Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The SNIM Guelb II Project in Mauritania – Process Design Challenges

    By G Cooper

    The Société Nationale Industriel et Minière (SNIM) is expanding its ore and concentrate production capacity in Mauritania, West Africa. This government-controlled mining company has bee

    Jul 11, 2011

  • AUSIMM
    Gaskets for Segmental Tunnel Liners - New Development Since the Channel Tunnel

    Elastomeric compression gaskets for segmental tunnel liners are capable of fulfilling all sealing requirements for one pass constructed tunnels.Once the segments are mounted and the gaskets are compre

    Jan 1, 1993

  • AUSIMM
    Mount Isa Mines Limited Copper Leach SX-EW Pilot Plant

    During the 1960s chalcocite ore was mined from the Black Rock open cut. A large amount of this uneconomic material was not treated by the No 3 Concentrator at the time and as a consequence a surface s

    Jan 1, 1993

  • AUSIMM
    Thernodynamic Properties and Phase Diagram of the Copper-Lead BinaryAlloy System

    ABSTRACTFor the binary system copper-lead two relationsEquation 1andEquation 2have been derived for the activities of copper and lead at compositions and absolute temperatures within the liquid region

    Jan 1, 1971

  • AUSIMM
    Strata Control Considerations for Improved Mine Roadway and Panel Driveage Rates

    By Fabjanczyk MW, Nemcik JA, Matthews SM

    The major strata control considerations which affect the optimisation of roadway driveage in highly stressed strata is the performance of reinforcement placed and the extent of stress induced roc

    Jan 1, 1988

  • AUSIMM
    Development of a Taxonomy for Indexing Web-Based Mining Safety and Health Research

    To solve the mining safety and health needs of the future, access to, and sharing of, timely and relevant information will be crucial. The next generation of the Web will provide tools (RDF, OWL, SPAR

    Jan 1, 2008

  • AUSIMM
    Latest Developments in HPGR Technology ù Results of a Field Trial

    By N Patzelt, T C. Logan, I B. Klymowsky

    In 2003, NEWMONT MINING CORPORATION, the worldÆs largest gold producer, set out to prove that High Pressure Grinding Roll (HPGR) technology is sufficiently robust and reliable to be considered for the

    Jan 1, 2004

  • AUSIMM
    Field Parametric Geostatistics Geostatistical Rigorous Solutions Dealing with Extreme Grades During Resource Estimation

    By M Armony, J F. C L Costa, J C. Koppe

    Linear kriging methods fail to estimate local grades and local reserves for highly skewed variables due to three reasons: it uses only part of the available data information, it has no physical princi

    Sep 26, 2011

  • AUSIMM
    Deposit Morphology and Current Efficiency in Electrolytic Zinc Deposition

    By Pollard D, Meadows N

    The presence of impurities which are electropositive to zinc in acid zinc electro- lyte causes changes to deposit morphology and reduced current efficiency. Glue may be added to control some impuri

    Jan 1, 1984

  • AUSIMM
    Three Dimensional Graphics Modelling as Applied to Longhole Stoping Design

    By Woodlands W. K

    A 3D graphics modelling system has been applied to longhole stope ring design at Z.C. Mines, Broken Hill, NSW. This has been in operation for a four month period (January, 1988). The purpose of th

    Jan 1, 1988

  • AUSIMM
    Some Aspects of the Carbonaceous Fraction of Mount Isa Lead Concentrate

    By Harraway D. H, Draper N

    The association of graphite with a fine grained pyrite in the Mount Isa lead-zinc ore was investigated from mineralogical and metallurgical standpoints. The pyrite has been partially or completely rep

    Jan 1, 1961

  • AUSIMM
    Worthing Mine and its Historic Enginehouse

    By Connell JE

    The Worthing Mine near Hallett Cove. 20 km southwest of the cite of Adelaide, belongs to Aus- tralia's first mining era, which took place in South Australia between 1841 and 1851 (Figure 1). Op

    Jan 1, 1987

  • AUSIMM
    Hilton - The All Electric Mine

    By Todd W, Stone C

    A 3D graphics modelling system has been applied to longhole stope ring design at Z.C. Mines, Broken Hill, NSW. This has been in operation for a four month period (January, 1988). The purpose of th

    Jan 1, 1988

  • AUSIMM
    Assessing the volume change behaviour of red mud through laboratory and field testing

    By D J. Williams, A Shokouhi, A Naderian

    Extracting alumina from bauxite involves the production of fine-grained waste known as red mud. The highly alkaline red mud is usually neutralised by applying sea water, thickened to between 25% and 3

    Jul 23, 2018

  • AUSIMM
    Behaviour of iron ore granules – laboratory and commercial sinter plant granulation

    By O A. Aladejebi, S Mitra, T Singh, D J. Pinson, S, S J. Chew, T Honey

    Currently, many commercial sinter plants are exploring the potential addition of high-grade iron ore concentrates to improve the sinter grade. A better understanding of the ore blend, granule behaviou

    Sep 18, 2023

  • AUSIMM
    Biohydrometallurgy of Gold: Present-Day Status and Future Prospects

    By Groudeva VI

    The biohydrometallurgy of gold is based on different processes which could be grouped into four main groups (Attia, Litchfield and Vaaler, 1985; Karavaiko et al, 1988; Groudev, 1990): 1. bacterial o

    Jan 1, 1993

  • AUSIMM
    The Correlation Between Ascending Mining and Stability of the Overlying Strata

    In the process of mining the lower seam in a multi-seam operation, a lot of oblique fract- ures appeared in the upper seam which was in the equilibrium zone. These fractures closed soon after the l

    Jan 1, 1986

  • AUSIMM
    Maldon to Dombarton Rail Link – Design Development of the Avon Tunnel

    By A Bagis, T Baker

    In 1983 the New South Wales (NSW) Government began to construct a 35 km freight rail line to provide additional rail capacity to Port Kembla in the Illawarra region, south of Sydney, through a direct

    Sep 17, 2014

  • AUSIMM
    Blasting Near Mine Surface Infrastructure

    By A J. Moore

    Blasting operations in open cut mines results in airblast, ground vibration and rock movement with the potential for wild flyrock. In some mines there is a trend towards blasting closer to established

    Nov 8, 2011

  • AUSIMM
    Refurbishment of Brisbane's Rail Tunnels for Electrification

    By Fejes G

    An integral part of the Brisbane Suburban Railway Electrification involved the relining, refurbishment and track lowering in the Roma Street, Brunswick Street and Gloucester Street double track tu

    Jan 1, 1981