Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Gurney’s Journey—pipe-bomb Fragments And Fumes

    By Michael Wieland

    The thrust of this report is to overcome some of the technical deficiency in the scientific methodology that correlates the work output during a charge explosion to the resulting toxic fumes. Thermody

    Jan 1, 2010

  • ISEE
    Inverse Hybrid Method for Determining Pressure Loading on Plates Due To Buried Mines

    By Damien Bretall, William Fourney

    Due to the changing face of warfare there is an ever growing need to protect the underside of combat vehicles from mine blasts. This paper presents a new method to better characterize the pressure pro

    Jan 1, 2009

  • ISEE
    Low Level Continuous Vibration and Potential Damage

    By Edward J. Jr Walter, Edward J. Walter

    The vibration problem is approximately fifty years old. The original investigation of the U.S. Bureau of Mines was begun in 1930. Significant investigation into the problem was done by Crandell, Lange

    Jan 1, 1979

  • ISEE
    Would That Low-density Explosive Work For This Rock?

    By Michael Wieland

    The thermodynamics work-principle was used to develop the rupture-fracture-throw (RFT) model for ranking the performance of reduced-density explosives when shot in rock or other stratum. The RFT model

    Jan 1, 2011

  • ISEE
    From Making Blasts to Making Images

    By Fred Drury

    I spent 38 years in the Industry in a variety of sales, technical and management positions. I started out with Hercules, then was one of the founders of ECONEX, a large regional Distributor, and final

    Jan 1, 2003

  • ISEE
    Innovative Methods of the Use of Explosives and Non-Explosive Demolition Methods in Sensitive Areas; Non-Explosive Demolition Agents to Enhance Profit Margins in Difficult Rock or Concrete Removal Projects

    With the ever increasing problems of narrowing profit margins, and increased liability, a solution/option to SEE members is needed. It is essential that all members understand the benefits of utilizin

    Jan 1, 1995

  • ISEE
    Charleroi Locks and Dam - Old River Wall Explosive Demolition

    By David Harrison

    The Charleroi Locks and Dam (Figure 1) was completed in 1932 and is located on the Monongahela River, approximately 22 miles (35 km) south of Pittsburgh, in Charleroi, Pennsylvania. It is comprised of

    Jan 1, 2015

  • ISEE
    Half a Century of Service in the Interests of Explosives

    By J E. (Boet) Coetzee

    SAFEX International, as the name suggests, is a global organisation, which has the fundamental objective of improving the safety of operations concerned with the manufacture, storage, transport, and u

    Jan 1, 2005

  • ISEE
    ISEE Security Workshop Impact of Enhanced Security on Operations

    By Dyno Nobel

    Impact of Enhanced Security on Operations Budgeting - What is the “value” I receive for enhanced security? Is there a “return” for the money I spend? Regulatory driven Economic driven

    Jan 1, 2006

  • ISEE
    Environmental Effects of Blast Induced Immissions

    By Rolf R. Schillinger

    Subject of the paper are blasting vibrations as sources of environmental molestations including acceptance level,complaint level and damage level as well. Besides, the subject shows a comparison of in

    Jan 1, 1996

  • ISEE
    Electromagnetic Characterization of an Explosives Mixing Site at Blackie, Alberta

    By David G. Paton

    "Electromagnetic surveys were conducted at the BXL Bulk Explosives Limited Mixing Plant andsurrounding area to characterize runoff from the site and possible impacts of salinity. The BXL Plant is loca

    Jan 1, 1999

  • ISEE
    Method of Ground Water Removal from Blast Holes

    By I. Petrovsky

    Presence of the ground water, especially flowing water, causes limitations in the type of the explosives, which can be used for the blasting development in the open cats and quarries. This presents re

    Jan 1, 2003

  • ISEE
    Recent European Developments Relating to Pyrotechnics

    By R. K. Wharton

    The paper reviews the development of European harmonised standards for fireworks, recent major incidents involving the bulk storage of fireworks which led to research funded by the European Commission

    Jan 1, 2005

  • ISEE
    Density Monitoring of Bulk Emulsion Explosives in Confined Boreholes

    By Felipe França Sitonio

    Parameter’s control of explosives used in blasting operations have become more relevant over the years, bringing a better understanding of detonation performance. Giving into consideration that bulk e

    Feb 2, 2020

  • ISEE
    Using Dry ANFO in the Pacific Northwest Rainforest: Washington State

    By William C. Lane

    The Pacific Northwest has an abundance of seamy, coarse granite and basalt rock. It is used primarily for road construction. Small quarries are opened nearest the road work to cut the cost of hauling.

    Jan 1, 1986

  • ISEE
    Charleroi Locks and Dam - Old River Wall Explosive Demolition - Final Stage - Phase 2

    By David Harrison, Brian Harrison

    The Army Corps of Engineers completed the Charleroi Lock and Dam in 1932. It is located on the Monongahela river approximately 22 miles (35k) south of Pittsburgh in Charleroi, Pennsylvania. It is comp

    Jan 1, 2018

  • ISEE
    On the Development of Explosion Technology in Seoul Metro-Subway Construction

    By Ginn Huh

    The blasting work to construct a subway in Seoul, Korea have often caused increased neighbor’s complaints because of ground vibration. In order to prevent the damage to the structure, it was necessary

    Jan 1, 2000

  • ISEE
    Sequence of Events During a Blast

    By Favreau R. F. Ph. D, Favreau Patrice

    The article explains that the way to achieve a successful blast is by insuring that the explosive energy divides properly into the weakening action of the shock wave which is necessary to prevent larg

    Feb 1, 2020

  • ISEE
    Portsmouth Harbor Project

    By Vincent Thorne

    On January 2, 1992, the R. Zoppo Company of Stoughton, Massachusetts started drilling and blasting operations on U.S. Army Corps of Engineers Project Number: DACW33-91-B-0072 to widen and deepen the P

    Jan 1, 1993

  • ISEE
    An Empirical Method of Comparing Brisance of Various Bulk Explosives

    By Neal Lee, Braden T. Lusk, Brendan McCray

    "Selection of a blasting agent for optimum performance is based on many variables. Often, a decision is made with regard to product cost and field testing. Defining optimum performance can be difficul

    Jan 1, 2017