Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Multi and Synchroblasting – maximising operational productivity

    By G Wyartt

    Systems such as Davey Bickford’s Daveytronic® SP blast initiation system and electronic detonators have been an integral part of drill and blast activities in Australia for over a decade, with th

    Jul 24, 2017

  • AUSIMM
    Coal Preparation Research at Turkish Coal Enterprises (TKI)

    Coal Preparation Research at Turkish Coal Enterprises (TKI)

    Sep 13, 2010

  • AUSIMM
    Wireframe-Free Geological Modelling – An Oxymoron or a Value Proposition?

    By E J. Cowan

    Efficiency demands that mine geologists devote the most time to tasks where they can have the biggest effect on production. One of the most time-consuming tasks is geological interpretation of the ore

    Aug 22, 2011

  • AUSIMM
    Solid Stabilisation of Soluble Mine Waste

    By C Ferron, R Massimi

    There is approximately 240 000 tonnes of arsenic trioxide dust stored in underground chambers at the Giant Mine in Yellowknife, Northwest Territories, Canada. To minimise the amount of arsenic release

    Jan 1, 2003

  • AUSIMM
    The Gold-Antimony Veins of Costerfield, Victoria

    THE township of Costerfield is situated in the parish of Costerfield, county of Dalhousie, and lies 6 miles east of Heathcote and 30 miles south-east of Bendigo. It is separated from Heathcote by the

    Jan 1, 1922

  • AUSIMM
    Modern mining – why bandwidth matters

    By D Kent

    "There has been a revolution occurring in underground mining over the last several years, where big headline items such as the Internet of Things (IoT), optimisation, managing data, data mining etc –

    Oct 16, 2017

  • AUSIMM
    Technology of Electrolytic Reduction of Alumina by the Hall-Heroult Process: V. The Formation of Chiolite by Reaction Between Molten Cryolite and Aluminium

    The reactions between molten aluminium and cryoIite have been determined from a material balance of all components involved in the process. The interpretation of results were supported by x-ray diffra

    Jan 1, 1968

  • AUSIMM
    Various Interpretations of Coal Petrographic Nomenclature and their Effects on Maceral Analyses

    The commonly used Stopes-Heerlen coal petrographic classification and nomenclature has over the years been subject to variable interpretations. This paper discusses the problem with specific reference

    Jan 1, 1970

  • AUSIMM
    Development of a slimhole downhole nuclear magnetic resonance tool for iron ore – some applications and limitations

    By T A. J Hopper, B J. Birt, K K. Trofimczyk

    Nuclear magnetic resonance (NMR) has been utilised in the oil and gas industry for over 60 years. The technology was recently identified as having potential value in iron ore, where latent bound moist

    Jul 24, 2017

  • AUSIMM
    Application of an Active Treatment System for the Reduction of Acidity and Dissolved Metals From Acid Sulfate Soil Drainage Waters

    By M D. Melville, B C. T Macdonald, J Dixon

    The acidic and metal rich waters that are generated from acid sulfate soil (ASS) drainage can have damaging impacts upon ecosystems. The most obvious impact has been the discolouration of water and oc

    Jan 1, 2003

  • AUSIMM
    Treatment of Gold-Bearing Oxide High-Clayish Ores

    Treatment of Gold-Bearing Oxide High-Clayish Ores The analysis of modern state of treatment technologies of gold-bearing oxide high-clayish ores showed that the main method applied both in Russia and

    Sep 13, 2010

  • AUSIMM
    The Washing of Queensland Coals

    Most mines in the Bundamba, North Ipswich, and Rosewood districts of the West Moreton coalfield of south eastern Queensland have installed washing plants during the last five years. Many problems were

    Jan 1, 1963

  • AUSIMM
    Ground support design of Northparkes E26 Lift 1 North block cave mine

    By Z Li, A Fleming, S Webster, L Snyman

    Northparkes Mines is developing the E26 Lift 1 North block cave mine, which is adjoined to the existing E26 cave. This paper presents the challenges and methods used to design the ground support syste

    Mar 15, 2021

  • AUSIMM
    The Karangahake Gold-Silver Deposit

    The Karangahake gold-silver deposit is located 11 km west of Waihi in the southern part of the Hauraki Goldfield. Historically it was the second largest bullion producer in the goldfield with a past p

    Jan 1, 1987

  • AUSIMM
    Determination of Combustible Volatile Matter in Coal Mine Roadway Dusts by Backscatter of X-Rays from a Radioisotope Source

    By Fookes R. A, Bunch K, Gravitis V. L, Watt J. S

    The combustible volatile matter in coal mine roadway dusts (CVM) has been determined using x-ray backscatter techniques. The correlation between x-ray and chemical techniques is reasonably good for th

    Jan 1, 1977

  • AUSIMM
    Precharging in previously preconditioned ground

    By E Hawkins, S Sheldon

    Block caving is becoming a more widely adopted mining method allowing for underground massive low grade orebodies to be extracted economically. Underbreak during cave propagation is difficult to predi

    Mar 15, 2021

  • AUSIMM
    Calcium based ternary nitrate salts for concentrating solar power applications

    By V Shrotri L Muhmood, P Gandhre

    The current work deals with the measurement of some thermophysical properties of Ca(NO3)2 based ternary nitrate molten salts as HTF (heat transfer fluid) / TES (Thermal Energy Storage) material for CS

    Jun 19, 2024

  • AUSIMM
    The Development of a Robust Sampling Strategy and Protocol in Underground Gold Mines

    The development of a robust belt sampling strategy and protocol inunderground gold mines is a fundamental requirement for effective grade quality control, ore accounting and mine-mill reconciliations.

    Jan 1, 1999

  • AUSIMM
    Underground Ore Handling Systems

    By B Olsson, C Glassock

    Computer simulation modelling (discrete event) has been used at Olympic Dam (OD) to model the handling of ore from the point of extraction at the stope drawpoint through to the ore stockpile on the su

    Jan 1, 2005

  • AUSIMM
    Minimising the Total Cost of Horizontal Development with Burn Cut Blast Rounds

    The total cost of horizontal development can be minimised by optimising the cost of each of the component operations (eg drilling, blasting, etc). Component costs should not be minimised. To optimise

    Jan 1, 1998