Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Large Scale Rheoignimbrite Eruptions and Their Sources: An Example from the Springbok Quartz Latites of the Goboboseb Region, NamibiaBy Milner SC
Four quartz latite rheoignimbrite units (units I to IV) mapped in the Goboboseb Mountains have been traced to their eruptive source, the Messum intrusive complex; this is a complex multistage ring str
Jan 1, 1990
-
Geotechnical Shaft Reconciliation at Oyu Tolgoi, MongoliaBy A Purvee, M F. Lee, L J. Mollison
Oyu Tolgoi is a large Cu-Au porphyry deposit in the south Gobi desert, Mongolia. The first of several deep, large-diameter, concrete-lined shafts, Shaft 1, is nearing completion. It will have a finish
Jan 1, 2008
-
Productive Partnership – Controlling Vibration and Maintaining Critical Electricity SupplyBy M Nagarajan
Orica Mining Services (Orica) in partnership with Coal and Allied’s Hunter Valley Operations (HVO) has developed a risk management process to maximise mining efficiency whilst controlling vibration an
Nov 8, 2011
-
Detonation and Breakage Performance of a Hydrogen Peroxide-based Explosive FormulationBy M Araos, I Onederra
A novel explosive formulation that substitutes the use of ammonium nitrate (AN) with hydrogen peroxide (HP) as the main oxidising agent has been developed and tested as part of an Australian Coal Indu
Aug 24, 2015
-
Selective Transport of Attached Particles Across the Pulp-Froth InterfaceBy J-P Franzidis
A technique for determining the recovery of attached particles across the froth phase in flotation that relies on measuring the rate at which bubble-particle aggregates enter the froth is used to inve
Jan 1, 2005
-
The Implementation of Bulk Emulsion Explosives at Big Bell Mine (5ba8492f-dd77-4906-9379-17f94c93e0d9)By J Player, K Braddon
High productivity mining is the key to the financial success and stability of modern mines. This can be achieved through the use of new technologies, the development of innovative work practices and o
Jan 1, 1999
-
The Implementation of Bulk Emulsion Explosives at Big Bell MineBy J Player, K Braddon
High productivity mining is the key to the financial success and stability of modern mines. This can be achieved through the use of new technologies, the development of innovative work practices andop
Jan 1, 1999
-
Venturi Scrubber System for Dust Control on a Longwall FaceBy Rao S. B, Baafi E. Y
A venturi based multi-scrubber air cleaning system has been developed for dust control along a longwall face in coal mines. The system consists of a number of scrubbers. strategically placed along the
Jan 1, 1995
-
The Underground Fire, Sealing and Subsequent Recovery of Liddell State Coal MineOn Monday, October 25th, 1971 at approximately 12.15 a.m. the night shift proceeding underground discovered smoke at No.1 and No-3 cut throughs on the eastern side of the belt heading and in close
Jan 1, 1972
-
A Preliminary Investigation of Hydrothermal Alteration at the Rahu and Ascot Epithermal Au-Ag Prospects, Southern Hauraki Goldfield, New ZealandBy P Licence, M Stevens, P Atkinson, J L. Mauk
The Rahu and Ascot epithermal Au-Ag prospects are two km north of the Karangahake deposit in the Hauraki Goldfield, and all occur in an approximately 6 km2 north-south elongated magnetic æquietÆ zone.
Jan 1, 2007
-
Proportion of Energy Attributable to ComminutionBy G R. Ballantyne, M S. Powell, M Tiang
This paper reviews the proportion of energy attributable to comminution within the Australian gold and copper mining sector. The need for this is motivated by inconsistencies in the quoted energy usag
Oct 29, 2012
-
The Mining Geology and Grade Control Practices of the Batman Deposit, Mt Todd ProjectMt Todd lies towards the south end of the Pine Creek Geosyncline, sandwiched between the Cullen Batholith and the Edith Falls Basin, in an area of regionally metamorphosed sandstones, siltstones and
Jan 1, 1994
-
A New Dry Processing Approach to Alluvial DepositsBy G R Ryan
Dissatisfied with conventional wet processing methods for alluvial deposits, Resource Trend Pty Ltd of Cairns set out to develop a better process. After comprehensive investigation of existing dry t
Jan 1, 1994
-
Integration of real-time, online, individual cyclone measurement at Cerro Verde – challenges and lessons learnedBy A Castillo, K Wiese, L Panduro Robles
For decades, organisations worldwide have been working to overcome challenges associated with new technology adoption while keeping up with rapid growth, development, and globalisation. In minerals pr
Aug 24, 2022
-
A New Mine Project - The 3000 and 3500 Copper Orebodies at Mount IsaThe large, high grade 3000 and 3500 copper orebodies at Mount Isa lie greater than 1200 m below the surface, and partly beneath the silver-lead-zinc mining operations at the Isa Mine.Since discovery o
Jan 1, 1993
-
A Second Derwent Crossing for HobartProposals for engineering works in the River Dement in recent years have been made in the context of very little geological informat- ion. Breakage of the Tasman Bridge, forced a complete re-apprai
Jan 1, 1977
-
Investigation of Gas-Dynamics of the Blast Furnace ProcessResults are presented of the investigation of gas dynamics of the blast furnace process obtained on laboratory models and operating furnaces. Gas residence times were measured using a helium tracer t
Jan 1, 1975
-
Aberfoyles Case History: Survival and Diversification through ExplorationThe company was formed in 1926 to exploit tin bearing veins adjacent to Aberfoyle Creek in north-east Tasmania. In 1928 a 923ft tunnel was driven to explore and develop the mine 150ft below surfac
Jan 1, 1987
-
A process-based approach to mine rehabilitation decision making using Bayesian modelling and risk-based principles for dispersive spoil rehabilitationBy E Thomas, L McCallum, G Dale, J Bennett, K Reardon-Smith, S Raine
Sustainable closure of coal mines in Australia to a safe, stable, non-polluting condition remains one of the industry’s biggest environmental and social challenges. A significant proportion of mines i
Jul 25, 2018
-
Water and Soil Management ResponsibilitiesBoth the miner and the Regional Water Board have legal obligations to ensure that all discharges of water from a mine site are free of harmful wastes, and that proper authorisation is obtained to abst
Jan 1, 1986