Search Documents
Search Again
Search Again
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Pressure-Quantity Survey Techniques And Computerized Ventilation Simulation For Large Scale Room And Pillar Mines ? Introduction
By Steven P. Oman
Large room and pillar mines are characterized by numerous and widespread working places. Ventilation requirements are high since each panel employs men and equipment that work simultaneously in multip
Jan 1, 1983
-
Face dust levels at deep-cut underground coal mines - SME Transactions 2011
By J. F. Colinet, W. R. Reed, J. D. Potts
Dust surveys were conducted at six underground coal mines to determine if deep-cutting practices expose face workers to higher levels of respirable dust. The surveyed mines were able to successfully m
Jan 1, 2011
-
Unexpected Post-Excavation Damage to a 28"-Thick Segment Lining - Failure Mechanism and Rehabilitation Measures
By Jens Classen, Martino Gatti
"GENERAL PROJECT DATAThe Sparvo Tunnel is part of the “Variante di Valico” project, a new 65km (40mi) highway link between Bologna and Florence, designed to renew the existing A1 route which connects
Jan 1, 2016
-
New geological and geotechnical considerations within the Interoceanmetal exploration area
By Ivo Dreiseitl, Kondratenko. Anatoly
"The second prime area within the Interoceanmetal Joint Organization exploration area named H22 was delineated in 2013 with the goal to ensure sufficient nodule reserves for profitable mining operatio
Sep 1, 2014
-
Mine Evaluation and Investment Analysis
By Donald W. Gentry
This section deals with one of the most fascinating aspects of mining the evaluation of mine investment opportunities. Be-fore proceeding further, it is important to clarify the meaning of some fundam
Jan 1, 2008
-
Use Of Seismic Tomography In Mining
By D. F. Scott
Spokane Research Center personnel have been investigating the use of seismic tomography to monitor the behavior of a rock mass, detect hazardous ground conditions, and assess the mechanical integrity
Jan 1, 1997
-
Allflux® Separator/A New Way To Process Your Heavy Minerals
By P. Grotjohann
In processing heavy mineral sands, the low feed concentration and respective high value of the desired minerals require high capacity production and sharp classification/separation techniques to reduc
Jan 1, 1998
-
In-Situ Near-Infrared Internal Reflection Spectroscopy of Collector Adsorption Reactions Using Reactive Internal Reflection Elements
By J. J. Kellar
The near-infrared (NIR) (12,000-4,000 cm-1) region of the electromagnetic spectrum, between the mid-infrared and visible, has often been viewed by spectroscopists to be of limited utility. This is unf
Jan 1, 1990
-
Shiloh Church Molybdenum Deposit Polk County, Georgia ? Introduction
By Donald W. Foss
The Shiloh Church deposit is a very significant molybdenum occurrence in an ususual, perhaps unique, geologic environment. Work done to date indicate that several million tons of "ore" may be present,
Jan 1, 1983
-
Concentration of High-Sulfur Copper Ore Using a Three-Product Magnetic Flotation Column
By Rongdong Deng
A tower-like magnetic system comprising eight permanent magnets was installed at the center of a flotation column to separate chalcopyrite and pyrrhotite minerals. A cyclonic flotation was installed w
-
Rockburst Risk Management To Make Tunnel Construction Feasible In High Stress Environments, Codelco El Teniente - RASIM 2022
By Eduardo Rojas, Pedro Landeros
El Teniente Mine expansion plans are currently under development and construction stages through an integrated project strategy that will allow the continuity of future mining. The deepest sector corr
Apr 26, 2022
-
Use Of Percussion Drilling Information For Pit Slope Design
By D. C. Martin
Stability analysis and design of open pit slopes is generally based on an assessment of rock cores and rock exposures on surface or in underground workings. Until recently, core for such assessments h
Jan 1, 1990
-
Hydrologic Aspects Of Strip Mining In The Subbituminous Coal Fields Of Montana
By Wayne A. Van Voast
Many coal beds that will be mined in southeastern Montana are aquifers that provide essential local water supplies. Mine cuts along aquifer outcrops create almost imperceptible piezometric changes. Mo
Jan 1, 1978
-
Mitigation and evaluation of the impact of a sandstone channel on a longwall face
By Daniel W. H. Su
A nearly 305-m- (1,000-ft-) wide sandstone channel was projected to run through the mid panel area of a 457-m- (1,500-ft-) wide longwall panel in a southwestern Pennsylvania coal mine. This sandstone
Jun 1, 2013
-
A Mine Fire Recovery
By J. E. Urosek
In October, 1990, a fire started in a large underground coal mine in Western Pennsylvania. During fire-fighting activities, an explosion occurred and all personnel were evacuated. Safe re-entry into t
Jan 1, 1993
-
Mechanized Narrow Vein Cut-And-Fill Mining At Falconbridge's Deep Copper Project
By J. Fuchs
This paper describes the mechanized narrow vein cut-and-fill approach used for the Deep Copper orebody at Falconbridge Limited's Strathcona Mine. Strategies for achieving high productivity while
Jan 1, 1992
-
The Latest Design Criteria For A Small Copper Concentrator ? Introduction
By Arthur L. Raub
During the last decade, there haven't been any great innovations in the design features of a copper concentrator. What has worked well in the past continues to work well, so that major breakthrou
Jan 1, 1979
-
Lead Contamination At Old Smelter Sites In The West: The Socorro, New Mexico, Case History
By G. S. Austin
Soil next to an abandoned smelter near Socorro, New Mexico, has the highest Pb concentration in the clay-size fraction, although this fraction accounted for only 1 to 3 wt. % of the soil. The depth of
Jan 1, 1992
-
Bougainville Copper Concentrate Slurry Pumping System ? Introduction
By Robert D. Coale
This paper will describe the copper concentrate slurry pipeline and pumping system between the concentrator and the port at Bougainville Copper Ltd. The operations of Bougainville Copper Ltd. are loca
Jan 1, 1974
-
Design and Construction of Dulles Airport Tunnels
By Allan Sylvester, Paul E. Gabryszak, Diane R. Hirsch, David P. Field
With construction of the first phase of the Automated People Mover (APM) Tunnels nearing completion, this paper will address how knowledge from recent Tunnel Boring Machine (TBM) and New Austrian Tunn
Jan 1, 2007