Search Documents

  • CIM
    Commissioning and Operation of Milling Circuit at Santarita Nickel Operation

    The Santa Rita mine is located in north eastern part of Bahia in Brazil and is owned and operated by Mirabela Mineração do Brasil Ltda. Typical SABC circuit was designed as the preferred option for th

    Jan 1, 2012

  • AIME
    Standing Committees (3ae2691a-4da1-455a-8029-6f420bb27f3a)

    AIME 1953 DIRECTORY SUPPLEMENT COMMITTEES NOMINATING E. H. Rose, Chairman R. E. Byler J. F. Myers Grover Molt S. W. Engelmann S. J. Swainson EDUCATION A. C. Dorenfeld, Chairman G. P. Lutj

    Jan 1, 1953

  • NIOSH
    OFR-15(1)-82 Area Terrace Pit Coal Mining Systems - Volume 1 - Technical & Economic Evaluation Of Terrace Pit Mining Systems

    By Fred Leonard

    This report is principally concerned with the engineering and economic feasibility of area surface coal mining systems other than draglines. This analysis evaluates shovel/ trucks, shovel/crusher/conv

    Jan 1, 1980

  • AUSIMM
    The Relation of Ore-Occurrence to General Geology, Brocks Creek District Northern Territory, Australia

    The area (330 sq. miles) shown on the map of the Brocks Creek District (Fig. 1), was mapped by the Northern Territory geological party of the Aerial, Geological and Geophysical Survey of Northern Aust

    Jan 1, 1950

  • NIOSH
    OFR-113D-93 Coal Mine Injury Analysis: A Model For Reduction Through Training - Volume V: Mine Safety Management Case Studies

    By R. V. Ramani

    One area of study in the Coal Mine Injury Analysis project was to illustrate and enhance the ability o mine safety management personnel to apply analytical techniques to Injury experience data and to

    Jan 1, 1993

  • CIM
    Radon barriers for underground uranium mine use

    By James F. Archibald, H. Jame Hackwood

    "Research was performed to assess the feasibility of barrier membrane substances, for use within mining or associated high risk environments, in restricting the diffusion transport of radon gas. Speci

    Jan 1, 1987

  • TMS
    Metallurgical Considerations For Recycling Siliceous- Bearing Materials In The Mitsubishi Continuous Copper Converter

    By Fumito Tanaka

    The Mitsubishi Process is the sole pyrometallurgical process for the continuous production of blister copper from copper concentrates. Continuous converting originates from the application of the pro

    Jan 1, 2005

  • SME
    Open Pit Mine Production Scheduling with Stockpiling Using Constraint Programming

    By Biswajit Samanta, Rahul Kumar, Pranjal Pathak

    The Open Pit Mine Production Scheduling Problem (OPMPSP) is a complex optimization problem that seeks to determine the best sequence for extracting mineralized material from the ground in order to max

    Jun 25, 2023

  • NIOSH
    RI 7036 Molten-Salt Electrorefining Vanadium Scrap

    By K. P. V. Lei

    The Bureau of Mines investigated molten-salt electrorefining as a practical method for reclaiming vanadium from vanadium scrap. An electrolytic process utilizing a KC1-LiC1-VC12 electrolyte at 615° C

    Jan 1, 1967

  • NIOSH
    RI 7698 Optimizing Decomposition Of Carbonyl Sulfide In An Electrical Discharge

    By Larry A. Haas

    Carbonyl sulfide (COS) was decomposed to sulfur and CO in a silent electrical discharge. A threshold of about 4 kv at 60 Hz was required to dissociate the gas in a laboratory ozonizer at 790 torr with

    Jan 1, 1972

  • RMCMI
    The Myths and Realities of Fatigue in 24/7 Mining Operations

    By Circadian Technologies

    Alertness levels naturally fluctuate during the day and night Basic functions ??digestion, body temperature ? follow predictable 24-hour patterns Adjustment to night work creates health challenges

    Jan 1, 2010

  • SME
    Sound Transit Link Light Rail Northern Extension

    By Paul M. Godlewski, Joseph P. Gildner, David S. McAllister

    With construction underway on the 22.5 km (14 mile) Initial Segment of the Link Light Rail transit system in Seattle (including the one-mile EPB-driven running tunnels and mined station at Beacon Hill

    Jan 1, 2005

  • SAIMM
    Maximum height estimation for mine waste dumps

    By S. Chai

    Waste dumps are widely used to discharge stripped mine wastes in open pit mining methods. As mining progresses, the height of the waste dumps will increase gradually, which may induce sliding failure

    Oct 1, 2022

  • NIOSH
    OFR-68-76 Evaluation Of The Cadmium Disc Breakflash In Testing Electrical Circuits For Safety In Explosive Atmospheres - A Comprehensive Study Of Intrinsic Safety Criteria

    By Zsuzsanna Zborovszky

    Study of different parameters (minimum discharge voltage, minimum discharge current, wire electrode diameter, speed of separation, electrode materials, overlap of the electrodes, etc.), their direct e

    Jan 1, 1974

  • CIM
    Improving the Gold Gravity Performance: an Investigation into the Laboratory and Plant Gravity Recoveries

    By Sunil Koppalkar, Guillaume Noel, Ahmed Bouajila, Makni Sami, Claude Gagnon

    "Gold gravity recovery circuits utilizing enhanced gravity separators have become an integral part of many of the modern gold processing plants. Thus, efforts to improve the operating efficiency have

    Jan 1, 2011

  • NIOSH
    OFR-120-84 Development Of Foreign Economic Indices - Phase I For Philippines

    By Alice M. Chieruzzi

    This Country Documentation Report presents the development of economic indices for the Philippines for the period from 1970 through 1981. The work was done through the Bureau of Mines, Minerals Availa

    Jan 1, 1983

  • TMS
    Secondary Lead Blast Furnace Smelting at East Penn Manufacturing Co., Inc.

    By Kenneth N. Pike

    The need to comply with environmental regulations and increase production has resulted in modifications to the East Penn blast furnace operation. Changes made include furnace design modifications, clo

    Jan 1, 1990

  • AUSIMM
    Preliminary Investigations into the Characteristics and Potential Uses of the Ngakuru Zeolites

    The Ngakuru zeolites are located about 20 km south of Rotorua and comprise a number of deposits dispersed along several fault lines. Relatively recent volcanic activity (250,000 years ago) resulted in

    Jan 1, 2000

  • AIME
    Determining Optimal Mine Regulator Locations Using Computer Simulation

    By Jerry Tien

    Mine regulators are normally used for proper air distribution in underground mines. They are deliberately introduced resistance in the regulated airway, and by altering sizes, they can distribute spec

    Jan 1, 1983

  • AIME
    Trackless Mining Operation At Kamioka Mine

    By Hisaaki Takada, Atsushi Yoshida, Kazuo Satoh, Norikazu Nanko, Naoshichi Higashi

    Kamioka Mine of Mitsui Mining & Smelting Co., Ltd. is the largest lead-zinc mine in Japan and is composed of two mines, Tochibora Mine and Mozumi Mine, which have daily production rates of 5,200 metri

    Jan 1, 1977