Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Land Rehabilitation at Golden Cross, Eight Years After Mine Closure
By D Crequer
Land rehabilitation at Golden Cross is reviewed, 8 years after mine closure in 1997/98, from the perspectives of a Peer Reviewer (land rehabilitation) and a Regional Council Officer (Resource Consents
Jan 1, 2006
-
Removal of Horizontal Level Pillar by Means of Blast Hole Diamond Drilling at New Occidental Gold Mine, Cobar, N.S.W.
By Creelman C. A
The removal of a horizontal piIlar between Nos. 9 and 11 levels (1,116 feet from the collar of main shaft) was successfully carried out by blast hole drilling, and, to the best of the authors' kn
Jan 1, 1944
-
Notes on Lake Margaret Hydro-Electric Power Scheme.
LAKE MARGARET is situate high up on the West Coast Range of Tasmania, and lies in a roughly triangular valley formed by the ridge of Mount Sedgwick on the south, the ridge formed by Mounts Geikie and
Jan 1, 1915
-
Considering Geology in Drill and Blast Operations to Optimise Ore Body Value
By L Maw
New ZealandÆs largest gold producersÆ OceanaGold Macraes Mine is characterised by a large tonnage and relatively low grade operation. To survive in diminishing real gold prices, the operation must foc
Jan 1, 2005
-
Confidence in Resource Estimates - Beyond Classification
By C Moorhead
The classification of Mineral Resource estimates for reporting in accordance with the JORC Code is a statement of the Competent PersonÆs confidence in the estimate and an attempt to convey that confid
Jan 1, 2009
-
Presidential Address, 1959
A President, soon after he is appointed, sees looming ahead of him the Presidential Address; and in something approaching despair wonders what he can possibly talk about which might hold the interest
Jan 1, 1959
-
Image Processing of Central Volcanic Region Geophysics
By M A. Mongillo
Most geophysical and geochemical data collected during regional exploration programmes are in vector form (location, value), and have traditionally been presented and interpreted in a profile or conto
Jan 1, 1992
-
Improvements in the Mercury Abatement and Process Efficiency of Adsorption, Desorption and Regeneration Gold Processing Operations
By C Barton, B Randall, T Weldon, M Lefler
FLSmidth-Summit Valley Technologies has been a leader in gold processing equipment for nearly two decades. Over the past several years an extensive research and development effort has led to improveme
Jul 15, 2013
-
Hydrothermal Alteration in the Gladstone Hilliow-Suifidation Epithermal Area, Waihi, New Zealand
By J L. Mauk
Gladstone Hill, a volcanic-hosted low-sulfidation epithermal prospect in the Coromandel Peninsula, is less than 1 km from the world-class Martha Hill Au-Ag deposit. Gold-silver-bearing quartz veins oc
Jan 1, 2001
-
Good Delay Timing-Prerequisite of Efficient Bench Blasts
Variations in delay timing can have a marked influence on blasting effectiveness and, hence, on total production costs. In single-row bench blasts, delay firing is invariably more effective than simul
Jan 1, 1977
-
Past and Future Parameters for Mining the Otago Alluvial Gold Deposits
The early records of hydraulic elevator and bucket ladder dredging in the Clutha River system indicate the success of that era of alluvial gold mining in Otago. This paper briefly reviews parameters o
Jan 1, 1992
-
Pegmont: A Stratiform Lead-Zinc Deposit in the Precambrian of Northwest Queensland
Stratiform lead-zinc mineralization at the Pegmont prospect occurs as a 4-6 m thick body interbedded within arkose, schist, amphibolite, and pegmatite of the Kuridala Formation in the Eastern Belt of
Jan 1, 1977
-
Thermodynamics of Cobalt Oxide in Iron Silicate-Based Slags
By S Jahanshahi, D R. Swinbourne
The classical metal-slag-gas equilibrium technique was used to study the thermodynamic activity of cobalt, iron and their oxides in iron silicate based slags containing under controlled oxygen potenti
Jan 1, 2000
-
The Formation of Banded Epithermal Quartz Veins at the Golden Cross Mine, Waihi, New Zealand
By G B. Arehart, S J. Mathews, J L. Mauk
The banded nature of the quartz veins which form the Empire lode at the Golden Cross mine, is perhaps their most striking feature. Petrographic studies show that significant differences occur between
Jan 1, 1995
-
An Integrated Solution for Project Cost Control
Project cost control procedures and computer systems have enjoyed a successful and simple relationship over the past decade, thanks primarily to the proliferation of portable computers or PC's
Jan 1, 1990
-
Geotechnical Engineering at Ok Tedi - A Multidisciplinary Approach
By A P MACONOCHIE
The methods used and some of the results obtained from a major geotechnical study of the Ok Tedi mine area, Papua New Guinea, are described. The study was carried out at both regional and local scal
Jan 1, 1992
-
Geochemical Prospecting of the Bureau of Mineral Resources
Geochemical projects in progress or recently completed in the Bureau of Mineral Resources, Geology, and Geophysics (BMR) cover a wide range of topics and include research projects, regional studies, a
Jan 1, 1970
-
Project Evaluation – A Non-Executive Director’s Perspective
By R Knight
"In project evaluation there are two matters of keen interest to non-executive directors: the process by which an investment recommendation is reached, as well as the investment itself, as presented.
Mar 8, 2016
-
Paper No. 177. The Treatment of Sulphide Ores in Victoria.
FOR many years past it has been the practice at the Bairnsdale School of Mines to treat any parcels of auriferous concentrates sent in from the surrounding district by roasting them in a handworked re
Jan 1, 1909
-
Cyanide Measurement and Control for Complex Ores and Concentrates
By J A. Rumball
Measuring cyanide in the leach liquors associated with high copper and/or sulfide ores is a non-trivial exercise. It is well known that copper complexes with cyanide and reduces the amount of cyanide
Jan 1, 2007