Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Application of the Blast Fragmentation Models in a Sandstone Quarry

    By Türker Hüdaverdi, Özge Akyildiz

    "In this research, image analysis technique, Kuz-Ram and KCO Models were used to examineefficiency of the quarry blasts. Investigations were performed in Cendere region, Istanbul. As a firststep, imag

    Jan 1, 2016

  • ISEE
    Comparative Blasting Using Non-Electric Pyrotechnic Delays and the Electrodet Electronic Delay System at a Limestone Quarry in New York State, USA

    By Carl Lubbe, Ron Frye, Wayne Curtis, Julie Pecori, Dan Leach

    Blasting conducted in the USA using the new Electronic Initiation System developed by Altech has shown that an accurate delay system will benefit the customer. Results from test work clearly showed th

    Jan 1, 1997

  • ISEE
    The Effect of Calculated Explosive Energy Output on Blast Design

    By P D. Kasbanis, Lyall Workman

    "The energy output of an explosive is typically calculated using an equation of state and computerapplications. Results are reported as weight and bulk strength, either in absolute terms or relative t

    Jan 1, 1996

  • ISEE
    Blasting and Groundwater Contamination – Case Study

    By James Tarr, Matthew Eichler, Brent Tardif

    ANFO was being used as one of the blasting agents on a construction site in New England. Groundwater was encountered in numerous blast holes. The blasting contractor was employing typical explosives l

    Jan 1, 2003

  • ISEE
    Application of Non-Newtonian Fluid Mixture for Stemming Performance Optimization

    By Braden Lusk, Paul Sainato, Josh Calnan, Hiago Vasconcelos, Luis Felipe Marinho

    "Blasting and rock fragmentation is one the most important unit operations in mining. Since itsintroduction into the mine production cycle, mining has become more efficient in mineral production(Hartm

    Jan 1, 2016

  • ISEE
    A Model for Near and Farfield Blast Vibration Based on Multiple Seed Waveforms and Transfer Functions

    By D. Scott Scovira, Ruilin Yang

    Blast vibration in the highwall from a cast blast in open pit mines or in the hanging walls from a stope blast in underground mines is a common concern. Vibration in such cases is a typical near-field

    Jan 1, 2010

  • ISEE
    Study of Blasting Produced Air Overpressure in Urban Area

    By Zou Dingxiang

    Rock blasting in the project of “Site Formation and Associated Infrastructure Works at Choi Wan Road and Jordan Valley” is the largest urban blasting project in the history of Hong Kong and also is ra

    Jan 1, 2007

  • ISEE
    Standard Digital Video Analysis and Engineering Field Controls

    By Tom Treleaven

    The success of any blast is dependent on the accuracy of the blast design and the field controls used on the shot. This point cannot be over emphasized because when the geometry is not measured and/or

    Jan 1, 2000

  • ISEE
    Digitized, Integrated and Optimized Drill and Blast

    By Sushil Bhandari, Amit Bhandari

    Drilling and Blasting are core operations in a mine. They impact all the downstream operations and their costs. Digital technologies exist for optimizing both drilling and blasting for many years. How

  • ISEE
    Analysis of Sympathetic Detonation in Detonating Cord

    By Abigail Styer, Paul Holmgren, Josh Calnan

    Detonating cord is a staple of the explosives industry, used widely in the civil and defense industries. Detonating cord is a thin, flexible plastic tube filled with pentaerythritol tetranitrate (PETN

  • ISEE
    Journal: 100 Years / Engineering News New York January 5, 1905 Methods and Cost of Blasting and Handling Boulders (52912f89-42e4-4811-8c7f-344764181b42)

    By Daniel Hauer

    Blocking. (5) The “blocking” of boulders is a much cheaper way of breaking them up than “mud capping.” It should always be used in preference to that method except when too much time will be consumed

    Jan 1, 2006

  • ISEE
    Borehole Inspection with the HRS-1 Video System

    By Tom Palangio, Ralph M. Olmstead

    Video inspection of boreholes with cameras developed specifically for the mining industry is now possible. These designs are reliable, cost effective, and have the flexibility to be used in other appl

    Jan 1, 1998

  • ISEE
    Explosive Detection Recovery and Disposal

    By Robert McClure

    The detection, recovery and disposal of commercial explosives and explosive waste has always carried a level of risk and requires specialized equipment and technical expertise. Improperly stored, disc

    Jan 1, 2015

  • ISEE
    Portable, Multi-Channel and Continuous Velocity of Detonation Recorders

    By Jackson R. Pressley, Bruce Vandenberg

    An explosive’s velocity of detonation, (VOD), can be used to indicate a number of important characteristics regarding the product’s performance, under specific field and test conditions.

    Jan 1, 1997

  • ISEE
    Seismograph Calibration - What You Should Know

    By Bob Turnbull

    The dictionary definition of calibration is: to determine by measurement or comparison with a standard, the corre c t value for each scale reading on a device.1 As a consultant or blast contractor, yo

    Jan 1, 2004

  • ISEE
    A Classic Experiment with Air Overpressure and Windows

    By Charlie Adcock, Rob Farnfield, Andy Wetherelt

    The ISEE Blasters Handbook gives guidance on the level of air overpressure likely to cause occasional window breakage (151dB) and general window breakage (171dB). A long-term safe level of 140dB is al

    Jan 1, 2006

  • ISEE
    A Hydrodynamics-Based Approach for Predicting the Blast Damage Zone in Drifting as Demonstrated using Concrete Block Data

    "Rock falls involving a relatively small amount of material are a leading cause ofinjuries in underground mines in the United States. A contributing factor is unwantedblast damage and over-break. A go

    Jan 1, 2009

  • ISEE
    Expansion of the Panama Canal

    By Tom Treleaven

    The widening of the Panama Canal to approximately 130 feet (40 m) for its entire length began just a few years ago. The original expansion program was slated for completion in 18 to 20 years, but has

    Jan 1, 1997

  • ISEE
    Journal: 100 Years / A Trip Through The Anthracite Coal Mines

    By Robert Hopler

    RBH Note: in 1913 black powder was still dominant as a coal-mining explosive, but permissible explosives were making some slight headway. For example, in 1902 there were only 11,300 pounds of permissi

    Jan 1, 2014

  • ISEE
    Techniques to Assess the Influence of Blast Design Parameters on Airblast and Blast Vibration

    By Robert Hivick, Frank Sames

    The control of environmental effects, especially blast vibration and airblast, has become a dominating planning criterion for most surface blasting operations. Compliance with existing regulations is

    Jan 1, 1999