Design, Implementation, and Commissioning of the Gibraltar Development Plan 3By S. A. H Tyrrell, R. Rotzinger
"Taseko Mines Limited recommenced operation of the Gibraltar copper-molybdenum mine in 2004 and embarked on series of development projects to modernize the mine and increase throughput capacity. The G
Jan 1, 2014
-
Continuing The Legacy: An Update On The Construction Of The New Second Avenue SubwayBy Jaidev Sankar
The dream of constructing the new Second Avenue Subway in New York has finally become reality as the first construction contract package is currently underway. This first contract requires the constru
-
Use of Enhanced Pre-Mixed Self-Hardening Grout for an Emergency Cut-Off Wall Intervention in West AfricaBy Maurizio Siepi, Bruno Vingiani, Claudio Asioli
"The article describes an emergency rehabilitation intervention executed at Buyo Dam, in Ivory Coast, to intercept a significant water seepage occurring through the foundation of this zoned earthfill
Jan 1, 2016
-
Virtual Environment Training for Preshift Inspections of Haul Trucks to Improve Mining SafetyBy D A. Bowman, S Schafrik
With the goal of reducing injuries and fatalities related to haul truck accidents, this research investigates technologies and intervention strategies for improving worker training using a virtual env
Jan 1, 2008
-
Ventilation On Demand - Study For Room And Pillar Mining In Flat SeamsBy S. Noll
Ventilation is an essential part of any underground mining operation. It provides fresh air for workers and machinery, keeps up an adequate mine climate and dilutes and dissipates noxious gases. Possi
Feb 27, 2013
-
Construction of Nine Shafts for the Manhattan Section of the New York City Water Tunnel No. 3By Yifan Ding, Shemek Oginski, Patrick Finn
The Manhattan section of the New York Water Tunnel No. 3 constructed by the Schiavone/Shea/Frontier-Kemper Joint Venture is a $668 million project. The contract includes a tunnel drive of 8.85 km (29,
Jan 1, 2007
-
Estimating N Value from Data in Press-In PilingBy Yukihiro Ishihara, Nanase Ogawa, Ming Lei
"Abstract In the Press-in Method, a static jacking force is used to install a prefabricated pile, while a reaction force is gained from previously installed piles. This piling technique has solved pro
Jan 1, 2014
-
Continuous Manufacture Of Coke In A Rotary Hearth FurnaceBy Josh B. Taggart
Some twenty to twenty-five years ago we saw the beginning of mechanization in our coal mines, It has now progressed to the point Chat as instruments of production the pick and shovel are things of the
Jan 1, 1962
-
Measurement And Analysis On The Bearing Behaviour And Driving Effects Of Piles In Shanghai RegionBy Gao Dazhao
This paper presents some research results of pile foundation performance. Measurements on the bearing behaviour and driving effects of piles have been carried out during pile testing and pile driving.
Jan 1, 1991
-
IC 9495 - Proceedings: New Technology For Ground Control In Multiple-Seam MiningMultiple-seam interactions are a major ground control hazard in many U.S. underground coal mines. In some U.S. coalfields, particularly in central Appalachia and the West, the majority of today’s mine
Jan 5, 2007
-
OFR-156-83 Diesel Engines In Underground Mining: A Bibliography With AbstractsBy Robert W. Waytulonis
This publication contains 1,000 citations of technical and semi-technical literature treating diesel-powered equipment usage underground both generally and specifically. These citations were gathered
Jan 1, 1983
-
Column Flotation: Theory and PracticeBy Yuliy Rubinstein
"The paper presents a analysis of the history and the trends of development of flotation apparatus. The laws of their evolution are stated and the place and role of column flotation are indicated. It
Jan 1, 2018
-
RI 3959 National Motor-Gasoline Survey, Winter 1945-46.By C. R. Sponsler, O. C. Blade
"INTRODUCTION This report on the properties of motor fuels sold through service stations in the United States is a continuation of a series of reports made in accordance with a cooperative agreement b
Jul 1, 1946
-
A Diesel Locomotive Underground at a Bituminous Mine in AlbertaBy J. A. Brusset
Introduction The West Canadian Collieries, Limited, operate three bituminous coal mines in the Crowsnest Pass district of Alberta. Two seams are worked; their thickness varies from 10 to 20 feet an
Jan 1, 1948
-
Raising the Simulator Training Bar - Strategies for Improved Work Performance and Effective Utilisation of Site-Based SimulatorsBy P Wood, S Leveritt
This paper will introduce some innovative strategies for simulator training that are intended to improve the level of safety and operational performance of heavy equipment operators. The key strategy
Sep 18, 2012
-
Simulation of integrated underground mining-processingThe paper examines the design issues associated with the integration of mineral processing within underground mining systems. It demonstrates conceptual integrated system design options appropriate to
Jan 1, 2003
-
Research on the Roof Advanced Breaking Position of Large Mining Height Working Face in Shallow Coal SeamFully mechanized longwall mining with large mining heights (LMHs) in shallow-depth thick coal seams has been widely applied in Shenfu coalfield, China. Dynamic loading and rib spalling is serious when
Jul 28, 2020
-
Beacon Hill Station Dewatering Wells and Jet Grouting ProgramBy Zephaniah Varley, Dominic Parmantier, Paul Schmall, Richard Martin, Red Robinson
Sequential excavation of the Beacon Hill Station has been accomplished in highly complex and inter-layered sand, silt, and clay soils with multiple perched groundwater tables. Successful excavation ha
Jan 1, 2007
-
Simulation Of Spontaneous Heating In Longwall Gob Area With A Bleederless Ventilation SystemBy A. C. Smith
Although only used in a few U.S. longwall mines, bleeder-less ventilation systems can be an effective spontaneous combustion control method in mines having a demonstrated history of spontaneous combus
Jan 1, 2008
-
Detachable Rock-Drill Bits At The Hollinger Mine (d2eccb3e-4d05-46d7-b3ca-b157bf91c7d6)By Aloys H. Wohlrab
THE conditions that govern the selection of a suitable type of detachable bit for the small, isolated mine, for rock work and tunnel contracting and for the large mine are quite dissimilar, therefore
Jan 1, 1942