Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Production and Ventilation Management Towards in Integrated Mine Information System

    By Ward M

    The current and future requirements for an underground mine information management system are being met with a flexible, value-engineered approach to mine information/communication infrastructures.

    Jan 1, 1995

  • AUSIMM
    Production of Cadmium Metal at Cockle Creek

    By Bowmaker MD

    Zinc and lead sulphide flotation con centrates containing from 0.02 to 0.20% Cd are roasted on an updraught sinter machine at the Cockle Creek Works of Sulphide Corp- oration Pty. Limited to provide

    Jan 1, 1972

  • AUSIMM
    Simulation study on crucial parameters of long-compressive and shortsuction ventilation in large section roadway excavation of LongWangGou coalmine

    By H Wen

    LongWangGou coalmine auxiliary inclined shaft heading face has a large section, fast heading speed, and large dust production. The problems of high concentration and wide distribution of dust in the r

    Oct 12, 2022

  • AUSIMM
    Mine to mill study – Bond Work index as factor for intrusive and non-intrusive rock type

    By W F. E Ouedraogo

    This study data has been collected on a three-month period from November 2020 to January 2021 and based on three different pits: Vindaloo Main, Vindaloo Central and Bouere. Both pits having specific g

    Jun 22, 2022

  • AUSIMM
    Creating a Geotechnical Baseline Report for Project Hobson, Auckland

    Project Hobson involves the replacement of an existing 90-year-old above-ground sewer that crosses Hobson Bay in Auckland, New Zealand, and which is nearing the end of its economic life, with a 3 km l

    Jan 1, 2008

  • AUSIMM
    Techno-Economic Methods to Consider in Designing an Optimal Shaft System in Anglo Platinum

    By C P. de Jager, J J. Taljaard

    Over the past 75 years, the mining of platinum has predominantly focused on the Merensky Reef horizon in the western Bushveld region of the Bushveld Igneous Complex (BIC) of South Africa (Figure 1). T

    Jan 1, 2005

  • AUSIMM
    Brisbane Airport Link Earth Pressure Balance Machine Two Component Tailskin Grouting – A New Australian Record

    By A Reschke

    The Thiess John Holland Group is undertaking the design and construction of Brisbane’s Airport Link Project, the largest single investment in transportation infrastructure in Australian history. Twin

    Mar 8, 2011

  • AUSIMM
    Chasing the Lead/Zinc/Silver Lining – Establishing a Resource Model for the Historic CML7, Broken Hill, New South Wales, Australia

    By D Smith

    The Broken Hill deposit is located in Australia in the far western region of New South Wales. The deposit was found in 1883 and has been mined continuously since its discovery. It is considered the la

    Aug 22, 2011

  • AUSIMM
    Development Practice and Ground Support Installation at Northparkes E26 Mine

    The Northparkes E26 Mine is AustraliaÆs first block cave mine. This paper presents an outline of the design and construction philosophies that drove the project development and details the excavation,

    Jan 1, 1999

  • AUSIMM
    Sampling of the Yeelirrie Uranium Deposit, Western Australia

    The discovery of economic uranium miner alisation in unique geological conditions at Yeelirrie, 700 km NNE of Perth, presented Western Mining Corporation Limited with a num- ber of sampling and eval

    Jan 1, 1976

  • AUSIMM
    Making Rectangular Tunnels with the Mobile Miner

    Throughout 1992 Pasminco conducted field trials of the Mobile Miner MM130 at Broken Hill. The goal was to develop the machine to achieve acceptable reliability and establish production rates.

    Jan 1, 1993

  • AUSIMM
    Chromium and Rare Earth Elements Mobility by Sodium-bearing High-temperature Hydrothermal Solution – An Example from Mantle Diopsidite and Crustal Diopsidite

    By N Akizawa, A Tamura, S Arai

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Reaction products between high-temperature hydrothermal solution/uppermost mantle peridotit

    Mar 18, 2015

  • AUSIMM
    BHP Billiton West Australian Iron Ore Geometallurgy - Past, Present and Future

    By M Flanagan, T Sua, B Wright, T Carroll, B Van Dijken

    "BHP Billiton (BHPB) West Australian Iron Ore (WAIO) conducts an extensive geometallurgy (geomet) program for its iron ore deposits in the Pilbara. The geomet program provides accurate information to

    Sep 29, 2013

  • AUSIMM
    Comparison of the Generation of Shear Wave with Different Simulation Approaches

    By M Chen, Q D. Gao, Y G. Hu, P Yan, W B. Lu

    The safety and stability of construction structures are often affected by blast-induced waves. Investigating the generation mechanism of shear wave (S-wave) during blasting is important, because it ha

    Aug 24, 2015

  • AUSIMM
    Grade Distribution and Grade Control Procedures, Great Lady Gold Deposit, Eastern Goldfields, WA

    The Great lady gold deposit presented the challenge of providing a new grade control system for an usual type of orebody in the Eastern Goldfields. Mineralisation occurs as secondary enrichment about

    Jan 1, 1990

  • AUSIMM
    Eloise Copper Mine Geology ù Back to Basics

    By A Baensch, E Grimsley

    Eloise Copper Mine is situated 56 km east-southeast of Cloncurry, Queensland, Australia. The deposit was discovered by BHP Minerals in 1986 during follow up diamond drilling of EM anomalies associated

    Jan 1, 2003

  • AUSIMM
    The Use of Non-destructive Testing to Identify Defective Rock Bolts – A Case Study

    By B Jones, M Chappell

    Permanent rock bolts used to support rock tunnels are required to perform for the design life of the structure as a minimum. Quality of installation is critical to the performance over the life of the

    Sep 17, 2014

  • AUSIMM
    Managing mining fatality risk

    By P Nissen, T Jenke, M Ralph, M Cattani, M Quinlan

    The West Australian Government hold an annual ‘Mines Safety Roadshow’ around the State’s regions and the capital city, Perth. Each year presenters provide an update on legislation and safetyrelated th

    Apr 16, 2024

  • AUSIMM
    Vertical Pit Mining - A Novel Alternative to Open Pit or Underground Methods for Mining of Appropriate Massive Shallow Orebodies

    By P J. Terbrugge

    The concept of vertical pit mining has been developed as an alternative mining method for the exploitation from surface of small, vertical or near-vertical, massive orebodies down to depths of some 20

    Jan 1, 2000

  • AUSIMM
    Cemented Rockfill OptimisationùThe Rock Attrition Model and Fill Raise Orientation Effect

    By J Szymanski, S Planeta

    In pursuit of optimising the cemented rockfill system fragmentation of the aggregate, while travelling through the surface-to-underground aggregate transport raise, was investigated and a æfines estim

    Jan 1, 1998