Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Probabilistic practical optimization of production scheduling for multi-element deposits

    Optimizing production scheduling in open pit mines is important for managing cash flows of mining operations. This paper describes a new, probabilistic, mixed integer programming (MIP) formulation whi

    Jan 1, 2006

  • CIM
    Model-based control of column flotation: Toward industrial application and real-time optimization

    By André Desbiens, Jocelyn Bouchard, René del Villar

    "The metallurgical performance of the column flotation process is determined by the concentrate grade and recovery. Although the former can be continuously measured using an on-stream analyzer, the la

    Jan 1, 2003

  • CIM
    Arctic Resource Development Challenges for Environmental Approvals

    By Nick Poushinsky

    OVERVIEW OF PRESENTATION ?Stantec?s Northern Presence ?Challenges for Northern Development ?Environmental Approval Challenges ?History/Expectations ?Baseline Data ?Consultation ?Regulatory Pr

    May 1, 2009

  • CIM
    Measurement of Ball Size Distribution in a 8 m x 5 m Primary Mill of Sarcheshmeh Copper Mine

    By M. Pourkani, M. Karga, Samid Banis, Andre Laplante, G. Langari-Zadeh

    "The Sarcheshmeh mine processes 40,000 t/d of ore grading 0.9% Cu and 0.035% Mo. Grinding is effected in single stage ball mills using 80 mm forged steel balls, with an average consumption of 850 g/t.

    Jan 1, 1999

  • CIM
    Agglomeration of Sulphide Minerals

    By J. A. Finch, J. Vergouw

    "Flotation selectivity becomes progressively more difficult to achieve with decreasing particle size. One of the possible problems is agglomeration, i.e. particles clustering together. One mechanism d

    Jan 1, 1997

  • CIM
    Mineralogical and Metallurgical Results at Peñoles´ Mining Operations - Mexico

    By Luis Magallanes-Hernández

    "Industrias Peñoles, S.A. de C.V. (Peñoles) in Mexico, is a major silver producer. The Peñoles Mining Division has eight Mining Operations and in seven of them, flotation is used to concentrate the me

    Jan 1, 2005

  • CIM
    Thermo Adhesive Separation of Different Plastics from WEEE Streams

    By Imre Gombköto, Barnabás Csoke

    "Raw material management means not only mining and processing of primary raw materials like ores, but means also collecting and processing secondary sources of raw materials. Recycling is one of the m

    Jan 1, 2016

  • CIM
    Underground Milling of Uranium Ores

    By Chuck Edwards

    "Cameco operates the high-grade McArthur River uranium mine in northern Saskatchewan, and is constructing the high-grade Cigar Lake uranium mine. Cameco has studied the concept of underground milling

    Jan 1, 2007

  • CIM
    Observations on the Impact of Furnace Dimensions and Power Density on Taphole Integrity

    By R. J. Hundermark, K. van der Merwe, L. R. Nelson

    Taphole integrity is critical to all furnaces, but it is especially important in high intensity electric furnaces processing matte and metal of high superheat. Key furnace dimensions are the electrod

    Jan 1, 2015

  • CIM
    Economic Recovery of Uranium from Low-Grade Pulps via Resin-In-Pulp

    By D. Auerswald, M. Kotze, V. Yahorava, T. Udayar

    Uranium can be recovered from lower grade uranium ores (<800 mg/kg U3O8), leach residues, and waste dumps cost-effectively via resin-in-pulp (RIP). Using this technology, no solid/liquid separation or

    Jan 1, 2014

  • CIM
    Comparison of oxidants for the leaching of uranium ores in sulphuric acid

    By G. M. Ritcey, K. E. Haque

    "Laboratory-scale sulphuric acid leach tests were conducted on Elliot Lake and Rabbit Lake ores in the presence of various oxidants, namely: Fe2(SO4)3, CI2, H2O2, NaClO3, MnO2, H2SO5, HNO3, Oxon e, K2

    Jan 1, 1982

  • CIM
    Design and Construction of Hydrostatic Mine Shaft Liners Using Cast Iron Tubbing Technology

    By J. Ouellet

    The design of hydrostatic liner for a deep potash mine shaft in Saskatchewan poses tremendous technological challenges. Technology has evolved to a point where one could consider a new innovative appr

    Aug 1, 2013

  • CIM
    Modeling and Simulation of SkimAir® Flash Flotation as a Part of Grinding-Flotation Circuit – Case Study in Esperanza, Chile

    By Luis Bernal, Pertti Lamberg

    "SkimAir®, Outotec’s Flash Flotation unit, is placed in the grinding circuit to float the valuable liberated mineral particles from the circulating load of the grinding process while still relatively

    Jan 1, 2009

  • CIM
    General Features of the Conformable "Pyritic" Orebodies (e2db2852-46b4-4a58-9d27-27cfaf6b1f8f)

    By R. L. Stanton

    "The present contribution is complementary with a preceding one on the field association of the conform-able ""pyritic"" deposits. It considers the more important features of their mineralogical const

    Jan 1, 1960

  • CIM
    Changes in the Converter Slag Chemistry Due to the Southern Peru Ilo Smelter Modernization

    By J. Suarez Condezo, E. Herrera Alarcon

    The Ilo Smelter Modernization Project will require treating the slag from the Peirce Smith converters in Slag Cleaning Furnaces using pig iron technology. Currently the slags from the converters show

    Jan 1, 2007

  • CIM
    The Behaviour of Iron in the High Pressure Acid Leach Process

    By Takao Oishi, Go Ohara, Toru Kitazaki, Masahiro Tanaka

    "The High Pressure Acid Leach (HPAL) plant for nickel-cobalt mixed sulphide production at Coral Bay Nickel Corporation (CBNC) in the Philippines has been in operation since 2005 with a capacity of 10,

    Jan 1, 2016

  • CIM
    An In-Plant Test of Sphalerite Flotation without Copper Activation

    By Q. Zhang, J. A. Finch

    "Sphalerite flotation in the absence of copper activation at moderately alkaline pH has been observed in laboratory studies. An in-plant test of this observation was conducted at Kidd Creek Mine LTD.

    Jan 1, 1992

  • CIM
    BLASTCAD ? Noranda's three-dimensional computer-aided underground blast design system

    By P. Favreau

    This paper describes the progress accomplished at the Noranda Technology Centre in the field of three-dimensional computer-aided underground blast design. Traditional methods of laying out underground

    Feb 1, 1993

  • CIM
    Constructed Wetlands that Emphasize Sulfate Reduction: A Staged Design Process and Operation In Cold Climates

    By T. R. Wildeman

    "At the Big Five wetland, which was built to treat drainage from a metal mine, encouraging results have attributed to sulfate reduction. Cu and Zn were reduced to below detection limits of 0.50 mg/L,

    Jan 1, 1992

  • CIM
    Hands-On Teaching of Applied Rock Mechanics

    By D. Beneteau, D. Milne

    "Advances in technology provide educators with valuable tools to enhance their teaching and efficiently deliver content to larger audiences. University educators are often encouraged to become more “r

    Jan 1, 2016