Search Documents

  • SME
    Exploration Review

    By D. R. Wilburn

    This summary of international mineral exploration activities for the year 2007 draws upon available information from industry, literature and U.S. Geological Survey (USGS) specialists. The summary pr

    Jan 1, 2008

  • SME
    Seismic Response of Precast Tunnel Linings

    By J. Chai, H. H. Sedarat, Gary J. E. Kramer, A. Kozak

    Precast concrete segmental lining systems have been gaining widespread use in seismically active areas and a single-pass version of such a system has been developed for use on the Silicon Valley Rapid

    Jan 1, 2007

  • TMS
    Preliminary Investigation Of Fluid Mixing Chracteristics In Bath During Side And Top Combined Blowing AOD Refining Process Of Stainless Steel

    By Ji-He Wei

    Keywords: stainless steel, AOD refining, side and top combined blowing, mixing characteristics, water modeling The fluid mixing characteristics in the bath during the side and top combined blowin

    Jan 1, 2005

  • IOM3
    Thermodynamics and characterisation of K2TaF7 precipitated from fluoride solutions

    By F. T. Da Silva

    Concentrates of titaniferous minerals containing around 30 wt% Ta2O5 are processed hydrometallurgically by hydrofluoric acid leaching and solvent extraction, followed by the precipitation of hydrated

    Jun 21, 1905

  • SAIMM
    Effect of true tri-axial loading schemes on fracturing of limestone

    By J. -P. Tshibangu, A. Vervoort, A. Lavrov

    Abstract: The aim of the research presented is to study the effect of complex loading schemes on the fracturing process during loading and/or unloading. A first set of experiments was done using a pol

    Jan 1, 2003

  • AUSIMM
    The North Strathfield Rail Underpass – Driven Tunnel Design and Construction

    By E Nye and T Schroeter, B Muir, M Kitson, M Gonzalez, D Mares

    The single track North Strathfield Rail Underpass (NSRU) consists of a dive structure either end of a 148 m long driven tunnel skewed under three live railway tracks. The tunnel is 8 m high, 9 m wide,

    Sep 17, 2014

  • AUSIMM
    Mount Bischoff Extended Tin Mining Co., Waratah, Tasmania

    During August, 1926, with the consent of Mr. Schell, mine manager, the writer conducted a mill test on this company's concentrators. Mr. Schell not only gave him his permission, but rendered all

    Jan 1, 1928

  • NIOSH
    RI 5824 Particle-Size Reduction Of Coal By Attrition In A Tube ? Summary And Conclusions

    By J. L. Konchesky

    In gasifying pulverized coal with steam and oxygen, the particle size of the coal fed to a gasifier should be as small as economically possible. A potential way to achieve this advantage is to reduce

    Jan 1, 1961

  • AUSIMM
    Confidence Levels In Estimates

    Traditionally, capital costs of major resource development projects have been estimated as a single amount to which a percentage accuracy has been assigned based on the method of preparation of the es

    Jan 1, 1990

  • AIME
    Societies, Boards, Etc. on Which the Institute has Representation

    Societies, Boards, Etc , on Which Institute Has Representation United Engineering Society WILLIAM L SAUNDERS, President GEORGE H PEGRAM, 1st Vice-president ALFRED D FLINN, Secretary J V W REYNDER

    Jan 1, 1923

  • ISEE
    Evaluation of the Methods to Determine Constituents of Bulk Commercial Explosives used in the Mining Industry

    By Kush Patel, Gary Cavanough

    Mining operations consume over 2.5 Billion Australian dollars’ worth of bulk explosives annually (Richardson, 2018). Despite the large volume of product used, current practices only conduct a cup dens

  • AUSIMM
    Biological Sulfate Reduction with Primary Sewage Sludge in an Upflow Anaerobic Sludge Bed Reactor

    By G A. Ekama

    This paper describes a novel system for the biological sulfate reduction (BSR) of acid mine drainage (AMD) using primary sewage sludge (PSS) as carbon source in an upflow anaerobic sludge bed (UASB) r

    Jan 1, 2009

  • SME
    Metallogenic Characteristics Of The “Borska Reka” Porphyry Copper Deposit In The Bor Copper And Gold Deposit, East Serbia

    By D. Kozelj

    Introduction The porphyry copper deposit “Borska Reka” is the biggest undeveloped deposit in the Timok Magmatic Complex (TMC). Total reserve calculated manually is 611 Mt (cut-off grade 0.3% Cu) of 0

    Jan 1, 2007

  • NIOSH
    OFR-68(3)-81 An Annotated Bibliography Of Metal And Nonmetal Mine Fire Reports - Appendix - Introduction

    This appendix is composed of five sections, each of which is tabbed for ease of access. The sections are as follows: ? Fire incident report forms for underground mine fires. There is one form for eac

    Jan 1, 1980

  • AIME
    Heat Treatment Of Cast Steel

    By John Hall

    SOME months ago one of the authors was asked to write a paper on the heat treatment of steel castings that would be more comprehensive than other matter lie had published; this is an attempt to presen

    Jan 9, 1919

  • NIOSH
    IC 9215 Mine Ventilation Computer Code For Personal Computers

    By Daniel Ng

    The U.S. Bureau of Mines-Michigan Technological University mine ventilation mainframe program was successfully adapted for execution in a personal computer (PC). The hardware requirement can be as mod

    Jan 1, 1989

  • NIOSH
    RI 3467 Time Study Analyses - Progress Report 2. Quarry Haulage ? Introduction (b1819f11-2200-424e-85f9-435d0f0f54cd)

    By J. R. Thoenen

    In the summer of 1937 the authors began a series of time studies of the various processes employed in the production of crushed stone. These studies, made at quarries scattered over the eastern and so

    Jan 1, 1939

  • CIM
    Tailings dam failures need not be disasters — The Thickened Tailings Disposal (TTD) system

    By E. I. Robinsky

    "In light of the recurring spills and failures of conventional tailings disposal pond dams, a brief review of the Thickened Tailings Disposal (TTD) system is presented. It is shown that by the process

    Jan 1, 1999

  • NIOSH
    RI 3467 Time Study Analyses - Progress Report 2. Quarry Haulage - Introduction

    By J. R. Thoenen

    In the summer of 1937 the authors began a series of time studies of the various processes employed in the' production of crushed stone. These studies, made at quarries scattered over the eastern

    Jan 1, 1939

  • CIM
    Namew Lake Mill Project

    By K. Hoover, G. Labarre, S. Rantanen

    "As part of the Namew Lake project a mill was constructed to treat 1900 tpd of ore grading approximately 0.90% CU and 2.45% Ni to produce copper and nickel concentrates.Nickel occurs mainly as pentlan

    Jan 1, 1990