Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Experience at Goonyella/Riverside Mine with a Bucket Wheel Excavator System and Shovel/Truck Systems for Prestripping Overburden

    A conventional Bucket Wheel Excavator (BWE) system with conveyor transport, mobile tripper and spreader was commissioned at the Goonyella Mine in 1982. The system was introduced to prestrip ahead of d

    Jan 1, 1992

  • AUSIMM
    Blast Furnace Raceways - A Review

    Previous studies on the blast furnace raceway zone have been undertaken at three levels of scale, namely: laboratory models at low temperature, hot models which simulate coke combustion in the zone

    Jan 1, 1981

  • AUSIMM
    Properties of Surface Films on Chalcopyrite and Pyrite and their Influence in Flotation

    By Chander S

    Properties of surface films on chalcopyrite and pyrite differ due to variations in the mechanism of oxidation of the two minerals. In the case of chalcopyrite the first step in the oxidation is the

    Jan 1, 1993

  • AUSIMM
    Unfolding the Luce Deposit to Improve Variograms

    By H. J. Glass, A J. Cornah

    Improving the quality of the variogram helps to improve subsequent estimation and simulation processes. Two strategies for conditioning data prior to construction of the variogram are investigated usi

    Jan 1, 2006

  • AUSIMM
    Modelling Heap Leach Operations with Metsim

    Metsim is proving to be a powerful tool when designing a heap leach operation. The most useful outputs arc determining the fluctuations in pregnant solution recovery rate, make-up water rate, gold r

    Jan 1, 1994

  • AUSIMM
    Warkworth Mining Ltd Operations

    Warkworth Mining has been successfully operating a large open cut coal mining operation in the Hunter Valley of NSW since 1981.The mine is a complexmulti seam operation and utalises both truck and sho

    Jan 1, 1992

  • AUSIMM
    New Perspectives on Quantitative Textural Analysis

    By R Castroviejo, E Pirard, L PTrez-Barnuevo

    Process mineralogy provides the mineralogical information required by geometallurgists to address the inherent variation of geological data. The successful beneficiation of ores mostly depends on the

    Sep 29, 2013

  • AUSIMM
    High Speed, Water Filtration ù The Potential for Novel Polypropylene Fibred, Fabric Media Filters

    The unique chemical and physical properties that can be displayed by polypropylene and its copolymer derivatives are enabling its development as a truly versatile material for water filtration. Well k

    Jan 1, 2004

  • AUSIMM
    Geostatistical Applications in the Athabasca Tar Sands

    By Royle A. G

    The paper describes a geostatistical structural analysis of an 80 square mile lease of the Athabasca tar sands. Each step of the analysis is presented with the ultimate objective of condensing the

    Jan 1, 1977

  • AUSIMM
    Development of Intensive Dore Silver Cupellation at Pasminco Metals - BHAS

    By Thompson D, Burgess G. C

    Subsequent to large scale trials in 1987, the installation of a submerged lance Sirosmelt furnace system was approved in late-1988 for the cupellation of retort bullion to dore silver. Commissioning

    Jan 1, 1992

  • AUSIMM
    Database of TBM Projects Undertaken Between 1950 and 1990 and an Assessment of Associated Ground Strength Limitations

    A review of all major TBM projects from 1974 to 1990 has been undertaken and the results entered into a database. A similar database was prepared from information obtained from a principal TBM manufac

    Jan 1, 1993

  • AUSIMM
    An Intelligent Electronic Convergence Monitoring System for Underground Coal Mines

    By Hutchinson IN

    In order for the Australian underground coal mining industry to achieve the high productivity rates demanded of it without compromising its good safety record, improved geotechnical monitoring systems

    Jan 1, 1991

  • AUSIMM
    In-Situ Leaching of Oxide Gold Deposits

    In-situ leaching of gold deposits has not become an option largely as a result the lack of suitability of cyanide as a lixiviant due to sluggish kinetics and high dependence on the availability of o

    Jan 1, 1991

  • AUSIMM
    Application of Pile Theory to Ground Support Design

    By Best R, Poulos H

    This paper discusses the results of an Australian Coal Association Research Program project into the development of a routine analytical design method for roof support in underground mines. Simple d

    Jan 1, 1995

  • AUSIMM
    Why do Shareholders and Mining Executives Allow Mine Managers to Leave Behind High-Grade Broken Ore Underground?

    By K Biegaj

    The paper describes challenges the author has encountered on Australian underground gold and nickel mines over the last eight years, when recovering high-grade gold/nickel bearing mine floor material

    Mar 26, 2012

  • AUSIMM
    A Possible Alternative to Hardwood Chock Pieces.

    By Thompson D, Somerville JM, Brock DA

    The development of a softwood alternative to the hardwood chockpiece used to build the waste-edge breakers commonly incorporated in gateroad packs is described. The results of laboratory tests on so

    Jan 1, 1992

  • AUSIMM
    Use of Simulation to Support Mining Industry Operators

    By Harper B

    The mining industry has developed a comprehensive view of the need to have production personnel well trained in the use and maintenance of mining equipment. A strong commitment from the industry to th

    Jan 1, 1998

  • AUSIMM
    The Development and Integration of a Carbon-In-Pulp Gold Circuit within the Kambalda Nickel Concentrator

    The reasons for and the methods of inte- gration of the gold treatment plant with the existing nickel concentrator are discussed. The integration was accomplished in three stages commencing in May 1

    Jan 1, 1984

  • AUSIMM
    Considering the effects of milling media and water chemistry in the flotation of selected base metal sulfides

    By S N. Nyoni, K C. Corin, C T. O’Connor

    Considering future water scenarios, as influenced by the increasing scarcity of water and the move towards sustainable process engineering etc, the closed water circuit becomes an important point of s

    Aug 24, 2022

  • AUSIMM
    The Planning and Methods Used at Selby in the Design of High Productivity Systems

    British Coal's Selby Complex is the newest producing mine in the United Kingdom. The reasons behind its origins, planning and design are explained. Some detail is given of equipment used, with th

    Jan 1, 1991