Drilling and Shooting of a Large Air Shaft at an Underground MineBy Curtis Garner
Griesemer Stone located in Springfield, Missouri has supplied aggregate in Southwest Missouri since 1946. In 1954 the decision was made to mine the formation and utilize the mined out area for warehou
Jan 1, 1991
-
The Evolution of Mining and Explosives in the Powder River BasinBy Joseph W. Hejny, Marlyn G. King
Coal mining in the Powder River Basin has changed in recent years to accommodate the large quantity of coal produced. With strip ratios of one to one and up to three to one, extensive amounts of overb
Jan 1, 1994
-
Global Implementation of Track and Trace Solutions and Challenges for ManufacturersBy TTE-Europe GmbH
A few years ago, the term Track & Trace for explosives was only known in Europe and Brazil at most; the introduction of this technology is experiencing an undreamt-of boom worldwide. More and more cou
Jan 26, 2026
-
Analysis of the Rock Mass by Geophysical MethodsBy France Goupil, Richard Barabe
In 1987, a large company reopened its quarry located in a very dense urban area in Montreal-East. This reopening occurred after a long period of inactivity during which houses were built within 200 fe
Jan 1, 1992
-
Computer Cast Blast ModellingBy Mike McGill, Stephen Chung, Dale S. Preece
Cast blasting can be designed to utilize explosive energy effectively and economically for coal mining operations to remove overburden material. The more overburden removed by explosives, the less bla
Jan 1, 1994
-
Effect of Blast Preconditioning on Communition for Selected Rock TypesCurrent research in comminution includes efforts to increase the efficiency of mineral processing systems and reduce the amount of electrical energy needed for size reduction. In most mining operation
Jan 1, 1996
-
Remote Vibration Monitoring as Historic StructionsBy Tom Donnelly, Roger C. Ilsley
Remote telecommunications seismographs were used to monitor blast vibrations at two historic structures in Cedarburg, Wisconsin during adjacent sewer line construction. The purpose of the vibration mo
Jan 1, 1991
-
Case Study: Iterative Design Process of Presplitting in an Underground Overhand Cut and Fill MineBy David Porter, Nathan Rouse
The implementation of presplit blasting has been widely utilized in open pit and underground tunneling. This case study works through the iterative process of developing a heading drill and blast desi
Feb 6, 2023
-
The Measurement and Control of Blast Induced Damage of Final Pit Walls in Open Pit MiningBy William R. Adamson, Carlos R. Scherpenisse
The successful development of surface mining operations depends, amongst other factors, on the successful creation of final pit walls which offer long term structural stability. The achievement of suc
Jan 1, 1998
-
A Blast Vibration Prediction and Data Storage Computer ProgramBy Jerry W. Schweiker
An extensive computer program has been developed which will store and analyze pertinent blast related parameters such as date, time, shot coordinates, charge, delay times, etc. In conjunction with the
Jan 1, 1984
-
Computer Aided Design of Ring BlastsBy Calvin Konya, Theodore R. Myers, Robert Lundquist
The design of a single, large mass blast using ring drilling may take two to three months. This time requirement inhibits the evaluation of multiple designs. It also reduces the flexibility to redesig
Jan 1, 1990
-
New Developments in Seismic ExplosivesBy Oldrich Machacek
Seismic explosives are very important tools in the search for oil and gas. Changes and new techniques in seismic exploration methods are also demanding new developments in seismic explosives. This art
Jan 1, 1985
-
Silently Controlling Cracking TechnologyBy Guang-Xin Li, Rui-Ping Guo
Based on the analysis of factors affecting the cracking performance of Silently Cracking Agent (SCA), a new SCA structural model is built and a study on the swelling mechanism of SCA and a method to i
Jan 1, 2000
-
Inaccurate Blasthole DrillingBy Alan R. Cameron, William W. Forsyth, Tom H. Kleine
In the production environment, the current limits of blasting are most often defined by the ability of the operator to drill blastholes from a planned collar location to the required toe location. Man
Jan 1, 1995
-
Rock Drilling on a Vertical Wall: Problem solving at Crazy Horse MemorialBy Jeff Hermanson
Every construction project has site specific problems that need to be dealt with. These problems may be created by the geology, location, weather, time constraints, etc. Once these problems have been
Jan 1, 1996
-
Delay Timing and Vibration Characteristics at Low-Frequency Mine SitesBy D E. Siskind
The Bureau of Mines performed a comparative study of nine sites at eight surface coal mines to determine if the presence of near-surfaced underground abandoned workings resulted in the generation of a
Jan 1, 1990
-
Potential Blaster Liability under CERCLABy Charles A. Kliche
The Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA) established a national program for responding to releases of hazardous substances into the environment. The fu
Jan 1, 1997
-
Direct Measurement of "Borehole" Pressure of ExplosivesBy Philip Barnhard, Lyman G. Bahr
By recording the arrival time of a pipe wall at evenly spaced intervals in a plane perpendicular to the pipe axis, application of the equations of motion permits calculation of the pressure of the exp
Jan 1, 1981
-
Blasting Effects on Water WellsBy D T. Froedge
Before this study was started, literature was searched and cases of alleged water well damage were investigated. Occurrence of ground water in Appalachia is primarily in low yield, fractured, water ta
Jan 1, 1983
-
Experimental Investigation of the Fumes Produced by Modern Commercial ExplosivesBy P D. Katsabanis, W Roberts
Commercial explosives exhibit non ideal behaviour which is very difficult to model. The fume spectrum produced by commercial explosives apart from its practical significance for underground mining is