Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Overcoming the Challenges of Managing Tailings from Iron Ore Mining in Western AustraliaBy D R. Anstey
The growing demand for iron ore from Western Australia has led to an increased focus on the development of magnetite and lower grade iron ore deposits. The need to process and beneficiate the ore from
Jul 11, 2011
-
Sinking No. 3 Elliptical Shaft at North Broken Hill Limited Broken Hill, N.S.W.This paper describes the operation involved in the sinking of a concrete-lined elliptical-shaped shaft at North Broken Hill Limited.Major factors such as geological features, future ventilation, ore h
Jan 1, 1956
-
CIL Gold Leaching and Adsorption with a Deficiency in Free CyanideBy Derham DW, Newcombe LA
The operations of the Mount Morgan gold tailings retreatment plant were significantly improved in 1984 by the desliming of the CIP plant feed, which reduced cyanide consumption and increased percen
Jan 1, 1993
-
Signals of Mine Closure - A Strategic Approach for Retrenchment - A Case Study of Porgera Gold Mine, Papua New GuineaThe issue of retrenchment is a topic of considerable relevance for the Papua New Guinea (PNG) mining, petroleum and gas industries. The unique environments in which Porgera Joint Venture (PJV) and oth
Jan 1, 2009
-
Influence of iron ore chemistry and mineralogy on sticking and breakage of pellets inside shaft furnaceBy M I. Pownceby, A Guiraud, S Purohit
Sticking and breakage of iron ore pellets during high temperature reduction can result in several operational challenges during shaft furnace ironmaking. With the shift to H2-based DRI processes and d
Sep 18, 2023
-
The Geometry of the Heavy Sulfide Zone - A Challenge for Mine Planning and Geotech at GrasbergBy S C. Sc, J Young, N Belluz, D Nicholas
The heavy sulfide zone (HSZ) of the Grasberg deposit has the geometry of a funnel and is located at the contact of the mineralised intrusive and the relatively barren sedimentary rock types. The geome
Jan 1, 2007
-
Intensity quantification of coal and rock burst risk – a reviewBy C Zhang, I Canbulat, G Fan, D Zhang, C Wang
A clear understanding of the intensity of coal and rock burst is the basis for future research on burst mechanism and control. There has been a wide variety in the description of coal and rock burst d
Nov 30, 2018
-
Microalgae in mining – environmental and social opportunitiesBy A E. Levett, J Durbin
The environmental, social and governance (ESG) obligations of mining companies promote the consideration of water and land resources as well as the post-mining employment opportunities following the c
Aug 2, 2023
-
Mineral chemistry of iron oxides in the Leveaniemi iron ore deposit in Northern SwedenBy A Larsson, K Niiranen
The Palaeoproterozoic Leveäniemi iron oxide apatite (IOA) deposit of the so-called Kiruna type is currently mined by Luossavaara-Kiirunavaara AB (publ.), commonly known as LKAB. The mineralogy of iron
Nov 8, 2021
-
Wet High Intensity Magnetic Separators Circuit ModellingBy J D. Grobler
In the heavy minerals industry wet high intensity magnetic separators (WHIMS) are widely applied for primary magnetic separation of magnetic minerals and non-magnetic minerals. This piece of equipment
Oct 5, 2011
-
Mill Modelling Using an Extensible Station-Based FrameworkBy E A. Gunn, J Zhou
In this paper a project to develop a joint optimisation/simulation model for production planning in a mine-mill complex is presented. The system involves a mill receiving ore from a number of differen
Sep 26, 2011
-
Improvement of blast efficiency at Rio Tinto Borates and Lithium Mine in California, USABy J Furtney, W Fu, D Nutakor, A Brose
Rock blasting outcomes are often a shared responsibility of both the mine operations group and the mine geotechnical group. From an operational logistics and planning perspective, blasting concerns in
Jun 22, 2022
-
Magnesium Sulfate Production ù First Value Added Salt From Saline Waters of the Murray Basin (Australia)By T Barto, D Thomson, T Norgate, C Doblin
Collaboration between CSIRO Minerals and SunSalt Pty Ltd, a salt producing company located in rural Victoria, has resulted in a commercial process to recover magnesium sulfate (commonly called Epsom s
Jan 1, 2004
-
A tailored solution to determine plant capacity using strategic analysisBy J Nortier, J Dray
There is no single factor that determines the appropriate capacity for a mining project. It is driven by the size of the resource, the capacity of the market, the availability of capital, the availabi
Jun 22, 2022
-
Integrating Srata Control with Coal Winning SystemsUnder South Africanncoalmining conditions, in the majority of instances coal is won using the bord and pillar system without pillar extraction. Examples demonstrate that strata control policy has an
Jan 1, 1971
-
Breakthrough in elliptical motion screen trial delivers significant performance gainsBy D Teyhan, J Kirsch
Traditionally, most Australian iron ore mining operations have been surface-based. Processing plants were designed to handle dry ores. In recent years mining operations in the Pilbara have progressive
Nov 8, 2021
-
Integrating Sustainability Principles into Mineral Processing Plant DesignBy G Corder
Even though most major operating companies in the minerals industry have Board-level endorsed sustainability principles and objectives, design engineers typically have no mechanism that allows them to
Aug 8, 2011
-
Fosterville Gold Mine Heated Leach ProcessBy M Binks
The Fosterville Gold mine is located approximately 20km to the East of Bendigo in central Victoria. The gold at Fosterville occurs as solid solution within disseminated arsenopyrite and pyrite. The Fo
Aug 8, 2011
-
The Influence of Medium Rheology on the Separation of Minerals in Dense Medium Drums and CyclonesBy Baguley PJ, Napier-Munn TJ
This paper presents preliminary resu]ts from field studies which were conducted to establish, among other things. the influence of medium viscosity on the partitioning behaviour of dense medium cy
Jan 1, 1987
-
Case Studies of International Copper Development ProjectsBy Pollack B
Four different major international copper projects are discussed. Three have recently come on line, and one is now being constructed. Each of the projects has encountered unique problems during th
Jan 1, 1983