Simulation Of Water Seepage Through And Stability Of Coal Mine Barrier Pillars (cd82e376-55f5-444d-97a9-eac4b7728369)By Y. Q. Zhang, Y. Luo, S. S. Peng, C. T. Holland
Barrier pillars in underground coal mines could eventually be subjected to a hydraulic pressure head due to the build-up of mine water in the old workings. The pressure head could not only act as a fo
Jan 1, 2001
-
The Potential Of GPS Guidance In The Mining IndustryRecent advances in GPS, machine guidance technology and telemetry allow an unprecedented level of control of surface mining operations. GPS technology can now locate the bucket of a shovel or the blad
Jan 1, 2004
-
Mine Planning at Newmont’s Nevada OperationsBy Steven Hoerger
Newmont Mining has a large, integrated gold-mining operation in northern Nevada with several mines, stockpiles and processing facilities. There are more than 90 defined metallurgical ore types and mo
Jan 1, 1999
-
Shrinkage Stoping at the Idarado MineBy William Hustrulid
INTRODUCTION The Idarado mine lies high in the San Juan Moun¬tains on the divide between the Uncompahgre and San Miguel Rivers and consists of a consolidation of a number of old and prominent mining
Jan 1, 1982
-
NATM Strategies In The U.S.?Lessons Learned From The Initial Support Design For The Caldecott 4th BoreBy Bhaskar B. Thapa
The design of the Caldecott 4th Bore, located along State Route 24 in Oakland, California, is based on the principles of the New Austrian Tunneling Method (NATM). Typical NATM initial support design p
-
Bleeder Entry Evaluation Using Condition Mapping and Numerical ModelingOne of the most common critical areas of longwall mining in terms of ground stability are the gateroad and bleeder entries. These critical entries provide much-needed safe access for miners and allow
Jan 7, 2020
-
Dewatering Precipitate Copper In Plate And Frame Filter PressesBy W. Joseph Schlitt
The use of plate and frame filter presses for dewatering cement copper at Kennecott' s Bingham Canyon precipitation plant is described. The dewatering process begins by periodically flushing a di
Jan 1, 1977
-
Stability Investigations In Three-Dimensions Around A Tunnel In A Metal Mine In ChinaBy P. H. S. W. Kulatilake
To exploit an underground mine effectively and safely, it is important to have a good understanding of the geotechnical behavior around underground excavations made in the mine. The aim of this study
Jan 1, 2012
-
Boart Longyear 4200 Surface Drill Features Improved SafetySafety is the No. 1 concern of any drill contractor or mine operator. Everyone in the industry knows a safe site helps stabilize operational costs and enables higher productivity. When it comes to ex
Jan 1, 2009
-
Coal ReviewBy F. Freme
Coal production in the United States in 2008 reached a record level of 1.06 Gt (1,171.5 million st), according to preliminary data from the U.S. Energy Information Administration (EIA) (Table 1). This
Jan 1, 2009
-
Correlations Of Grinding Mill Structural Design Procedures (PREPRINT NUMBER 92-194)By V. Svalbonas
When the Trelleborg Divisions of Boliden Allis and MPSI merged, a unique opportunity occurred for two independent mill fabricators to compare various design procedures and the research upon which they
Jan 1, 1992
-
First Automatic Shotcrete TechniqueBy C. D. Breeds, F. E. Valencia, J. H. Pye
The "FIRST AUTOMATIC SHOTCRETE TECHNIQUE" (F.A.S.T.) system, provides safe, efficient methods of remotely lining, shafts/raises. Two systems are available; one system will be used to shotcrete a 3.04m
Jan 1, 1981
-
Recent Expansion of Morenci's In-Pit Crushing and Conveying SystemBy Terry B. Linde, William M. Dowall
The recently completed In-Pit Crushing and Conveying Project at Phelps Dodge's Morenci Mine is rated among the world's leading materials handling projects. The operation involves the crushin
Jan 1, 1993
-
Advances In Autogenous And Semiautogenous GrindingBy Vladimir G. Kochnev
Crushing and grinding account for the major portion (60 to 80 percent) of the overall expenses for ore processing. Autogenous (AG) and semiautogenous grinding (SAG) have been considered a step forward
Jan 1, 2008
-
World?s Largest TBM Keeps Niagara Project On TrackBy Doug Harding
The Niagara Tunnel Project (NTP) is a 10.4-km- (6.5- mile-) long, 14.4-m (47.5-ft) bored tunnel that will run under the city of Niagara Falls from the Upper Niagara River to the Sir Adam Beck power st
Jan 1, 2008
-
Aeromagnetic and Radiometric Data Interpretation to Delineate the Structural Elements and Probable Precambrian Mineralization Zones: a Case Study, EgyptBy Ezz El Din Abdel Hakim Khalaf, Khalid S. Essa, Marc Munschy, Mohamed A. S. Youssef
This study focused on joint interpretation of the aeromagnetic and radiometric data to allocate and describe the structural elements and mineralization zones such as uranium, gold, and sulfide in the
Sep 22, 2022
-
Onsite Assembly And Hard Rock Tunneling At The Jinping-II Hydropower Station Tunnel ProjectBy Stephen M. Smading
The Jinping-II hydroelectric project in China features four parallel headrace tunnels approximately 18-km- (11-mile-) long. Two will be excavated by tunnel boring machines (TBM) and two by drill-and-b
Jan 1, 2009
-
Argyle - A New DevelopmentBy Richard D. Lang
The paper provides an overview of the activities which culminated in the decision to construct a major diamond mine in the north west of Australia. It presents a broad summary of the geological, minin
Jan 1, 1985
-
Earthmover Tires – Big Tires, Big ShortagesBy Tim O’Neil
The earthmover tire shortage has been a case of bust and boom for the tire industry. Tire producers were unwilling to invest ahead of the mining boom. In their defense, though, the metals sector of
Jan 1, 2006
-
Dust Control for Coal Handling : Design Considerations and SolutionsBy Henning E. Soderberg, Robert Brien, O&apos
Coal may be the answer to US energy problems, but it also has its drawbacks. If it is crushed, screened, dumped, or moved, the environmental engineer is faced with a dust problem. To control coal d
Jan 10, 1981