Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Heap Leaching

    The preferred alternatives in heap design and their motivation are identified as- -normal heap leaching, to be generally applied wherever possible, - flooded vat leaching, to be appliedwhere wetted or

    Jan 1, 1984

  • AUSIMM
    Pemali Open Pit Mine Slope Stability Problem

    By Bhattacharyya A. K>

    The Pemali Open Pit Mine is situated in a small island called Bangka in Indonesia. It produces approximately 165,000 m3/year of tin ore with an average grade of 3.67 kg/m' of tin from a primary

    Jan 1, 1989

  • AUSIMM
    Longwall Mining at Appin Colliery

    A four monthly period was analysed for each retreating longwall face which indicated that output increased from 1140 tonnes/day for Longwall 1, to 1620 tonnes/day for Longwall 2 and to 2090 tonnes

    Jan 1, 1976

  • AUSIMM
    Construction of the Molineux Facility Underground LPG Storage Cavern

    The underground storage of LPG and other hydrocarbons is in current commercial use in Northern Hemisphere countries in Europe, Asia and the USA.Elgas Pty Ltd, a 50 per cent joint venture between AGL a

    Jan 1, 1999

  • AUSIMM
    The integration of mine-to-mill and grade engineering at Anglo American’s Los Bronces Mine using IES

    By J Rutter, E Amini, D La Rosa, N Beaton, M Scott, F Faramarz, L Keeney

    Anglo American’s Los Bronces copper mine in Chile has been conducting detailed assessments investigating value adding options for their asset. The mine has conducted several detailed Mine-to- Mill and

    Nov 10, 2020

  • AUSIMM
    Autogenous Grinding in the Warrego Concentrator of Peko Mines N.L.

    By Stevenson C. H, Lynch A. J

    The reasons for choosing autogenous grinding for the new Warrego concentrator of Peko Mines N.L. are discussed and the ores to be treated in the concentrator are described. The mill was designed on t

    Jan 1, 1974

  • AUSIMM
    Dartbrook Mine - A Case Study

    Any project carries a number of challenges and risks. Inappropriate design, poor project management, time, industrial disputation and capital over runs are all areas which can impact on a project cash

    Jan 1, 1998

  • AUSIMM
    Ore Treatment at Renison Limited

    Renison Limited produces high and low grade tin concentrates at an annual rate of 5000 tonnes of contained tin metal. In spite of the fine average cassiterite grain size, emphasis is placed on grav

    Jan 1, 1977

  • AUSIMM
    The Underground Quarrying of Backfill Material - A Potentially Viable Option

    By A C. Robertson

    Studies by Tennent, Isokangas Pty Ltd (TIP) have indicated that underground quarrying of backfill may be a cost competitive option for providing backfill for specialised situations in underground mini

    Jan 1, 1998

  • AUSIMM
    Implementation of the BIOX® process at the Runruno Gold project

    By J A. van Niekerk, J G. Jardine, J W. Olivier

    The Runruno Gold Project is located on the island of Luzon, approximately 200 miles north of Manilla in the Philippines. The mine is an open cut operation and uses the proven BIOX® and carbon-in-

    Sep 11, 2017

  • AUSIMM
    Mineralogical Factors in the Processing of Archean Sulphide Gold Ores

    In the past ten years or so there has been a renewed interest worldwide in the processing of refractory gold ores. The Archean province of Western Australia contains both numerous and major gold de

    Jan 1, 1991

  • AUSIMM
    Continuity Risk in Narrow Reef Gold Deposits - Implications for Evaluation and Exploitation

    By I M. Platten

    Narrow reef gold deposits are generally less than 4 m in width and relatively complex geological phenomena. They often display variable geometry, attitude, continuity and internal architecture. Econom

    Jan 1, 2008

  • AUSIMM
    Unique Experience of Controlling Active Spontaneous Heating in the Working BG Panel Goaf at GDK 8 Incline, RG-II Area ù A Case Study

    By B Veera Reddy

    For thick seam extraction, the Blasting Gallery (BG) method is ideal for obtaining the maximum percentage of extraction at fast rates. The continued use of this mining method is threatened by strata c

    Jan 1, 2005

  • AUSIMM
    The Underground Quarrying of Backfill Material - A Potentially Viable Option (3e0fe107-4258-4ea0-abd2-b85d48fc35ff)

    By Robertson AC

    Studies by Tennent, Isokangas Pty Ltd (TIP) have indicated that underground quarrying of backfill may be a cost competitive option for providing backfill for specialised situations in underground mi

    Jan 1, 1998

  • AUSIMM
    Process Control - A Technology for the Present and Future

    By DJ McKEE

    Process control emerged in the mid-1960s as a new and exciting method of improving the performance of mineral processing operations. The early Australian developments, principally in Broken Hill and

    Jan 1, 1992

  • AUSIMM
    Basic Considerations In Vegetating Areas Affected By Mining Activities

    In attempting to vegetate pnob!em sites some basic pn.i,ne%ptes, namely the phys.ica.e and chemi.ca2 pnope/ti;es og the problem mateni.al and the selection oU hu.itab.2e p!antts {cor pnopagati.on,

    Jan 1, 1976

  • AUSIMM
    Unique Coal Mine Drift Construction Method

    By C Donnelly

    Redpath Australia is using a unique mining method for the Australian underground coal industry at Kestrel Mine Extension in the Bowen Basin, Central Queensland.The project involves completing two sepa

    Mar 21, 2011

  • AUSIMM
    Modelling metal recovery by co-kriging the feed and concentrate masses of metal

    By P Dowd, A Adeli, C Xu, X Emery

    Geometallurgical modelling is increasingly being incorporated into mineral resource modelling and estimation as a means of increasing efficiency, decreasing operating costs and reducing risk in mining

    May 24, 2023

  • AUSIMM
    The Sorby Hills, W.A., Lead-Silver-Zinc Province

    By Lee RJ

    A significant basemetal province is recognised in the southern part of the Bonaparte Basin, Western Australia. Epigenetic stratabound carbonate hosted Pb-Ag-Zn mineral- isation occurs in dolomites

    Jan 1, 1986

  • AUSIMM
    Piling and Raise Bore Construction – Key Learnings from a Client’s Perspective

    By R Austerberry, S Green

    Highly weathered ground, limited collar options and the need to achieve a desired outcome at the lowest possible cost led to the need to adopt a construction approach that had no established design me

    Mar 24, 2014