and ample opportuuities of getting reliable assays made, there are but few who are in a position to obtain reliable data on th

    Jan 1, 1901

  • AUSIMM
    Flotation of Fine Coal from Bulli, Greta and Victoria Tunnel Seams

    Factors of importance in the ntilization of coal fines are mentioned, and the results of flotation tests on coal fines from three important coal seams in New South Wales are presented.INTRODUCTIONEcon

    Jan 1, 1961

  • AUSIMM
    Maximising Recovery at Silver Swan Nickel Mine using Cement Stabilisation

    By P R. Lock

    The Silver Swan nickel mine is located at the Black Swan Nickel Project, 53 km north east of Kalgoorlie, Western Australia. The Silver Swan orebody is a massive sulphide nickel deposit dipping 70¦ eas

    Jan 1, 1998

  • AUSIMM
    Correlations among CO2, Cl, 3He and Heat Discharged from Geothermal Systems of the Taupo Volcanic Zone, New Zealand

    Based on relative CO2, N2, and 3He contents, geothermal systems of the Taupo Volcanic Zone, TVZ, can be subdivided into two major groups: arc-type systems, associated with andesitic magmatism along th

    Jan 1, 1995

  • AUSIMM
    Extraction of Vanadium from N.Z. Steel Slags using a Salt-Roast/Leach Process

    By Kelly E. G

    NZ Steel's flushing slag typically contains 1.2 per cent V203. Extraction of vanadium from powdered slag using a salt (NaCI or Na2CO3) roast/leach process was investigated. With NaCl, optimum ext

    Jan 1, 1982

  • AUSIMM
    Analysing and Rehabilitating Rock Mass Failure in Critical Mine Infrastructure

    To optimise the haulage of the large tonnages produced from stopes in this high production gold mine, an ore pass and feeder system was introduced. This ore pass was designed and developed in 2006 and

    Nov 25, 2010

  • AUSIMM
    Capping Stations on Broken Hill South Ltd.

    In the Broken Hill South mine tile practice of issuing to the miner a quantity of fuse and a box of caps from which he made up the "rods" required for a particular blast, has been abandoned.

    Jan 1, 1932

  • AUSIMM
    Pneumatic Stowing of Mill Residues in Underground Stopes, Broken Hill South Limited

    Two of the problems long associated with the complete extraction of level pillars in the wide ore bodies of Broken Hill have been: (1) The high cost of maintaining level gangways through areas of slow

    Jan 1, 1941

  • AUSIMM
    The Geological Setting of Indonesian Coal Deposits (5d16c44c-7b7a-4584-8eca-7b8d24e9db01)

    By R P. Langford, T A. Moore

    Indonesia over the last 15 years has experienced a surge in coal exploration, which has led to the development of a major export industry. This coal exploration has improved the understanding of the g

    Jan 1, 1999

  • AUSIMM
    Designer Tailings – An Integrated Model for Tailings Management

    By T Baumgartl, T Huynh, K Tungpalan, E Wightman, M Edraki, M Tayebi-Khorami, L Huang, S Palaniandy, E Manlapig

    With the increasing rate of tailing production worldwide there is a growing concern about the hazards of tailings storage facilities (TSF). Past and current mining, processing and waste disposal strat

    Jul 16, 2014

  • AUSIMM
    Resource Estimation Practice, Macraes Gold Project

    By M Stewart

    In January 1994, Macraes Mining Company started a new phase of exploration to find additional resources along strike and down dip of identified resources for a mill that was being expanded from 2.1 Mt

    Jan 1, 1997

  • AUSIMM
    Increasing the deportment of titanium species to, and the stability field of pseudobrookite phase for valourisation of titaniferous slags

    By J Nell, J Petersen, X C. Goso

    The feasibility of increasing the deportment of titanium species and the stability of the pseudobrookite solid solution (M3O5) in a titaniferous slag was investigated, to facilitate the valourisation

    Jun 19, 2024

  • AUSIMM
    "The Business Case for Early-stage Implementation of Geometallurgy– an Example from the Productora Cu-Mo-Au Deposit, Chile"

    By J L. Macdonald, G S. King

    "The development of a predictive geometallurgical model is a multidisciplinary and iterative task that involves both discovery and integration aspects. In this paper, the authors discuss the concepts

    Jun 15, 2016

  • AUSIMM
    Stratigraphic, Mineralogical and Physical Variations at Waikato - North Head, South Auckland: Preliminary Results

    By D Pastars, J L. Mauk

    Located at the southern end of the Awhitu

    Jan 1, 2001

  • AUSIMM
    An Integrated Solution for Project Cost Control

    Project cost control procedures and computer systems have enjoyed a successful and simple relationship over the past decade, thanks primarily to the proliferation of portable computers or PC's

    Jan 1, 1990

  • AUSIMM
    Possibilities and Working of the Specific Agglomeration of Fibrous Materials and Residues

    Possibilities and Working of the Specific Agglomeration of Fibrous Materials and Residues Plant based fibrous materials are becoming of increasing interest in a multitude of industrial applications.

    Sep 13, 2010

  • AUSIMM
    Esmeralda Mine Exploitation Project

    By P Crorkan

    Within the framework in which future exploitations for Codelco-Chile Divisi=n El Teniente are situated, regarding the deepening of its reserves and the geotechnical problems that affect their recovery

    Jan 1, 2000

  • AUSIMM
    A Case for Revision of Time-Honoured Mine Ventilation Design Parameters through Active Field Observations

    By B Belle

    "Mines around the world are inherently and operationally diverse. Current methodologies for the design of mine ventilation and cooling infrastructure involve controlling major safety and health hazard

    Jun 1, 2012

  • AUSIMM
    Development of a Special Purpose Coupling for Jointing Polyurethane Lined, High Pressure Pipework

    The New Zealand Steel Ironsand Slurry Pipeline was successfully commissioned in February 1986. The project includes 18 km of high pressure, polyurethane lined buried pipe. McConnell Dowell Constructo

    Jan 1, 1986

  • AUSIMM
    Be Open to Closure - It Can Save You Money

    By J Heyes

    Historically mining engineers haven't spent enough time planning waste dumps, but waste movement costs often outweigh ore haulage costs. There is a real incentive to plan waste dumps right the fi

    Jan 1, 2009