Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Application of Borehole Imagery in Iron Ore - Examples from the Hamersley Group, Western Australia

    The borehole televiewer is a downhole geophysical logging device that produces continuous, oriented, 360¦ images of the drill hole wall. Two types of borehole images are currently being generated at t

    Jan 1, 2007

  • AUSIMM
    Characterisation of Long-Term Scaling Effects of Ceramic Filter Media Used in the Dewatering of Iron Ore

    By R Salmimies

    Choosing a ceramic capillary action filter is often favoured in processes where low energy consumption is important, such as the dewatering of iron ore. In addition, the performance of the filter medi

    Jul 11, 2011

  • AUSIMM
    Deformation Mechanisms of the South West Rail Link Underpass beneath the Hume Highway

    By S J. Clarke, C S. Walker

    The South West Rail Link (SWRL) project involved construction of a rail line to service new residential areas in south-west Sydney. The 11 km rail line is conveyed through a short tunnel at shallow de

    Sep 17, 2014

  • AUSIMM
    "Geometallurgy – Driving Innovation in the Mining Value Chain"

    "Geometallurgy is a discipline that seeks to improve the sustainability of the extraction of metals and minerals by promoting the smarter use of non-renewable resources, better energy efficiency and g

    Jun 15, 2016

  • AUSIMM
    Aligning Resource Estimates with Mine Planning

    By D Kentwell

    A resource model serves two main purposes depending on the stage of a project. The first is to provide an early indication of likely tonnages and grades at certain cut-offs so that decisions can be ma

    Nov 24, 2014

  • AUSIMM
    Decarburisation of Steel by Directly Reduced Ore Under Controlled Atmospheres

    An examination has been made of the rate and extent of removal of carbon from scrap metal charges when the melt is exposed to atmospheres which are reducing or oxidising with respect to FeO at uni

    Jan 1, 1984

  • AUSIMM
    Supergene sulphide ore from the Mutooroo mine, South Australia: characterization and dissolution of copper

    By Davey P. T, Tsambourakis G

    Mineralogical analysis of supergene sulphide ore recovered from areas close to the underground workings at the abandoned Mutooroo (South Australia) mine shows that the original sulphide minerals have

    Jan 1, 1986

  • AUSIMM
    KEYNOTE: Back to the Future – Still on the Dark Side

    By P D. Munro

    "This is a reprise of the paper ‘Back to the Future – Why Change Doesn’t Necessarily Mean Progress’ presented to the Tenth Mill Operators’ Conference in 2009. It was observed that the ‘boom and

    Oct 10, 2016

  • AUSIMM
    Managing high volume water inflows of 300 L/s in the planning and development of a large scale underground Gold Mine – the Didipio story

    By J P. Evert

    Didipio gold-copper mine operation is situated in the island of Luzon, approximately 270 km north of Manila in the Philippines, in an area of high seasonal rainfall. The hydrogeological water flow mod

    Mar 29, 2023

  • AUSIMM
    The coalmine roof rating – an update in its calculation and mechanistically why it works

    By M Colwell

    The Coal Mine Roof Rating (CMRR) is a rock (roof) mass classification (RMC) system/index that was originally developed by the United States Bureau of Mines (USBM) for aspects of underground coalmine g

    Nov 29, 2022

  • AUSIMM
    The Consequences for Pillar Stability of Zero Confining Stress Brought about by Forced or Natural Drainage

    By I Gray

    This paper examines the effects of the changes in stress that a coal may undergo as part of the drainage process. As a consequence of this, some coal seams will come to the situation that they have ze

    Nov 5, 2014

  • AUSIMM
    Simulation of Flotation Feed Pre-Classification

    By J Arola, B Kettunen, W M. Bond

    Separation of fine and coarse particles as separate streams prior to flotation, and their differential treatments, could substantially increase recovery and reduce collector consumption. A series of s

    Jan 1, 2005

  • AUSIMM
    Vaporization During the Combustion of a Complex Copper Concentrate

    A laminar-flow furnace technique was used to study the combustion of 37-53 µm size fraction of Woodlawn copper concentrate containing 7.4 per cent zinc, 5.0 per cent lead and 22.5 per cent copper

    Jan 1, 1985

  • AUSIMM
    Benchmarking and cross validation of the multivariate conditional simulation model of the Olympic Dam deposit

    By D Clarke, I Minniakhmetov

    The Olympic Dam deposit is truly a world-class IOCG-Ag deposit, the world’s fourth largest deposit of copper and the world’s largest known single uranium deposit. Traditional and non-traditional metho

    May 24, 2023

  • AUSIMM
    The Geomet Curve – A Model for Implementation of Geometallurgy

    By J Vann

    Geometallurgy is inherently multidisciplinary and it gains its power to deliver improved outcomes for the minerals industry by bridging silos between disciplines. This cross-disciplinary approach unlo

    Sep 5, 2011

  • AUSIMM
    Education for the Mineral Industry: Entry Standards and Entry Requirements for Tertiary Courses

    By Potter OE

    There appears to have been a swing away from the study of mathematics, the physical sciences, foreign languages and the classical humanities subjects by many students in high schools in Victoria. T

    Jan 1, 1981

  • AUSIMM
    Climate Change - Relative Solar and Anthropogenic Forcings

    The first thing to be aware of is that the warming effect of carbon dioxide is strongly logarithmic. Of the 3¦ that carbon dioxide contributes to the greenhouse effect, the first 20 ppm has a greater

    Jan 1, 2009

  • AUSIMM
    Geotechnical Models and Data Confidence in Mining Geotechnical Design

    By M J. Dunn

    The geotechnical model is the cornerstone of any mining geotechnical design and as such the confidence level and reliability of the geotechnical model is paramount. The geotechnical model confidence l

    Nov 5, 2014

  • AUSIMM
    Negatively Geared Ore Reserves – A Major Peril of the Break-even Cut-off Grade

    "Recognising that the mining industry is wedded to the break-even cut-off grade rather than a cut-off grade that optimises value, the author examines some perils and pitfalls in the use of break-even

    Mar 8, 2016

  • AUSIMM
    Slag-metal interfacial reactions in pyrometallurgical processing of industrial wastes for recovery of valuable metals

    By J H. Park, R R. Kim, H S. Park, H J. Kim

    This study focuses on the recovery of valuable metals, specifically silver (Ag) and palladium (Pd), from copper-containing sludge (with copper content less than 20 per cent) generated during PCB proce

    Jun 19, 2024