Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Prediction Of Slope Failure At Letlhakane Mine With The Geomos Slope Monitoring SystemBy George Kayesa
[ ] A multiple-bench slope failure occurred at Letlhakane mine on 14th July 2005. No injuries or damage to equipment was suffered and mining production was not affected. Slope failure was precede
Jan 1, 2006
-
In Situ Monitoring of Primary Roofbolts at Underground Coal Mines in the USAPrimary roof support represents the first line of defence against rockrelated falls of ground in underground mines, and improper utilization or misunderstanding of the applicability and behaviour of p
Jan 1, 2014
-
The significance of grinding environment on the flotation of UG2 ores - SynopsisA large body of work exists discussing the impact of grinding media on mineral flotation. Generally, the work indicates that a change to a less electrochemically active grinding environment has positi
Jan 1, 2009
-
Controlling stoping costs in a gold mining environmentBy M. Grave
Rock Engineers are required to design safe cost effective support systems and stoping layouts for their respective mines. As each stope has its own unique environment, continual re evaluation is requi
Jan 1, 2009
-
Fundamentals Of Designing Refractory Linings For Hydrometallurgy AutoclavesBy A. Koning
Pressure hydrometallurgy operations require vessels to be lined with an impermeable membrane for corrosion protection and one or more courses of refractory or ceramic brick. Examples of unit operation
Aug 1, 2013
-
Ilmenite Smelting At Ticor SABy D. Bessinger, H. Kotzé, J. Beukes
Keywords: Pyrometallurgy, furnace, ilmenite, smelting, Ticor Ticor SA began with a detailed feasibility study in 1995. The Hillendale mine (situated between Richards Bay and Empangeni) and Minera
Jan 1, 2006
-
Gautrain: Tunneling Challenges - Site Investigations Carried Out By ProvinceBy Ron Tluczek
[Power Point Presentation]
Jan 1, 2006
-
Managing Mine Road Maintenance Interventions Using Mine Truck On-Board DataBy Willem J. Marais
The management of unpaved mine road networks on large surface mines rarely results in optimal road maintenance strategies and minimised total road-user costs. This is ascribed mostly to the complex a
Jan 1, 2008
-
SPOTLIGHT on engineering manpower'We are going to be short of engineers for the foreseeable future, and particularly short of civil and heavy-current electrical engineers'. This is the basic message that emerges from the re
Jan 1, 1985
-
A New Mathematical Programming Model For Production Schedule Optimization In Underground Mining OperationsMixed integer programming (MIP) has been used for optimizing production schedules of mines since the 1960s and is recognized a shaving significant potential for optimizing production scheduling proble
Jan 1, 2010
-
Developments in the pretreatment of refractory gold minerals by nitric acidBy D. -X. Li
The paper covers many literature reports of processes using nitrogenous species as an oxidant for processing refractory gold ores, especially development in the pretreatment of refractory gold mineral
Jan 1, 2009
-
The tapping process in silicon productionBy K. H. Berget, V. Andersen, H. Tveit, R. Jensen
This paper presents some of the work carried out in order to improve the tapping process in silicon production, with special focus on the environmental and the safety standards. Some of the modelling
Jan 1, 2014
-
A Step towards Combating Rockburst Damage by Using Sacrificial SupportBy R. A. Govender, A. Mudau
"Rockbursts continue to be a major contributor to mine accidents and cause of damage to mine excavations, particularly at great depth. The problem of rockbursts has also escalated in civil engineering
Jan 1, 2016
-
Petroscopic observations of rock fracturing ahead of stope faces in deep-level gold minesBy A. J. Jager, G. R. Adams
The pattern of mining-induced fractures ahead of stope faces in deep-level gold mines, as revealed by petroscopic observations, is described. It is shown that there are zones of fractured and unfractu
Jan 1, 1980
-
Predicting The Compressive And Tensile Strength Of Rocks From Indentation Hardness Index - Synopsis (5d939d82-50f6-4a6f-af03-1325a51614fd)By S. Kahraman
The prediction of rock properties from indirect testing methods is important, particularly for preliminary investigations since indirect tests are easier and cheaper than the direct tests. In this stu
Jan 1, 2012
-
A Review Of Real-Time Optimization In Underground Mining ProductionBy Z. Song
Real-time monitoring makes it possible to detect any disturbance occurring in production, while decision instruments can efficiently assist decision-makers to optimize production, reduce iterative wor
Dec 1, 2013
-
Papers and Notes Presented to the Institute from July 1943 to February 1969YEAR 1943-1944 Vol. 44 Page A major change-over in the ventilation of a deep level mine, by F. G. Hill and E. C. Ranson, 27; Discussion 56, 62, 67, 71, 72, 79, 123, 129 131 A note on the quarrying
-
The computational analysis of shallow depth tabular mining problems - SynopsisBy J. A. L. Napier
The evaluation of stress distributions and deformations in the vicinity of tabular mine layouts has been carried out routinely for many years using the displacement discontinuity boundary element meth
Jan 1, 2007
-
The Determination of Species in Slags and other MaterialsBy S. M. Graham, G. Mellis
"The determination of the oxidation state(s) of an element present in a solid sample may be required for a number of reasons, including the assessment of the degree of reduction which has taken place
Jan 1, 2014
-
Considerations In The Choice Of Primary Access And Transportation Options In Platinum MinesBy R. P. H. Willis, A. G. du Plessis, R. B. Wilson
This paper reviews issues to be considered in choosing primary access and transportation options for platinum and other mines. It proposes appropriate criteria and a methodology for deciding on the op
Jan 1, 2004