Search Documents
Search Again
Search Again
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Bluestone Dam Safety Assurance Program: An OPA Runner Up
By Jeff Hopple
"Bluestone Dam in Hinton, W.Va., along the New River, is owned and operated by the U.S. Army Corps of Engineers (USACE). Completed in 1949, the dam is 165 ft (50 m) tall, 2,048 ft (624 m) wide, and en
Jan 1, 2014
-
How Choice Of Foundation Can Alter The Fate Of A Bridge Project – 3 Case Studies
By Alok Bhowmick
The most uncertain and challenging part of a bridge design and construction is the ‘Choice of foundation’. During the planning and conceptual design stage, it is extremely important to choose the righ
Nov 1, 2022
-
Use Of High Capacity Grouted Tension Piles Installed Vibration Free And Soil Displacing
By Peter de Kort
Tunnels in urban areas generally require deep excavations in soils under the groundwater table. In The Netherlands uplift loads are generally taken by piles installed into dense sand layers, which are
Jan 1, 2008
-
Constructing Tsunami Walls with Pressed-In Sheet and Pipe Pile Combi-Walls
By Takefumi Takuma, Tsunenobu Nozaki, Masashi Nagano
The city of Naruto in the southwestern part of Japan is situated at the mouth of the mighty Yoshino River. An approximately 1,000m-long levee/bulkhead along one of the river’s tributaries in the city
Sep 8, 2021
-
New Wembley National Soccer Stadium, London Piled Foundations: Design, Construction and Logistics
By Max Gwynn, Tony Suckling
"The new Wembley Stadium is the most spectacular soccer stadium in the world, built to the highest specifications, using the latest technology and offering visitors an unrivalled match-day experience.
Jan 1, 2008
-
Construction of Cooling Water Intake Shafts for the Oak Creek Expansion Project, Oak Creek, Wisconsin
By Edward Jacobsen
The Oak Creek Power Plant in Oak Creek, Wisconsin is currently undertaking an expansion project. In order to supply cooling water to this facility, a 27' (8.2m) diameter tunnel will be bored, in
May 11, 2007
-
Deep Cfa Piles Application For Foundation In Queensland
By Sameh M. Khella
This paper discusses the application of deep CFA piles for the foundation of structures in different ground stratifications with a focus on the application in Queensland region. Design, construction t
Nov 1, 2022
-
Deep Mixing in the United States: Milestones in Evolution
By Donald A. Bruce
"The Deep Mixing Methods (DMM), in their current forms, have been employed in the United States since 1986, although an earlier version had seen service from 1954. The earlier developments were strong
Jan 1, 2015
-
Rock Socket Capacity Certification Using the Point Load Index Test
By Burt G. Look, David W. Lacey
"Certification of foundation capacity during the construction phase is often assessed by strength or weathering state descriptors based on visual observations. This case study used the Point Load Inde
Jan 1, 1900
-
Construction Methods and Quality Outcomes for Bored Cast-in-Situ Piles – A Review of Current Practice
By Jim Slatter, Ben Collingwood
"It is well known that the adoption of an appropriate construction methodology is critical to quality outcomes for bored piles (drilled shafts). Many case studies have been published documenting quali
Jan 1, 1900
-
-
General Reports - Session 1 - General Report- Deep Excavations "He Who Pays The Piper Calls The Tune"
By Tim Chapman
This general report considers what promoters of deep basement projects want from their teams and whether they get it often enough. Most large projects are based on complex financial models where the f
Jan 1, 2006
-
Deep Vibrocompactation By Stone Columns And Liquefaction Investigation
By P. Ventura
Reliability of the liquefaction analysis is based on data plotted as by piezocone, as by deep vibrocompactation monitored tests. The negative porewater pressure, re lated to hydrostatic value, recorde
Jan 1, 1989
-
-
Real Time Validation of Driven Cast In-Situ Piles
By Derek Egan
"Abstract Construction clients want their foundation solutions to be right first time, every time; but it is often the geotechnical contractor who carries the most risk in achieving this. Robust valid
Jan 1, 2014
-
The Use Of A Reverse Circulation Diaphragm Walling Technique To Form A Plastic Cut-Off Wall Around Sizewell B Power Station
By H. F. Cowie
Britain's first pressurised water reactor (PWR) Nuclear Power Station is now under construction at Sizewell on the Suffolk coast. A linear cut-off wall was proposed to ensure that the drawdown of
Jan 1, 1989
-
Current Pile Foundation Practice In Taiwan ? Synopsis
By Za-Chieh Moh
This paper presents a summary of the current pile foundation practice in Taiwan. Constructions of driven piles, drilled shafts, and barrette foundations are reviewed. This paper also briefly summarize
Jan 1, 1996
-
The Historical Evolution Of Piling And Deep Foundations And Prospects For The Future.
By W. G. K. Fleming
The general history of piling is traced up to the present time with regard to the evolution of methods and materials. The processes have been strongly influenced by developments in basic equipment and
Jan 1, 1999
-
-
Evaluating Excavation Support Systems To Protect Adjacent Structures (The 2010 Michael W. O?Neill Lecture)
By Richard J. Finno
This paper presents an overview of methods that can be used to predict damage to buildings as a result of excavation-induced ground movements and describes an adaptive management approach for predicti
Jan 1, 2010