Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Determination of Silver in Lead Sulphide Concentrate by Atomic Absorption Spectroscopy (5be5cf21-9cd4-4cff-b4fd-1553b31a5e99)

    By Greaves M. C, Amos M. D

    A study was made of the instrumentation and technique of atomic absorption spectroscopy developed by Walsh of the Commonwealth Scientific and Industrial Research Organisation (CSIRO), Australia.The me

    Jan 1, 1994

  • AUSIMM
    The Analysis of Petroleum Development Projects

    Two main aspects need to be considered when analysing a potential petroleum development project. Firstly, an estimate of the recoverable reserves must be made, and in many instances, these reser

    Jan 1, 1983

  • AUSIMM
    What Drilling Density is Optimal? ù A Case Study From the Golden Pig Mine

    By D Whitworth

    The Golden Pig mine has embarked on a diamond drill program design philosophy that increases flexibility of the program by greatly increased drill pattern densities. The use of standard broad pattern

    Jan 1, 2002

  • AUSIMM
    In-Situ Experiment and Dynamic Responses of a Tunnel Subjected to Train Loading

    By Weining L

    In-situ experiments were performed in a tunnel built in loess soil with the displace- ment components of the tunnel lining and the acceleration components of the tracks measured during the passing o

    Jan 1, 1987

  • AUSIMM
    Geology and Ore Reserve Evaluation at Renco Mine, Zimbabwe

    Gold at Renco occurs in association with pyrite, pyrrhotite, chalcopyrite and quartz and is confined to a series of brittle fractures and fault breccias (reefs) preferentially developed within an anas

    Jan 1, 1990

  • AUSIMM
    The Integrated Planning of Geotechnical Investigations for New Mining Projects

    By Rosengren KJ

    Geotechnical conditions often have a critical influence on the design of new open pit and underground mines, but they are often considered of secondary importance in relation to other factors, suc

    Jan 1, 1986

  • AUSIMM
    Mauritanian Investment Opportunities

    By Mackenzie W. R, Harding C. G

    The Islamic Republic of Mauritania is a large country of over 1 000 000 square kilometres situated on the Atlantic coast of north-west Africa. It is bounded to the north by Western Sahara and Alger

    Jan 1, 1996

  • AUSIMM
    New Limestone Grinding Plant at Risdon, Tasmania

    A new plant for grinding limestone was built at the Risdon Works of the Electrolytic Zinc Company of Australasia Limited to meet increasing process demands expected to reach 150 tonne/day of ground

    Jan 1, 1977

  • AUSIMM
    Application of Engineering Discipline and a Full-process Optimisation Focus – Productivity to Profitability without Profuse Pruning

    By W R. Adamson

    "Optimisation of drill and blast design and engineering can deliver a significant positive impact on the profitability of any mining operation; however, true engineering of the blasting process is les

    Aug 24, 2015

  • AUSIMM
    Responding to the Challenge - Necessity Driving Circuit Change

    By R Barrette, V Lawson

    Over the last year at Clarabelle Mill, three circuit reconfigurations were implemented. One circuit reconfiguration, æA CleaningÆ, was initiated due to a furnace failure at the smelter complex, and tw

    Oct 29, 2012

  • AUSIMM
    The Design and Commissioning of the Argyle Diamong Mines Heavy Medium Separation Plant

    The Argyle Diamond Mine came on stream late in 1985 as the world's largest diamond producer in terms of carat output. The design of the process plant, including the heavy medium separation (HM

    Jan 1, 1987

  • AUSIMM
    Development of Grade Control Systems at the Mt Muro Au-Ag Project, Central Kalimantan, Indonesia

    The Mt Muro gold and silver deposit in Central Kalimantan has been in production since December 1994. The geology is characterised by narrow high-grade lodes containing gold and significant amounts of

    Jan 1, 1997

  • AUSIMM
    Development of Boomtype Tunnelling Machine for Hard Rock

    By Itoh K, Sakai K, Tsuji K

    In Japan there exists a strong demand for mechanical excavation for tunnelling bacause the blasting method which produces much vibra- tions and noises is restricted in its applica- tion due to the f

    Jan 1, 1987

  • AUSIMM
    Settling Velocities of Particles in a Hindered Settling Device

    Hindered settling devices (teeter bed, up-current) are widely used in the mining industry to classify mineral streams into various size fractions and to separate minerals. In the coal industry these d

    Jan 1, 2008

  • AUSIMM
    Reflectance Spectroscopy Monitoring of the Petroglyphs of the Burrup Peninsula, Western Australia

    By S Furman, M Caccetta, A Hacket, B McDonald, M A. Wells, D Lau

    In 2004, the Western Australian Department of Industry and ResourcesÆ Burrup Rock Art Management Committee commissioned a number of independent scientific studies to evaluate the condition of rock art

    Jan 1, 2008

  • AUSIMM
    æGreenÆ Treatment of Acid Mine Drainage ù A Step Towards Sustainability

    By K Baskaran, T McKenzie

    Sustainability is becoming increasingly important in the mining and mineral processing industries and must incorporate the associated waste products. Acid mine drainage (AMD) is one such by-product an

    Jan 1, 2002

  • AUSIMM
    Ore Quality Control for Process Optimisation

    By Sehic O. A

    Geology can be the root of evil or a source of bliss; there is a choice; to ignore geology is at a mine's peril.Risk can be minimised and profitability maximised by the application of a detailed

    Jan 1, 1993

  • AUSIMM
    Improvement of Coal Tailings Disposal Via Understanding of Clay Chemistry

    By Bogar D. V

    Often dewatering of coal tailings is inhibited by the presence of clays, making it difficult to obtain a high concentration, handleable coal tailings. The net result can be a low concentration, choc

    Jan 1, 1995

  • AUSIMM
    Chemical Optimisation of Smelting Processes

    By Floyd JM

    Conventional smelting reactor systems were designed to recover only one main element from their feedstocks. They did not possess sufficient flexibility to allow optimisation of co-production of multip

    Jan 1, 1985

  • AUSIMM
    Prediction and Measurement of Size Distributions from Coal Mine to Coke Oven

    By Callcott R

    Prediction of raw coal size distributions and those generated by processing are examined using spreadsheets and the matrix analysis of breakage processes. Run of mine coal size distributions are pre

    Jan 1, 1998