Search Documents

  • AUSIMM
    Reverberatory Smelting Plant, Mount Morgan

    During the latter part of 1937 consideration was given to the construction of a; local smelting plant for producing blister copper. Previously copper concentrates had been shipped to the United States

    Jan 1, 1939

  • NIOSH
    RI 6217 Examination Of An Experimental Iron Blast Furnace After Quenching With Nitrogen

    By J. P. Morris

    An experimental blast furnace in normal operation was quenched by substituting cold nitrogen for the hot blast air. More than 2,200 samples from the stack, bosh, and hearth were taken; 500 of these we

    Jan 1, 1963

  • AUSIMM
    The Mineral Composition of the Black Star Copper Ore Body, Mount Isa, Queensland

    By Edwards A. B

    A suite of specimens from the newly developed Black Star copper ore body at Mount Isa was made available for mineragraphic study by the Mount Isa Mines, Ltd. The specimens were selected as representat

    Jan 1, 1945

  • NIOSH
    IC 7185 Inspection And Testing Of Mine-Type Electrical Equipment For Permissibility ? Introduction

    By L. C. IlsLey

    The theory and practice followed by the Bureau of ones in the investigation of electrical equipment4/ made for service in massy mines are of particular interest not only to manufacturers but also to t

    Jan 1, 1941

  • SAIMM
    Release Analysis of Coal Fines: Evolution of the Methodology and Critical Issues Involved

    By L. Sahu, S. Bhattacharya, S. Dey

    "An ideal procedure to determine the limits of flotation-based separation, as is the case with washability analysis for density separation, does not exist. Therefore, a procedure called release analys

    Jun 1, 2019

  • NIOSH
    OFR-52-81 Wallrock Reactions To Mining Beyond A Preconditioned Zone At The Star Mine, Burke, Idaho

    By Wilson Blake

    Rock preconditioning in advance of mining was shown to be an effective means of rock-burst control based on the results of a field demonstration carried out on the 7700 level of the Hecla Mining Compa

    Jan 1, 1980

  • SME
    Design and Construction of a Multiple-Drift Subway Underpinning Structure for Boston’s Central Artery/Tunnel Project

    By Robin B. Dill, Mark Pelletier, Daniel J. Dobbels, Subodh Bhaumik, Daniel J. VanRoosendaal

    Although primarily cut-and-cover excavations are required for replacement of the existing elevated I-93 interstate highway through the heart of Boston for the Central Artery/Tunnel (CA/T) project, som

    Jan 1, 2001

  • NIOSH
    RI 3344 Chloride Volatilization Of Lithium From Spodumene ? Introduction

    By Foster Fraas

    The most important lithium resource in the United States is in the form of the feldspathoid mineral spodumene. This mineral has not been used to any important extent as a source of lithium salts or li

    Jan 1, 1937

  • NIOSH
    RI 3344 Chloride Volatilization Of Lithium From Spodumene ? Introduction (639bd421-4f3d-4d15-8750-fb656a72e2a5)

    By Foster Fraas

    The most important lithium resource in the United States is in the form of the feldspathoid mineral spodumene. This mineral has not been used to any important extent as a source of lithium salts or li

    Jan 1, 1937

  • NIOSH
    RI 5901 Heats And Free Energies Of Formation Of Anhydrous Silicates ? Introduction And Summary

    By K. K. Kelley

    Thermodynamics data for silicates have applications in the fields of extractive metallurgy, ceramics, and geochemistry. To facilitate these applications, up-to-date tables of heats and free energies o

    Jan 1, 1962

  • AIME
    Health and Safety in Mines ? New Equipment Difficult to Obtain - Aluminum Therapy for Silicosis Notable

    By A. S. Richardson

    PROGRESS in health and safety in the mining field has been greatly affected by war conditions. Some of the instruments commonly used in ventilation and dust prevention work have been practically unobt

    Jan 1, 1945

  • ABM
    Detection And Resolution Of Adverse Melt Shop Conditions Through The Use Of The Graftech Architech System

    By Theodore James Kurela

    Analysis of adverse technical issues has traditionally relied on a snapshot of the state of the operation complemented with both the melt shop’s archived data and eyewitness accounts of adverse events

    Aug 17, 2017

  • IIMP
    Proyecto de optimización de procesos Geologia, planeamiento, mina y mantenimiento

    By José Porras

    El presente trabajo señala el proceso de optimización en la mina a través del área de Tecnología de la Información, superintendencias y las áreas directas de las operaciones. En ese sentido, durante e

    Sep 9, 2007

  • NIOSH
    Advanced Measurement Methods in Mining - Introduction

    By Dean H. Ambrose

    [Mining and processing earth's materials form the basic building blocks from which many technology advancements and products are made. Virtually all metallic and non- metallic products are deriv

    Jan 1, 2009

  • NIOSH
    IC 8442 Research And Technologic Work On Explosives, Explosions, And Flames - Fiscal Year 1968 ? Introduction

    The principal activities of the Bureau of Mines Explosives Research Center (now Safety Research Center) during fiscal year 1968 (July 1, 1967, to June 30, 1968) are reviewed in part 1. Part 2 presents

    Jan 1, 1970

  • AUSIMM
    Tube bundle integrity testing methodologies

    By L Forrester

    The tube bundle system is an integral part of an underground coalmine’s gas monitoring system. The maintenance of these systems is vital to ensure the quality of the data produced. Integrity testing o

    Aug 28, 2017

  • SAIMM
    Shaft Excavation Method In Soft Soil ? Synopsis

    By F. N. F. le Roux

    This paper describes the method used for excavating the upper 33m of emergency access shaft E2 for the underground single track tunnel running between Park and Rosebank station of the Gautrain Rapid R

    Jan 1, 2009

  • SAIMM
    Shaft Excavation Method In Soft Soil ? Synopsis (57c66dec-079b-41a9-bafc-ab363857a914)

    By F. N. F. le Roux

    This paper describes the method used for excavating the upper 33m of emergency access shaft E2 for the underground single track tunnel running between Park and Rosebank station of the Gautrain Rapid R

    Jan 1, 2009

  • ISEE
    Experiences with Electronic Delay Detonators in Major Production Blasts

    By Claude Cunningham

    Ths oonoept of precise. eooursts timing with Elsotronic Delay Detonators (EDD’s) was first ssriously sddresssd in ths mid 80’s end much wss made of the cheapness end profusion of digital wstohes in te

    Jan 1, 1994

  • AUSIMM
    Characteristics of the Tolukuma Au-Ag Deposit

    By McLeod RL

    The Tolukuma gold-silver prospect is located approximately 100km N of Port Moresby in the Central Province of Papua New Guinea (PNG). Epithermal "adularia-sericite" style mineralisation crops out

    Jan 1, 1991