Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
A Review ù Pillar Stability Issues at DOZ Block Cave MineBy D Flint, O Rindriatmoko
PT FreeportÆs Deep Ore Zone (DOZ) Mine is the latest block cave mine within the East Ertsberg Skarn System (EESS).Issues with undercutting and stress concentrations at the extraction level were experi
Jan 1, 2005
-
Experience with Capping of Tailings Storage Facilities for Decommissioning Projects in AustraliaBy W Ludlow, C Harrington
This paper presents an overview of the design and construction challenges to implement capping systems on Tailings Storage Facility’s (TSF) based on recent projects in Australia. Key aspects discussed
Jul 23, 2018
-
Saving Money on SafetyA major problem with many items of underground equipment is that they have either been converted or adapted from surface equipment, or that they have been designed and assembled in comfortable offices
Jan 1, 1992
-
Predicting Iron Ore Fines Shipment MoistureBy J E. Everett, D Linden, P Maney
In response to the implementation of a new schedule for iron ore fines in the International Maritime OrganizationÆs (IMO) International Maritime Solid Bulk Cargoes (IMSBC) Code, improved measures for
Aug 12, 2013
-
Some Design and Operating Aspects of the Ranger Uranium Mine Treatment PlantEnvironmental considerations were key factors in the design of the Ranger Uranium Mines treatment plant. The mine is located adjacent to the Kakadu National Park and has an average rainfall of 1.6
Jan 1, 1984
-
Prevention of Scaling and Corrosion of Titanium Alloy Heat Exchanger Tubes at the Risdon Electrolytic Zinc RefineryScale build-up in titanium palladium alloy spent electrolyte heat exchangers in the residue treatment plant commissioned at Risdon, Tasmania in 1971 was shown to be a mixture of manganese dioxide and
Jan 1, 2005
-
Grade/Tonnage Curves and Optimization of a Mining ProjectSince its beginning, with the works of D. Krige and later, G. Matheron, geostatistics has been analyzing in detail the essential factors at play in ore reserves estimation problems, with the ever-p
Jan 1, 1987
-
Cost Effective Concentrator DesignBy G Lane
This paper discusses the factors that contribute to the cost effective design of a concentrator. Concentrator design and layout outcomes are functions of the team (engineer’s and owner’s) participati
Aug 8, 2011
-
Metallurgical Management Tools for Continuous ImprovementBy R Dunne, W McCallum
Continuous improvement might be defined as seeking incremental improvement over time through improved equipment, processes, technology and the efforts of people. Most people working in ore processing
Oct 29, 2012
-
An Iterative Geographic Information System Based Approach for the Assessment of Tunnelling Impact to Existing Buildings and StructuresBy L Cain, C Every, S Mirlatifi, J Ashley
This paper presents a geographic information system (GIS) based method for the prediction of ground movement and the associated impact on existing buildings and structures due to tunnelling in the Nor
Sep 17, 2014
-
A quantitative risk assessment tool for geothermal outbursts at Lihir Gold MineBy M Zoorabadi, Y Zhang, D Bringemeier, S Nicoll, N Kerr
Lihir operations of Newcrest Mining Limited (NML) are on Lihir Island (PNG) which is located approximately 900 km north-north-east of the national capital Port Moresby. The mine is located within the
Nov 29, 2022
-
Utilising Orebody Knowledge to Improve Comminution Circuit Design and Energy UtilisationBy M S. Powell
In this paper it is argued that we are entering a new mining era, based on considerably more challenging orebodies as we rapidly expand minerals production by exploiting previously uneconomic deposits
Sep 29, 2013
-
Age-dependent Changes in Post-cracking Performance of Fibre-reinforced Concrete for Tunnel?SegmentsBy E S. Bernard
Toughness testing of fibre reinforced concrete (FRC) at 28 days age is typically undertaken as part of quality control for the many applications where fibres are used in concrete, including shotcrete,
Sep 17, 2014
-
Reconciliation Principles for the Mining IndustryReconciliation involves the collection of tonnage, grade (quality) and contained metal (product) data from disparate and hopefully independent sources. Examples are exploration data, production sampli
Sep 26, 2011
-
Mass Blasting at Elura MineBy G Kennewell
At 11 am Monday 8 September 1997, the successful detonation of the 5/9 Mass Blast at Pasminco - Elura was signified by the subsiding of æMt KevinÆ (a 15 m high earth fill mound). The blast was in resp
Jan 1, 1999
-
On equitable distribution of mining wealth and the social licence to operate imperative – an African case studyBy S Roberston, G Batt, R Shanahan, B Shah, A Trench, H Bromfield
The geographic imperative of ore systems leaves mining, more so than virtually any other aspect of modern industry, heavily dependent on obtaining and maintaining social licence to operate. A prospect
Nov 21, 2018
-
Differential Flotation of Copper, Lead, Zinc and Iron Sulphide Minerals at Lake George Mines Pty. Ltd., Captain's Flat, New South WalesBy Nixon J. C, Reynolds C
Three principal features of the ore at Captain's Flat, New South Wales, tend to complicate concentration of the valuable minerals, these being:1. The ore occurs in three more or less separate bod
Jan 1, 1952
-
The Composition of Some Lead Blast Furnace Slags from Port PirieINDEX OF CONTENTSIntroductionThe slag samplesGranulated SlagGlass-spinel-magnetite-metallic leadRapidly Chilled SlagSlowly Cooled SlagSpinel - magnetite - zinc melitite (hardystonite) willemite - oliv
Jan 1, 1949
-
Atlas Copco Drill Rig Products for Mine Automation and Communication ù A Totally New Technology Platform for Advanced Mining SystemsIn mid-1998 Atlas Copco Rock Drills AB introduced the first member of a new family of drill rigs. This new family, Rocket Boomer L1C/L2C/L3C, is based on modern computer technology and also on what is
Jan 1, 2003
-
Underground Quarrying - A Challenge for the Next MillenniumBy M A. Ohsberg, A C. Robertson
Quarrying in Australia accounts for a total annual production of around 200 Mt/a of sand, aggregate and materials used in construction. This material has an annual value of the order of $2 billion and
Jan 1, 1999