Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Experimental study and thermodynamic modelling of phase equilibria in the FeO-FeO1.5-SbO1.5-SiO2 system in equilibrium with metal

    By C Zschiesche, alam, A Abadias Llamas, A K

    An integrated experimental and thermodynamic modelling study of the phase equilibria in the FeOFeO1.5- SbO1.5-SiO2 system in equilibrium with liquid Sb and Sb-Ag metal has been undertaken to develop t

    Jun 17, 2024

  • AUSIMM
    Radical involved reaction and weak magnetic effect between alumina refractory and high alumina slags

    By S H. Li, H Z. Gu, A Huang

    High aluminium steel is a promising advanced steel known for its exception properties and holds significant economic and strategic importance. However, the CaO-Al2O3-SiO2 based slag with high alumina

    Jun 19, 2024

  • AUSIMM
    Geology of the Honeymoon Uranium Project

    By M H. Randell, J B. Haines

    The Honeymoon Uranium Project comprises the Honeymoon Deposit,Goulds Dam Deposit and Yarramba Prospect in the Southern Lake Fromeregion, South Australia. Both the Yarramba Prospect and HoneymoonDeposi

    Jan 1, 2001

  • AUSIMM
    Considerations for Design of Production Level Drawpoint Layouts for a Deep Block Cave

    By P Bartlett, K Naidoo

    Premier Diamond Mine is planning a new, mechanised, block cave, with a production level approximately 1000 m below surface. A high degree of tunnel damage is expected, due to stress and the relatively

    Jan 1, 2000

  • AUSIMM
    Blast Design and Vibration Control at Kayad Lead-Zinc Underground Mine

    By P S. Jaitawat, M Sarim, M P. Roy, P K. Singh, A Joshi

    Mining is being carried out using the sublevel open stoping method at the Kayad underground mine. The mine will ultimately reach a depth of 390 m. Kayad village is only 100 m (horizontally) from the u

    Aug 24, 2015

  • AUSIMM
    Keeping Projects on the Rails

    By J Canterford

    Although we have access to a wide range of sophisticated process design and improvement tools in combination with a significant range of case studies, the mineral resource industry still manages to be

    Aug 8, 2011

  • AUSIMM
    Rehabilitation of Pasminco Broken Hill Mine North Operation

    By J Burgess, G Scanlan

    In 1993 after over 110 years of mining operations, production ceased at the Broken Hill North Mine. Following the cessation of operations a rehabilitation program was developed to satisfy the requirem

    Jan 1, 1998

  • AUSIMM
    Native Grasses: Their Potential Use in Revegetation of Disturbed Sites in the Wet-Dry Tropics

    By Gray E, Banks J

    In mine site revegetation, exotic grasses are more commonly used than native grasses. This is due to unavailability of native grass seed on a commerical scale and lack of information on agronomical

    Jan 1, 1994

  • AUSIMM
    Hoisting Technology ù Going to New Capacities and Depths

    Drum winders have now been built to attain depths of 3000 m and more in a single lift in accordance with the South African Code of Practice SABS 0294, which was introduced at the time of the last hois

    Jan 1, 2005

  • AUSIMM
    Should the Blast Exclusion Zone Be Based on a Qualitative or Quantitative Analysis? A Practical Implementation Conundrum

    By K Muller, T Oosthuizen

    Blast exclusion zones are instrumental in protecting equipment and personnel. When there is no constraint in footprint, the exclusion zone can be enormous, practically eliminating the hazard of flyroc

    Aug 24, 2015

  • AUSIMM
    Mining Reactive Shale at BHP Billiton's Mt Whaleback Mine ù Challenges and Solutions

    The mineralised members of the Brockman Iron Formation mined at Mt Whaleback are overlain and underlain by shale horizons. To maximise resource recovery, waste movement within the life of mine plan in

    Jan 1, 2002

  • AUSIMM
    Distributed Collaborative Immersive Virtual Reality Framework for Future Mine Scenarios

    By T Bednarz

    The present work proposes a distributed collaborative immersive virtual reality framework for prospective applications in the mining industry. A human-centered approach is described, with people being

    Nov 22, 2011

  • AUSIMM
    Integration of Mine Planning with Groundwater Modelling to Optimise Mine Closure Plans at the Marillana Creek (Yandi) Mine

    By K Rozlapa, P Waters, H Middlemis

    A major challenge for closure planning at mining operations below the water table is evaporation from final void pit lakes and concentration of salts, which can impact on downstream groundwater (and s

    Jan 1, 2006

  • AUSIMM
    Reduction of Airborne Dust on the E48 Extraction Level at Northparkes Mines

    By C Vejrazka, A Wyllie

    A common problem faced by underground mining operations around the world is airborne dust sourced from production and auxiliary processes. In most underground mining methods, air is generally directed

    Mar 24, 2014

  • AUSIMM
    Geologists and the Value Chain – How Material Characterisation by Modern Mineralogy can Optimise Design and Operation of Processing Facilities

    By K Ehrig, C Lower, V Liebezeit, M Smith, E Macmillan

    "Minerals, minerals, minerals. Elements occur in the earth as minerals. If local physical, chemical and structural conditions are conducive to concentrating these minerals to sufficiently high abundan

    Aug 18, 2014

  • AUSIMM
    Speiss Lump Formed at the Bottom of Copper Blast Furnace

    Completing its historical role the opera tion of copper blast furnace of the Saganoseki Smelter was terminated in 1970, but it left some interesting data on metal lumps formed at the furnace bottom

    Jan 1, 1980

  • AUSIMM
    A Simplified Creep Analysis for Low Strength Seams in Rock Pillars

    By M Habte

    This paper presents a simplified method for the assessment of creep deformations in rock masses containing bands of low strength or soil strength rock. The main impetus for this work was the need to a

    Mar 8, 2011

  • AUSIMM
    Partial Automation of a Dragline Working in Conjunction with a Hopper/Crusher/Conveyor Overburden Removal System

    By Susanto A

    As part of the current NERDDC funded project studying Dragline/Hopper/ Crusher/Conveyor systems for overburden removal, an investigation was carried out to assess the feasibility of automating the

    Jan 1, 1989

  • AUSIMM
    Microbiology in the Extraction of Metals from Complex Ores

    By Lawson E, Purkiss S. A R, Van Ashwegen p C

    It is only in the past decade or so that industrial exploitation of biological resources and techniques has become regarded as a distinct discipline. Commonly referred to as Biotechnology, it embra

    Jan 1, 1995

  • AUSIMM
    The Dynamics of Coupling Between Deformation and Fluid Flow in the EarthÆs Crust: Implications for Ore Genesis

    Permeability and fluid pathways in fracture-controlled hydrothermal systems are governed by a dynamic competition between permeability-creation processes and permeability-destruction processes. Permea

    Jan 1, 2005