Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Subsidence Prediction In Illinois Coal Basin

    By Ed D. Doney

    Based on the subsidence data collected through a comprehensive subsidence monitoring program con: ducted over two longwall panels in an Illinois coal mine, mathematical models have been proposed for p

    Jan 1, 1990

  • SME-ICGCM
    Application Of Bolt Design Criteria At Galatia Mine

    By Tom Denton

    The bolt design criteria, since it was first published by Dr. John Stankus (Stankus, 1997), has been recognized as an important tool in ground control design. This concept is based on the Optimum Beam

    Jan 1, 2000

  • SME-ICGCM
    Drivage System In Retreat Longwall Gateroad

    By Kikuo Matsui

    In a difficult economic environment, the coal mines in Japan have been making extensive efforts in order to survive by rationalizing the mining operations. Introduction of a new longwall mining system

    Jan 1, 1995

  • SME-ICGCM
    Case Study of the Effect of Stratigraphic Location on Roof Stability in Rock Salt

    By Chris T. Franke

    The Waste Isolation Pilot Plant is a deep underground facility mined in bedded salt interspersed with persistent clay inter- beds. The clay seams delineate beams of salt above and below the excavation

    Jan 1, 1997

  • SME-ICGCM
    Subsidence Monitoring Results, Thick Seam Longwall Mining In Wyoming

    By Collin L. Stewart

    A summary of the results of a limited subsidence monitoring program at Cyprus Amax Coal Company's Shoshone Mine No. 1 in the Hanna Basin of south central Wyoming is presented. The monitoring prog

    Jan 1, 1995

  • SME-ICGCM
    A Computer Simulation Of Breakage Of The Main Roof In Longwall Mining

    By Deren Zhu

    Based on the results of field observation and physical model analyses, a computer simulation method, FEAEBP, has been developed for simulating the breakage of the main roof by considering it as a Kirc

    Jan 1, 1988

  • SME-ICGCM
    Laboratory Study Of Shear Loading And Bolt Load Transfer Mechanisms Under Constant Normal Stiffness Conditions

    One of the most important parameters in rock/resin/bolt load transfer mechanism is the surface property of the bolt. Although there are various bolt surface configurations available in the market, ver

    Jan 1, 1999

  • SME-ICGCM
    Economic Evaluation Of Subsidence Damage Mitigation Techniques

    By David C. Johnson

    Coal mining in Illinois has resulted in many structures being exposed to subsidence damage. Damage mitigation techniques (DMT) applied in the foundation design/construction have proven successful in m

    Jan 1, 1993

  • SME-ICGCM
    A Simple Finite Element Model For Predicting The Behaviour Of Hydraulically Powered Coalmine Supports

    By Brian G. D. Smart

    A scheme is presented whereby the complexities of design and operation of a hydraulically powered coalmine support are modelled using the finite element method. This enables predictions to be made of

    Jan 1, 1992

  • SME-ICGCM
    Investigation of Acoustic Emission Sensors for Ground Control Hazard Recognition in Underground Mines

    By Gary Buchan

    "Mine-wide ground control stability is essential to any mining operation to prevent catastrophic failure of underground structures. The ability to recognize or indicate the potential for ground contro

    Jan 1, 2018

  • SME-ICGCM
    A Novel System For Automatic Installation Of Cement Grouted Roof Bolts

    By A. Mahyera

    BETTER ROOF SUPPORT During the last decade, resin-grouted roof bolts have taken a substantial foothold in the coal mining industry - now accounting for about one-third of all bolts installed annual

    Jan 1, 1984

  • SME-ICGCM
    Considerations for Effective Ground Support in Evaporites

    By C. A. Vining, J. R. Nopola

    "Evaporites, such as salt and potash, pose unique problems to ground-support designs not encountered in other rock types. Evaporites are subject to continual creep and no amount of ground support can

    Jan 1, 2018

  • SME-ICGCM
    A Case History Investigation of Two Coal Bumps in the Southern Appalachian Coalfield

    By David Newman

    The Southern Appalachian coalfield has a long history of coal bumps that are attributable to a unique combination of topography, geology, and multiple seam mining. The high pillar stresses that genera

    Jan 1, 2002

  • SME-ICGCM
    Three Dimensional Numerical Modelling Of Effects Of Subsidence On Escarpments

    By Leigh J. Wardle

    Significant coal reserves in New South Wales lie under areas with steep topography such as valley slopes and cliffs. Subsidence predictions are difficult to make for these locations as existing empiri

    Jan 1, 1992

  • SME-ICGCM
    Elasto-Plastic Finite Element Structural Stability Analysis Of Room And Pillar Mine Workings (1726bb0c-5e63-4f04-a636-538432c37ec9)

    By S. Bensehamdi

    An advanced elasto-plastic finite element model adopting a modified Von Mises yielding criterion was used to simulate progressive failure of the rock strata surrounding a room and pillar mine structur

    Jan 1, 1992

  • SME-ICGCM
    Application of Yieldable and Cuttable Pump Crib in Longwall Recovery Room

    By Quanzhong Gu

    Stability of a pre-exnacted recovery room plays a vital role when longwall face approaches and during a longwall face move. In an attempt to extend the application of pumpable cribs into recovery room

    Jan 1, 2004

  • SME-ICGCM
    The Structural Response Of A Steel Lattice Transmission Tower To Mining-Related Ground Movements

    By Robert W. Bruhn

    A 125 foot high steel lattice frame tower supporting a 500 kV EHV transmission line and located over the gateroads of a longwall mining operation was subjected to ground movements from the mining of a

    Jan 1, 1990

  • SME-ICGCM
    Basic Procedures for Monitoring and Modeling Abandoned Underground Coal Mines for Safety Due to Uncontrolled Closures: Case Study of Verdinho Mine, Santa Catarina State, Brazil

    By Selmar A. Oliveira

    "Safe mine closure is an important step in the mining lifecycle. Plans for safe and efficient closure should begin at the inception of mining. Ideally, closure occurs when the reserve has been deplete

    Jan 1, 2017

  • SME-ICGCM
    Research on the rational structure of tensible rockbolt and the effect of surrounding rock reinforcement

    By Chao-jiong Hou

    The necessity of using tensible rockbolt in the roadway with soft rock, high in-situ stresses, mining influence and other complex conditions was discussed, the structures of three kinds of tonsibte ro

    Jan 1, 1989

  • SME-ICGCM
    A Methodology for Fault Pre-Consolidation prior to Longwall Retreat: A Case Study from Kestrel Coal

    By Dion Pastars

    Kestrel Coal has undertaken a surface-to-seam consolidation program of faulted ground prior to longwall retreat in the 304 panel. Micro fine cement is used to improve the rock mass quality and the

    Jan 1, 2007