Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Construction Of Two Microtunnel Access Shafts Using The Cutter Soil Mix (CSM) Method In The San Joaquin Delta, CaliforniaBy Eric S. Lindquist
Two microtunnel access shafts were constructed using the Cutter Soil Mixing (CSM) method in the San Joaquin Delta region of California, east of San Francisco. Unlike conventional slurry walls and diap
Jan 1, 2010
-
Automation Of Pile Foundation Design Post-Processing To Produce Pile PlansBy Rajasekar Subbian, Jessica Oudhof
In the Netherlands pile foundation design is done using CPTs in accordance with EC7 national annexure. The capacity per tip level is calculated for every CPT followed by zonation to find the tip level
May 1, 2022
-
Analysis of Water Leakage in Downstream Dam Toe of Komani DamBy Arjan Jovani, Arjan Beqiraj, Përparim Alikaj, Altin Karriqi
"Koman dam is one of most important high dams in Drin River Cascade. Safety of these dam is very important not only in power production but also in social and environmental aspects connected with vita
Jan 1, 2016
-
Soil Mixing for the Rio Puerto Nuevo Project in San Juan, PR: A Case HistoryBy Filippo Maria Leoni, Wesley Schmutzler, Matteo Bertoni
"Deep Mixing Method (DMM) for the Rio Puerto Nuevo Project (Project) in San Juan was chosen by the Corps of Engineers to improve the soils adjacent to a 92 inch ID forced sewer main relocation and to
Jan 1, 2015
-
Engineering Successful Dewatering in Arid Urban Areas: Abu Dhabi Dewatering GuidelinesBy M. Melih Demirkan, Juan J. Gutierrez, Raghav Ramanathan
"As the capital of the United Arab Emirates (UAE), Abu Dhabi is one of the world’s fastest-developing cities. To sustain its significant growth rate, Abu Dhabi must surmount challenging engineering pr
Jan 1, 2017
-
Comparison of the Pre-Construction and Production QC Test Results for the Sela-22 Elliptical Jet Grouting Project (New Orleans, LA)By Filippo Maria Leoni, Alessandro Bertero, Gianluca Pianezze
"As part of the Southeast Louisiana (SELA) drainage program, designed by the U.S. Army Corps of Engineers (USACE) to reduce flood damages in the City of New Orleans and surrounding parishes through th
Jan 1, 2016
-
Outline and Execution Control System of Dry Jet Mixing (DJM) MethodBy Shigetoyo Yasui, Masahiro Saitou, Nobushige Yasuoka, Keisuke Tsujimoto
"The Dry Jet Mixing (DJM) Method was developed and has been put to practical use on the initiative of the Public Works Research Institute and Japan Construction Method and Machinery Research Institute
Jan 1, 2015
-
Soft Deep Mixing for the Mitigation of Seismic RiskBy A. Flora, E. Bilotta, F. Foria, V. Nappa
"All the typical applications of deep mixing rely on the good mechanical properties of the improved columns to strengthen or stiffen the ground for a number of geotechnical applications.This paper foc
Jan 1, 2015
-
Consideration on Liquefaction Resistance of Ground Improved by the Sand Compaction Pile MethodBy Kazunori Matsushita, Masaru Sakakibara, Kenji Harada, Naotoshi Shinkawa, Mitsuo Nozu
The Sand Compaction Pile (SCP) method has been widely used as a typical countermeasure against liquefaction in Japan, and its effectiveness has been confirmed in many case histories of damages caused
Jan 1, 2017
-
Determination Of Thermal Conductivity Of Coarse-Grained SoilsBy Madhu. P, Srinivas. K
Measurement of thermal properties like thermal conductivity, thermal resistivity, heat capacity and thermal diffusivity for materials, it plays a crucial role in a wide range of various civil and elec
Sep 1, 2022
-
Large Diameter Helical Piles for Refinery ExpansionBy Chris Normand, Paul Volpe, Eric Wey, Howard Perko, Burt Ogilvie, Patrick Murray
"A refinery expansion project for Marathon Petroleum Company in Southern Louisiana required existing medium to large pipe racks to be expanded for additional capacity. Foundation modifications were ne
Jan 1, 2017
-
Lessons Learned From Mitigating Early Project Delays To Deep Foundation WorkBy Jeffery L. Ottesen
Early construction delays can jeopardize timely completion of subsequent work. As an early construction activity, and due to many unforeseen issues, deep foundation work inherently bears great potenti
Jan 1, 2002
-
Selecting the Right Shoring System – San Francisco ExperienceBy Heinrich Majewski, Rob Jameson
"Careful review of site conditions and constraints is essential to select the appropriate shoring system for each project. Key evaluation criteria include the geotechnical profile, groundwater and env
Jan 1, 2017
-
Evaluating Bending Failure Of Floating Soil-cement (Sc) Columns Under Road Embankments Using 3d FeaBy Sailesh S. Author
The current design method for soil-cement (SC) columns improved soft clayey ground under the highway embankments assumes a slip circle failure surface shearing through the columns and the soils using
-
Case Histories of Circular Secant Pile Access Shafts for TunnelsBy Piotr Kozlowski, Stanley L. Worst, Matthew J. Niermann
Circular secant pile shafts were installed along the tunnel alignments for both the Ohio Canal Interceptor Tunnel project in Akron, Ohio and the Ohio River Tunnel project in Louisville, Kentucky. The
Jan 1, 2019
-
An Unique Formula for the Stone-Column Group EfficiencyBy Abhijit Saha
"The stone columns improve the performance of foundations on soft and loose soil due to the ability of composite ground to sustain increased structural loads under reduced settlements. The interaction
Jan 1, 2015
-
Design Issues for Mini-Caissons in the NYC AreaBy Caciola Jr. Joseph J., Nidal M. AbiSaab
"Thanks in great part to the geology of the New York City Metropolitan area, mini-caissons are a popular choice for deep foundations. These drilled elements are readily available, easy to install with
Jan 1, 2016
-
Skin Friction In Shale: Results Of The Hwy. 81 Bridge, Yankton, SD Drilled Shaft Load TestBy Scott M. Mackiewicz
This project includes replacement of the historic vertical-lift span Meridian Bridge (U.S. Highway 81 over the Missouri River) that connects Yankton, South Dakota with rural Cedar County, Nebraska. T
Jan 1, 2008
-
“Trevi-Calatore”: Innovation in Cut and Cover and Tunneling for the Installation of Plunge Columns Aimed to Excavate Underground Structures through the Top-Down MethodBy Alessandro Bertero, Manuel Toniolo, Vincenzo Tirozzi
"The installation of foundation elements (large-diameter Bored Piles or Diaphragm Walls) for the execution of underground works to be performed through the ""Top Down"" Technique (Stations, Car Parks,
Jan 1, 2016
-
Performance of Cement Deep Mixing Method in 2011 Tohoku EarthquakeBy Shoji Higashi, Nobuhiro Honda, Takeo Asanuma, Tatsuo Nagatsu, Masaki Kitazume, Sachihiko Tokunaga, Shigeru Kubo, Hidenori Takahashi, Tsuneyasu Onishi, Yoshiyuki Morikawa
"Various kinds of civil engineering structures and facilities were seriously damaged in the earthquake in Tohoku and Kanto regions of Japan on 11 March 2011 due to the greatness of its magnitude. In c
Jan 1, 2015