Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Journal: 21st Annual Photo Contest - Honorable Mention, "Demolition Blasting 1,000 Milliseconds in the Demolition of a Cyclone Tower"

    By Walter Voglauer, Elisabeth Zechmeister

    Five serial photos show the first second of the demolition of a 75 m high, reinforced concrete tower in the 23rd District of Vienna, Austria. The tower demolition with high explosives was necessary be

    Jan 1, 2015

  • ISEE
    Blast Preconditioning – A Development and Operational Challenge

    By Jeff Gore, Jack Dermody, David Gribble, Brett Macaulay, Bart Sharpe, Paul Klaric, Paul Thornley, Ben DeVries

    Optimal Fragmentation in Block Caving is difficult to achieve as it is generally defined by the rock mass itself and the way in which the cave is initiated. The lower portion of the cave has even less

    Jan 1, 2013

  • ISEE
    Success Case: Technical and Operational Assurance of Blasting Near Neighboring Mine Structures

    By Hector O. Romero, Paulo C. Fernández A, Claudio C. Gajardo

    Phase 06 of the Los Bronces mine, currently under extraction for development, has the particularity of being close to the installations and buildings of a neighboring copper mine. Therefore, the blast

    Jan 21, 2025

  • ISEE
    The Smart Application of Explosives for Drill to Mill (D2M) Optimization

    By J. Silva, M. Kotraba, F. Pontanilla

    Blasting is the application of highly complex science that, in some cases, could be viewed as an art. Many variables are involved in a blast, including geology, pattern design, timing and firing seque

    Jan 1, 2024

  • ISEE
    Precision Delay Detonators and Their Effect on Blasting Performance in Quarry Blasts

    By B Mohanty, M Alam, F Gauthuer

    A series of eleven full-scale production blasts has been earned out in a limestone quarry to study the effect of delay interval and its precision on overall blasting performance. The quarry employed A

    Jan 1, 1991

  • ISEE
    Destress Mass Blast in the North Regional Pillar at Brunswick Mine

    By Philemon Desrochers, Ken Qian Liu

    Following the success of the West Ore Zone distress mass blast in 2001 at Brunswick Mine, a similar approach was taken to distress the North Regional Pillar (NRP) which contained over 3 million tonnes

    Jan 1, 2004

  • ISEE
    Blast Fume Management

    By Alan B. Richards, Aleks Todoroski

    The undesirable effects of blasting fumes can be controlled by minimising the amount of fume created, and by avoiding the movement of the fume plume to sensitive locations. Substantial progress has be

    Jan 1, 2017

  • ISEE
    Shock-Wave Refraction Tape (S.R.T.) a New Type of Explosive Fracturing Charge

    By S C. Alford

    Explosive fracturing of metal is usually considered to be an imprecise process but, by careful consideration of shock-wave geometry, precise results are obtainable. The limited development of such cha

    Jan 1, 1986

  • ISEE
    New Methodology for Excavation of High Drawbells With Pre-Loading.

    By Guillermo Lazcano Ríos, Jorge Parvez Aguirre, Alejandro G. Díaz Berríos, Felipe Rodriguez Alveal

    Codelco's Chuquicamata Underground Division (DCHS) faces issues due to collapses in its subsidence streets, which hinders the advancement of the subsidence front and leads to the loss of areas and res

    Jan 21, 2025

  • ISEE
    A New Approach to the Shock Energy/Gas Energy Concept

    By Thierry Bernard

    Today, experimental measurement of the shock energy/gas energy pair, or pool test, has now become virtually standard. But pool" energy per m(exp 3) of bedrock has no significance for explosives used i

    Jan 1, 1994

  • ISEE
    Advantages of EFI Based Detonator Technology in Commercial Blasting Applications

    By Richard Givens, Thomas Baginski

    Technological advancements in warhead designs and implementations have driven the development of arrayed initiation networks of highly accurate, highly reliable, and extremely safe detonators. Recent

    Jan 1, 2011

  • ISEE
    Effect of Blasting Vibrations from Deck Blasts on Pit Wall Stability (Blasting and Fragmentation Vol. 11, No. 1, 2017)

    By B Mohanty, A Siamaki, K Esmaeili

    Large scale open pit mining and quarrying operations dictate safe and reliable pit wall stability. The current approach of employing the particle velocity-scaled charge distance approach to estimate a

    Jan 1, 2017

  • ISEE
    Optimization of Ring Blast Design for Ore Dilution Control in Underground Hard Rock Mine Using Numerical Simulation

    By A. Vishwakarma, V. Himanshu, K. Dey

    Underground mining is the most feasible method after extinction of shallow depth ore deposits. Longhole stoping method is the most technically advanced method for the faster excavation. In this method

    Jan 1, 2024

  • ISEE
    Rock Fragmentation Prediction Using Machine Learning

    By Ankit Jha, RICHARD AMOAKO

    In this paper, we examine the challenges associated with the use of empirical rock fragmentation models. We highlight key parameters omitted by these models, and propose a machine learning approach th

    Feb 1, 2020

  • ISEE
    Burden and Spacing Effect on Underground Limestone Fragmentation using Quantitative 3D Modeling

    By Mark Spaniel

    Computer 3D modeling to evaluate the potential underground blasting fragmentation performance based on rock within calculated damage radii along drillholes, as well as the burden distance from explosi

    Feb 1, 2020

  • ISEE
    Underground Airblast Monitoring for Blast Performance Diagnosis and Detailed Attenuation Modelling

    By Jon Hurt, Brent Meins, David Vardiman

    "Two test blasts were conducted at the Sanford Underground Research Facility to establish optimum blast designs and to limit blast effects on existing research rooms and equipment in preparation for t

    Jan 1, 2017

  • ISEE
    An Energy Equality Approach to Blasting

    By Daniel Scott

    Mines have used explosives for economical fragmentation for many years. It can therefore be expected that the mining industry has thoroughly researched how to achieve the most efficient blast. However

    Jan 1, 2012

  • ISEE
    MINE AUTOMATION PROGRAM: Drill and Blast Analvsis

    By Lawrence Mirabelli, Wayne Lidkea, Mario Paventi

    On Januarv 1, 1996, INCO Limited, Tamrock OY, Dyno Nobel and CANMET formed a consortium for the development of robotic mining equipment called the Mining Automation Program (MAP). This project was a t

    Jan 1, 2001

  • ISEE
    Optimized Blast Design Through Drone Surveying and 3D Geological Modeling to Solve Highwall Stability Problems

    By Matt Brandon

    This case study demonstrates how integrating drone and GPS surveying with 3D modeling software creates more effective blast designs that address specific geotechnical challenges while improving safety

    Jan 26, 2026

  • ISEE
    Surface Vibration Measurements from Deep Hole Blasts

    By Jesus Pascual, Jose Sanchidrian, Pablo Segarra

    The surface vibration field in the area above an underground mine prior to its development has been investigated, in order to assess the vibration levels expected in existing buildings and in the plan

    Jan 1, 2002