Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Integrated seismic reflection and borehole geophysical studies at Les Mines Selbaie, Quebec

    By E. Adam, B. Milkereit, M. Salisbury, L. E. Reed, G. Perron

    Integrating seismic reflection, borehole geophysical, and physical rock property studies is an effective means of mapping lithological contacts and structures in the crystalline crust. At Les Mines Se

    Jan 1, 1997

  • CIM
    Mineral Possibilities of Areas Adjacent to the Alaska Highway (ff91bb7d-99bb-4806-86e2-a2d9cfd3ea8e)

    By Thomas. L. O.

    Apart from a few sketches and incomplete maps, mainly topographical, and one or two detailed maps of placer-creeks, there is little information on the topography and geology of most of the country adj

    Jan 1, 1944

  • CIM
    Experiences with Real Time Equipment Monitoring ? Using Advanced Analytics to Equipment Life and Reduce Costs

    Mining Equipment Challenges Equipment Availability Unplanned downtime Maintenance Costs Secondary damage and catastrophic failures (T282 $750k) Emergency work is 4x the cost of planned work Ins

    May 1, 2013

  • CIM
    Potential problem analyses: A practical risk assessment technique for the mining industry

    By M. P. Davies

    "Risk, the product of probability and consequence, is an integral part of mining. Whether evaluating exploration priorities, determining property acquisition potential, reviewing the components of an

    Jan 1, 1997

  • CIM
    Constancia Project Process Plant Design and Start Up

    By David Stephenson, Hugo Granados, Steven Klohn

    "HudBay’s Constancia project is a copper molybdenum concentrator located in southern Peru. In 2010 Ausenco was contracted to perform a feasibility study optimization review which resulted in an improv

    Jan 1, 2016

  • CIM
    Conventional or High Capacity Thickeners, a Better Choice to Make

    By J. P. Grau, J. Z. Lu

    "Thickeners/clarifiers are widely used in coal preparation plants, potash processing and other mineral processing facilities. Thickeners play a very important role in slurry treatment systems to accom

    Jan 1, 2012

  • CIM
    The Ecstall Story: The Railroad and Traffic Department

    By David G. Baskin

    "THIS DEPARTMENT is unique in that it operates in the production stream and also provides an essential service. Its operating function consists of scheduling an ore train to haul 10,000 tons per day o

    Jan 1, 1974

  • CIM
    Meeting Today’s Challenge in Nickel Production: Reducing Operating Costs at Nickel Sulphide and Laterite Plants

    By A. E. M. Warner, A. Vahed, P. J. Mackey

    "Since early 2015, the price of nickel has dropped from the region of US$6/pound to current levels of around US$4.60/pound (March 2017), reflecting several market factors, but principally due to lower

    Jan 1, 2017

  • CIM
    Grinding Calculations Related to the Application of Large Rod and Ball Mills

    By C. A. Rowland Jr

    "I. INTRODUCTIONFred C. Bond's ""Third Theory of Comminution"" (1) was published in 1952. The mathematical statement of the Third Theory is the well-known Bond Formula:where W - Kw H per short tonWl -

    Jan 1, 1972

  • CIM
    Global Efficiency Concept ? a DSM Tool used on Price - Efficiency Decisions

    By Constantin D. Pitis

    ?Demand-side measure" means a rate, measure, action or program undertaken to conserve energy or promote energy efficiency?? (BCUC, 1996) In actual economical environment, business sustainability requi

    May 1, 2010

  • CIM
    Capturing unrealized capacity

    By M. W. Lewis, B. Sambirsky, J. Werner

    A mine’s inherent capacity is dictated by factors such as equipment, design, people, processes, and environment. Actual production may approach, but never surpass, the inherent capacity limit. The inh

    Jan 1, 2004

  • CIM
    Distributed control at the Kidd Creek grinding plant. Part II: Implementation

    By A. Desbiens, A. Pomerleau

    During the summer of 1994, a new PID-based control strategy was installed on line B of the grinding circuit at the Kidd Creek Division of Falconbridge Ltd. Part I of this paper described the methodolo

    Jan 1, 1997

  • CIM
    Capturing unrealized capacity

    By M. W. Lewis

    A mine's inherent capacity is dictated by factors such as equipment, design, people, processes, and environment. Actual production may approach, but never surpass, the inherent capacity limit. Th

    Jan 1, 2004

  • CIM
    Some Comments on the Japanese Coal Industry

    By C L. Briend, O&apos

    This paper presents the main features of coal mining in Japan, as determined by the author while attending the International Coal Conference in October of 1963. The general economy of the country is c

    Jan 1, 1965

  • CIM
    Some Aspects of Industrial Safety in British Columbia

    By W. K. A. Congreve

    Introduction Less than a hundred years ago the engineer was able to do his job without concern for the science that underlay his practices or for the men who operated his machines. But toward the e

    Jan 1, 1948

  • CIM
    Mucking efficiency in open pit blasting

    By J. J. Montoro

    The influence of blasting on the excavators’ efficiency, defined as mucking rate (amount of rock mucked per unit time) and mean bucket load (amount of rock loaded in each bucket operation), is investi

    Jan 1, 2007

  • CIM
    Towards Formalizing Qualitative Operations Input Data into Mine Planning (2dcf5f47-b85e-490f-8b96-c37606eb1d7d)

    By T. G. Joseph

    Mines must manage variability from within their operations as well as those imposed upon them by external forces. This paper provides a framework to manage both internal and external variability throu

    Nov 1, 2011

  • CIM
    Financing industrial mineral deposits on the Vancouver Stock Exchange

    By James Mackie

    The Vancouver Stock Exchange (VSE) has been providing venture capital for start-up companies since 1907. Ninety years' experience in the junior mining industry has enabled the VSE to develop policies

    Jan 1, 2001

  • CIM
    The Ungraded-Fibre Mill

    By C. Gordon Saunders

    "The ungraded-fibre mill is located at the mine site and has a rated capacity of 6,600 tons of ore input and 1,200 tons of ung1•aded fib1 •e product per day. Power for operation is obtained from a die

    Jan 1, 1976

  • CIM
    Aluminum mine shaft conveyances at Inco Ltd. an overview of problems encountered and solutions

    By Richard Mcivor, Largo Albert

    "Inco Limited has operated aluminum mine shaft conveyances since 1968. Aluminum conveyances are used where the hoisting in system requires lightweight conveyances to maintain the hoist rope safety fac

    Jan 1, 1988