Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Copper Refining and Production of Semi-fabricated Products at Copper Refineries Ltd

    Within CRLÆs lifetime there have been a number of products that have proceeded through their life cycles. In each case market forces and technological advances have forced the cessation of the product

    Jan 1, 1998

  • AUSIMM
    A Fundamental Study on Bacterial Oxidation of Sulphide Minerals

    A study of the bacterial oxidation of naturally occurring high-purity sulphide minerals (FeS2, Fel_xS, CuFeS2, Cu2S) has been conducted using a mesophilic strain of T. 6ejtAooLcdcth4. As well as me

    Jan 1, 1984

  • AUSIMM
    Computer Simulations to Enable Continuous Blending to Two Plants at Sishen Mine From the Medium-Term Point of View

    Sishen uses a state-of-the-art tracking system to track material from its position in blast blocks through various stockpiles and crushers. Qualities are blended directly to the crusher as opposed to

    Jan 1, 2005

  • AUSIMM
    Comparison of Sulfide Oxidation in Unweathered Pyritic Mine Tailings

    By R Herbert, M E. Malmstr÷, S U. Salmon

    The study focuses on sulfide oxidation processes in unweathered pyrite-rich mine tailings from a soil-covered impoundment in northern Sweden. To simulate the oxygen-limited conditions in water saturat

    Jan 1, 2003

  • AUSIMM
    Recovery of the northern mining block at Cliffs Nickel Mine

    By M Hopkins, A Mutale, A E. Vidal da Silva

    The Cliffs Nickel Mine extracts a narrow near vertical nickel vein using a mining method of underhand bench stoping with paste backfill. In 2014, at a depth of 400 m below surface, the Northern block

    Mar 15, 2021

  • AUSIMM
    Sustainable Steel Plant on an Environmental Protection Area

    By C A. Chaves

    During most of its history, the metallurgical industry has been seen as a source of pollution for the environment. However, during the second half of the 20th century, as the world environmental legis

    Jan 1, 2009

  • AUSIMM
    A Dynamic Sediment Simulation to Predict the Variability of Suspended Solids Concentrations over Life-of-Mine for Application to a Risk-based Environmental Assessment

    By M Ind, B Usher

    Environmental regulators are increasingly adopting risk-based approaches to protect aquatic ecosystems. The Australian and New Zealand Environment and Conservation Council (ANZECC) and the Agriculture

    Jul 16, 2014

  • AUSIMM
    Extension Hill Direct Ship Iron Ore Project – Seven Years in the Making

    By R Forster

    Direct ship iron ore (DSO) operations at Extension Hill in Western Australia’s Midwest region have commenced, with fi rst product railed to the port of Geraldton in July 2011. Reserves are 14.8 millio

    Jul 11, 2011

  • AUSIMM
    A Remote, Rapid and Accurate Three-dimensional Ore Waste Boundary Tracking System

    By A T. Spathis, K E. Leslie, K R. Blay

    Many open pit mining operations seek to control blasting-related movement of ore and waste to minimise loss and dilution. Tracking the movement of ore boundaries can result in the maximisation of ore

    Aug 24, 2015

  • AUSIMM
    The Mineral Composition of the Yerranderie Silver-Lead Ores

    The silver-lead ores of Yerranderie occur in a series of narrow, flat-dipping lodes in small bodies of quartz porphyry, intrusive into Upper Devonian volcanics, which are exposed in the western flank

    Jan 1, 1953

  • AUSIMM
    Design and calibration of a climate resilient Type B (adapted) sediment basin at the Dugald River Mine in the north-west Queensland minerals province

    By A Harburg, A Dendys, G Green

    Dugald River Mine (DRM) is located approximately 85 km north-east of Mount Isa, and 65 km northwest of Cloncurry, in the north-west Queensland Minerals Province of Australia. DRM is an underground ope

    Aug 2, 2023

  • AUSIMM
    The Mine Management System at Olympic Dam Mine

    The operations management system at Olympic Dam has evolved over a two-year period to the state described in this paper. This evolution has been driven largely by the requirements of the recent expans

    Jan 1, 2000

  • AUSIMM
    Potential Energy Sources for the Mining Industry in Australia

    By Tapp BA

    Australia, considered an energy and mineral resource rich country, is poised on the verge of a major mineral industry 'boom'. It has been repeatedly emphasised that this growth in the mi

    Jan 1, 1981

  • AUSIMM
    You don’t know what you don’t know

    By P Micale

    Geological data provides the foundations for the mining value chain. It is used to underpin the modelling and planning and consequently optimise downstream business decisions. However, it is often for

    Mar 22, 2022

  • AUSIMM
    Conclusions from long-term cover system performance monitoring – a case study

    By R Barritt

    Remedial options for a waste rock dump (WRD) were considered as part of closure planning studies at an active mine in Western Australia. To minimise the impact of any seepage from the landform it was

    Jul 25, 2018

  • AUSIMM
    Study on Treatment of Wastewater Containing Heavy Metal Ions Using Modified Oceanic Cobalt-Rich Crusts

    Study on Treatment of Wastewater Containing Heavy Metal Ions Using Modified Oceanic Cobalt-Rich Crusts

    Sep 13, 2010

  • AUSIMM
    A Review of Sublevel Stoping

    A review of the factors controlling stope wall behaviour such as excavation geometry, rockmass strength, induced stress, ground support, blast damage and drill drive layout is undertaken. In addition,

    Jan 1, 2000

  • AUSIMM
    Evolution of Vertical Crater Retreat Mining at Mindola Mine, Zambia

    By C Katonga

    Mindola mine is currently the deepest mine in the Zambian copper belt. Stoping is currently active to 1330 m below surface with long range plans indicating future production from 1590 m level. The ore

    Jan 1, 2000

  • AUSIMM
    Improvements in Service Life and Cost Reduction for Gyratory Primary Crushers through Mantle and Concaves Optimisation – A Case Study

    By I Elias, E Moya, S Chaffer

    This paper is based on a case study from a mine site that operates two gyratory primary crushers. These crushers were encountering problems, which included inconsistent P80, reduced liner life tonnage

    Jul 13, 2015

  • AUSIMM
    Real time LHD dispatch optimisation with ratio targets at Newcrest’s Cadia Valley Operations

    By S N. Donaldson, B L. Hollis, K Wynn, L Potts, M Evans

    A real-time load-haul-dump (LHD) dispatch optimisation tool has been deployed at Panel Cave 1 and Panel Cave 2 at Newcrest’s Cadia Valley Operations. The tool, known as ORB, is the first known success

    Mar 15, 2021