Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
  • AUSIMM
    Vertical Crater Retreat Pillar Mining-A Case Study

    The Vertical Crater Retreat (VCR) mining method was used to mine two rib pillars at New Broken Hill Consolidated Limited (NEHC) mine at Broken Hill. Experience gained in a trial VCR pillar stope w

    Jan 1, 1983

  • AUSIMM
    Site Water Balance Response to Variable Climatic Conditions

    By S Hawker, M Gibbs, A Craven

    Current climate change projections suggest both an increase in the intensity of significant rainfall events and an increase in the variability of rainfall in some regions of Australia. It is necessary

    Nov 26, 2013

  • AUSIMM
    Profitability, Sustainability and Community Development - Is There a Contradiction? A Case of Gold Fields' Driefontein Gold Mine in South Africa

    Since the days of Adam Smith and Milton Friedman the discussion of corporate citizenship and sustainability has been flooded with multiple contradictions, with proponents of sustainability saying that

    Jan 1, 2009

  • AUSIMM
    Monitoring Degradation of Coke within the Blast Furnace via Tuyere Coke Sample

    BHP Steel International's Newcastle blast. furnaces have operated since their caimissioning on cake based on local low rank coals. In the early 1960's Newcastle coke was believed to be t

    Jan 1, 1987

  • AUSIMM
    Civil, Criminal and Professional Liability of Experts or ""Caveat Expert""

    By Jackson E

    The general level of awareness amongst members of the professions that they are faced with an increasing number of claims for breaches of their professional duty was dramatically heightened by the d

    Jan 1, 1989

  • AUSIMM
    Interacting with the Daily Operations and the Need to Plan for Future Rehabilitation

    Mine site rehabilitation is the repair of the disturbance caused by mining on the immediate mining area and also on the surrounding environment. The long-term objectives of rehabilitation can vary fro

    Jan 1, 2007

  • AUSIMM
    Improving Blasting by a Team Approach at the Henty Gold Mine

    By R Wedmaier

    Henty Gold Mine is an underground operation producing 100 000 ounces of gold per annum. The original mining method used was flatbacking with paste fill. However, a non-entry method û uphole benching û

    Jan 1, 2001

  • AUSIMM
    Some Real and Imaginary Examples of Volcanic Hazard and Risk Assessment

    An empirical method of estimating dense rock (D.R.E.) equivalent volumes erupted as airfall tephra, described in a companion paper in this volume, is elaborated, and its accuracy discussed. Estimates

    Jan 1, 1990

  • AUSIMM
    The role of scale in prediction of mine drainage chemistry

    By N McIntyre, M Edraki, K R. Jain

    From the very early stages of a mining project, there is a requirement to predict the chemistry of potential drainages from various waste storage facilities. However, using relative masses to scale ch

    Aug 2, 2023

  • AUSIMM
    Mining-RoX – Mobile Robots in Underground Mining

    By H Mischo, M Ferber, M Donner, B Jung, S Grehl, A Dietze

    Mobile robots have been making impressive inroads in a variety of domains. Within the Mining-RoX project, Technical University Bergakademie Freiberg is exploring a further frontier for mobile and auto

    Nov 4, 2015

  • AUSIMM
    No. 3 Shaft Winders and Winder House

    The sinking of the new No. 3 Shaft being mainly concerned with providing for the continuation of mining operations north of the existing workings, requirements for the shaft and haulage equipment were

    Jan 1, 1957

  • AUSIMM
    Professional Development for Metallurgists – Improving Technical Skills

    By D Drinkwater

    In 2009, Peter Munro and Peter Tilyard examined the “human capital” in the mineral processing sector in a paper entitled Back to the Future (Munro and Tilyard, 2009). One of their major concerns was

    Aug 8, 2011

  • AUSIMM
    Going Deeper - Has Your Mine Plan Fully Considered Ventilation?

    By P Gardner

    The Kanowna Belle gold mine in Western Australia has reached a depth of 1000 m on the way to 1300 m. A feasibility study undertaken in 2006 identified the mining of E-Block as both technically and com

    Jan 1, 2008

  • AUSIMM
    What is the Future for Magnetite Projects in Australia and Why Have Some of the New Projects Been So Problematic?

    By D Connelly

    Magnetite orebodies generally means mining lower grade iron ores, crushing and grinding with significant energy costs in processing and the capital costs being significantly higher than for direct shi

    Jul 13, 2015

  • AUSIMM
    Grade Control Procedures at the Iron Prince Quarry Whyalla, South Australia

    The Iron Prince orebody occurs within the Lower Middleback Jaspilite Horizon of the Middleback Group and consists of hematite within host rocks of jaspilites and schists. The ore was probably the pr

    Jan 1, 1971

  • AUSIMM
    Pillar Design Procedures and Research Methodologies - Can There or Should There be a Unified Approach?

    After some 50 years of worldwide research in relation to coal pillar mechanics and design as well as numerous workshops and technical papers related to these issues there is still some significant dis

    Nov 25, 2010

  • AUSIMM
    Use of drone and LiDAR technology for mapping underground voids

    By D Woolmer

    Since January 2019, BHP Olympic Dam have been trialling the use of a drone based LiDAR mapping system for the purpose for surveying stope voids. This new technology utilises Simultaneous Location and

    Mar 15, 2021

  • AUSIMM
    The Use of Field Measurements of Hydraulic Conductivity to Characterise the Performance of Reclamation Soil Covers With Time

    By L S. Barbour, M K. Meiers

    Soil covers for mine waste are subject to changes in structure as a result of root development, and wet/dry or freeze/thaw cycling. The purpose of this study was to evaluate the changes in the hydraul

    Jan 1, 2003

  • AUSIMM
    Five Years With Paste Fill ù Experience at Henty Gold Mine

    By T J. Grandfield

    Paste fill has been used successfully at Henty Gold Mine for the past five years. It has allowed 100 per cent extraction of the orebody, stabilised poor ground and enabled wide sections and offsets to

    Jan 1, 2002