Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Influence of Blast Delay Time on Rock Fragmentation in a 22-FT Bench

    By Mark S. Stagg, Stephen A. Rholl

    The Bureau of Mines is studying blast delay timing influences on rock fragmentation in a series of tests that started in 3-ft concrete blocks, progressed to 45in-bench reduced-scale tests in massive d

    Jan 1, 1988

  • ISEE
    Blasting Practices at the Fording River Operations

    By Murray B. Lytle

    The Fording River Operations of Fording Coal Ltd. in southeastern British Columbia is producing 45 million long tons of clean metallurgical coal for shipment to the Japanese steel industry on a 15 yea

    Jan 1, 1978

  • ISEE
    Blasting with ANFO/Poylstyrene Mixtures

    By Karl Kure, Anders M. Heltzen

    Mixtures of prilled ANFO and 0,5 - 3 mm polystyrene balls are interesting substitutes to the tube charges or other types of reduced explosives or detonation fuses. Experiments have shown detonation ab

    Jan 1, 1980

  • ISEE
    A Fractal and Damage Model for Rock-Breaking by Blasting

    By Wang Zhong Qian, Liu Hui

    The paper proposed a fractal and damage model for rock-breaking by blasting, which assumed that the process of rock-breaking results from intrincent fractal development and the accumulation of damage.

    Jan 1, 1997

  • ISEE
    Cosmar and Blasting

    By Lee W. Saperstien

    Section 709 of Public Law 95-87, "Surface Mining Control and Reclamation Act of 1977," requests the National Academy of Sciences to determine if the standards of the act are applicable to minerals oth

    Jan 1, 1979

  • ISEE
    Performance Support Systems: A New Tool for Explosives Users

    By L M. Stodart

    In the increasingly competitive environment of the 1990's, there is a need to provide the users of explosives with accurate and immediate information. Research has shown that information technology al

    Jan 1, 1993

  • ISEE
    Drilling and Blasting Practices

    By Thomas P. Mahoney

    Phelps Dodge Corporation's Tyrone Mine is a large open pit copper operation located in the southwestern corner of New Mexico. The Tyrone concentrator processes approximately 50,000 tons per day of cop

    Jan 1, 1986

  • ISEE
    Important Considerations When Selecting Rotary Blasthole Drills for High Altitude Use

    By Lyall Workman

    New mines are frequently located at altitudes above 3,000 meters (10,000 ft.). Drill selection must take the altitude effects into account, to insure high productivity and good bit life. In particular

    Jan 1, 2007

  • ISEE
    Azimuthal Variation of Ratiation of Seismic Energy from Cast Blasts

    By Robert Martin, Brian W. Stump

    As part of a series of seismic experiments designed to improve the understanding of the impact of mining blasts on verifying a Comprehensive Test Ban Treaty, a sixteen station network of three-compone

    Jan 1, 1997

  • ISEE
    Median and Mean in the Kuz-Ram Model

    By CVB Cunningham

    "The Kuz-Ram model as originally proposed included an error in assuming that the mean fragmentsize predicted by Kuznetsov’s equation was actually the 50% passing size. In 2003 Spathis began discussion

    Jan 1, 2016

  • ISEE
    Blind Hole Raise Blasting at the Homestake Mine

    By Justus Deen, Paul V. Sterk

    Through the 119 year history of the Homestake Mine various methods of raise mining have been used, these include conventional, bored, and drop raises. These raises provide passage for men and supplies

    Jan 1, 1996

  • ISEE
    Investigation of Blasting Fumes using Numerical Simulation

    By Sunil Vytla, Akash Adhikari, Purushotham Tukkaraja

    Blasting operations produces gases and fumes that may be toxic or non-toxic in nature. A detonation of commercial explosives such as ANFO, emulsion, and dynamite would ideally produce only nontoxic pr

  • ISEE
    Blast Densification to Prevent Soil Liquefaction in Volcanic Avalance Debris for Construction of the South Coldwatercreek Bridge, Mt. St. Helens

    By Ron J. Elliott, David G. Otto

    This project involved deep blast densification of recent volcanic avalanche debris deposits consisting of a 43 meter thickness of loose clean to slightly silty sand, gravel, cobbles and boulders depos

    Jan 1, 1994

  • ISEE
    "Blast Vibration and Seismograph Section - A History of the Development of Instrumentsfor Measuring Vibrations of the Earth - Part 2"

    By Robert Hopler

    In part one we discussed a Chinese seismoscope allegedly invented and used in the year 136 (or 132, depending on the source). Interestingly, historical references to the measurement of earth movement

    Jan 1, 2006

  • ISEE
    Keeping Airblasts Under Control

    By Jaak J. K Daemen, Clayton R. Morlock

    A study was performed to evaluate the predictability of airblast overpressures induces by production mine blasting. Thirty-seven production blasts were monitored using 3 blasting seismographs giving o

    Jan 1, 1983

  • ISEE
    Blind Hole Raise Blasting at the Homestake Mine

    By Justus Deen, Paul V. Sterk

    Through the 119 year history of the Homestake Mine various methods of raise mining have been used, these include conventional, bored, and drop raises. These raises provide passage for men and supplies

    Jan 1, 1996

  • ISEE
    Residential Structural Response to Airblast From Munitions Disposal at the McAlester Army Ammunitions Plant

    By Calvin L. Cumerlato, David E. Siskind

    The Bureau of Mines has monitored structural responses to airblast overpressure produced by munitions disposal at the McAlester Army Ammunition Plant. The Purpose of this study was to determine if the

    Jan 1, 1994

  • ISEE
    The Importance of the Explosive Confinement

    By Manuel Gutkrrez, Nasslo Gallardo, Arturo Cancec

    The study done in Dofia In&s de Collahuasi aims to improve the fragmentation in one of the most difficult rocks to deal with in an operation, It is the Ignimbrita. In order to avoid ejections and to i

    Jan 1, 2001

  • ISEE
    Numerical Simulation for Linear Charge Coyote Blasting with Presplitting Boreholes

    By Huang Fenglei, Jin Qiankun

    A new linear charge method has been applied in coyote blasting for highway excavation in which presplitting boreholes are set along the designed rock slope with some empty chambers at the end of linea

    Jan 1, 1998

  • ISEE
    Source Scaling of Single-Fired and Delay-Fired Explosions Constrained by In-Mine and Regional Seismograms

    By Brian Stump, D. Craig Pearson

    This work quantifies seismic coupling as a function of charge weight for single-fired (simultaneously detonated) explosions observed in the mine and at regional distances. These single-fired explosion

    Jan 1, 2002