The Choice between HSDT and RLT: Selection Criteria for Concrete Pile TestingBy P. Middendorp, Gerald E. H. Verbeek
"INTRODUCTIONStatic Load Testing (SLT) is generally considered the pile testing method that provides the de-facto answers regarding pile capacity and load-deflection behavior. However, as this testing
Jan 1, 2006
-
An Investigation Of Pile Foundations Installed During The Late 19th And Early 20th Century For Re-Use In Building SupportBy Scott M. Doehla
A proposed rehabilitation of a 200,000 sf, 75-foot high steel-frame building at the former U.S. Navy Yard in Brooklyn, New York required the review of existing foundation data and an investigation of
Jan 1, 2008
-
Nyct's 207th St Yard FloodwallBy Christian L. Escalera
Over seven years ago, on October 29, 2012, Superstorm Sandy pummeled the Northeast of the United States inflicting heavy damage on New York City Transit’s (NYCT) system. Since then, NYCT has been meth
-
Uncertainties in CSL Test Interpretations and Recommendations toward a More Efficient Process (d88ba311-8a75-4265-90f4-c083be22cd1a)By Mark A. Rohrbach, Timothy R. Kovacs, PhD Saidin
"Crosshole Sonic Logging (CSL) testing is commonly used to verify the integrity, quality and ultimately the acceptability of the concrete in structural elements such as drilled shaft foundations, seca
Jan 1, 2017
-
Installation Of Augered Cast-In-Place PilesBy Michael Moran
Typical ACIP Pile Rig [ ] Hollow Stem Auger ? Continuous flight auger ? 3 inch inside diameter pipe ? Auger diameters: 12, 14, 16, 18, 20, 22, 24, 30, and 36 inches ? Auger section lengths:
Jan 1, 2005
-
Hybrid Energy System Installed on Deep Mixing BargeBy Kento Miyamoto, Kazuki Imamura, Takayuki Tanaka
"Global economic development has drastically increased energy consumption in various fields, and CO2 emissions, which are a prime cause of global warming, have continued to increase. Therefore, measur
Jan 1, 2015
-
2100 L Street Underpinning & Support Of ExcavationBy Charles R. Conlon, Matthew J. Niermann
This paper presents the underpinning and excavation support systems used for construction at 2100 L Street in Washington, DC. The excavation for the proposed building extended below bedrock, which pre
-
Optimization of Drilled Shaft Design for a Highway Bridge in Arizona Using Load Test Results (0a742001-9cf1-441f-b0fc-5890697ef97e)By John C. Niedzielski, A. Frances Ackerman
The existing US-70 Bridge over the Gila River at Bylas, Arizona is planned to be replaced due to its current poor condition. The replacement bridge is planned to be a 15-span, 1,904-foot (580 meter) l
Jan 1, 2017
-
Optimization Of Drilled Shaft Design For A Highway Bridge In Arizona Using Load Test ResultsBy John C. Niedzielski
The existing US-70 Bridge over the Gila River at Bylas, Arizona is planned to be replaced due to its current poor condition. The replacement bridge is planned to be a 15-span, 1,904-foot (580 meter)
-
Remedial Drilling and Grouting at Abiquiu Dam, Nm and Fluid Losses in the Embankment, A Case HistoryBy Suzanne R. Hess-Brittelle, Sharon L. Schulz, Tyler J. Quick, Amy F. Ebnet
"Abiquiu Dam is a rolled earth fill dam with impermeable core located on the Rio Chama in New Mexico. Abiquiu has had a history of excessive seepage through the fractured sandstone abutments since wat
Jan 1, 2016
-
Diplomacy and Innovation: Octakong and the Hong Kong-Zhuhai-Macau Bridge ProjectBy David White
"When finished (projected completion in 2016) the Hong Kong-Zhuhai-Macau Bridge Project will comprise three cable-stayed span bridges and a 4.15 mile immersed tube tunnel - linking Hong Kong to Macau
Jan 1, 2017
-
Session 21 "Grouting in Karst"By Jim Henry
I would say mainly the cost. I showed only 3 cases. One of them was the one that Allen just described and there were two other cases. In those cases it was fairly easy to develop a solution using limi
Feb 10, 2003
-
The Nonlinear Constitutive Behaviour of Coode Island SiltBy Rae Mackay, Kaveh Ranjbar Pouya, Ali Tolooiyan
"A major part of Melbourne’s central business district is underlain by a very soft silty clay deposit known as Coode Island Silt (CIS). Due to the low strength of CIS, most construction in the region
Jan 1, 1900
-
The Emerging Technology of EHDEBy Jerold Bishop, Grant Bearss, Aleksey Egorov
"When a shock wave is released in the bottom of a drill hole filled with wet concrete slurry, the result is called an electrohydrodynamic effect, or EHDE. The energy is carried through the fluid with
Jan 1, 2009
-
Session 17 "Grout for Enhancement of Piles and Piers"By Dennis Wrixon
It was a little bit exceeded. The decision was the uniform settlement is measured at each one corner and the highest one corner is the important one. And in addition there is a differential settlement
Feb 10, 2003
-
St. Louis Service Base Floating Wharf Mooring System ReplacementBy A. Bozorgzadeh, B. M. Jensen, B. N. Koelling, B. R. Murtaugh
"The Service Base mooring system originally consisted of two general types of structures, 19 timber piles cabled together and steel three-legged pipe piles. The St. Louis District fleet moored to the
Jan 1, 2017
-
Proposed Micropile Section for the 2006 IBCBy Lawrence F. Johnsen, Marc J. Gallagher
"Micropiles are small diameter, bored, grouted-in-place piles incorporating steel casing and/or reinforcements. The omission of micropiles from most United States building codes has resulted in the ap
Jan 1, 2005
-
Application of Special Geotechnical Construction Equipment at the Alaskan Way Viaduct Replacement ProjectBy Richard Hanke, Franz-Werner Gerressen
"The twin decked Alaskan Way Viaduct is a passage to Seattle’s downtown waterfront and of great economic importance to the city. In 2001, the Nisqually earthquake damaged the viaduct and led to the re
Jan 1, 2015
-
Preliminary Assessment Of Reliability And Sampling Requirements For Deep Mixing Method (Dmm) Foundations For Lng Processing Facility And Storage TankBy Edward C. Clukey
A deep mixing method (DMM) foundation was selected by the Project Team for a very largeLNG facility in West Africa. As described in a companion paper, this foundation consists of alarge number of colu
-
Settlement Control Of A Road Embankment Using Vertical DrainsBy Wei Tu
A grade separation was required to allow uninterrupted traffic crossing for a busy rail spur and a county road. The grade separation was achieved by creating a 30-foot (9-meter) high embankment that
Jan 1, 2009