Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Electrochemical Behaviour of Massive Chaclopyrite Bioleached Electrodes in Presence of Acidithiobacillus ferrooxidans and Acidithiobacillus caldus

    Electrochemical Behaviour of Massive Chaclopyrite Bioleached Electrodes in Presence of Acidithiobacillus ferrooxidans and Acidithiobacillus caldus In this work, the monitoring of bacterial and chemic

    Sep 13, 2010

  • AUSIMM
    Field Measurement of Transient Pore Pressures within Co-disposed Processing Rejects Placed in a Spoil Dump

    By R Van Laeren, G Langerak, S Fityus, K Koosmen

    Co-disposal of partly-dewatered mixed-plant rejects (MPR) from coal processing into spoil dumps is gaining favour amongst Australian coalmine operators in preference to conventional tailings disposal

    Jul 27, 2015

  • AUSIMM
    Thermal Modelling and Mitigation Measures for the Bogong Power Development

    By D Wimpenny

    The Bogong Power Development Project in Victoria, Australia involved the construction of a 15 m long mass concrete plug up to 9 m in diameter within the head race tunnel. The plug is critical to thepe

    Mar 8, 2011

  • AUSIMM
    Updraught Sintering

    By Green A. D M

    The establishment of the Imperial Smelting Furnace at Sulphide Coporation Pty. Limited for the smelting of zinc and lead made it necessary to design and install sintering capacity to produce approxima

    Jan 1, 1964

  • AUSIMM
    Grasberg Block Cave Haulage Project – Design and Construction Update

    By B Mead, N D. Pascoe

    The Grasberg block cave rail haulage system will be located in the Grasberg mining district on the island of Papua, Indonesia at an elevation of almost 3000 m above sea level. It will transport 160 00

    May 9, 2016

  • AUSIMM
    Loading Mechanics of the æCanÆ and Implications for Improved Strength and Stiffness Properties

    Improved roof control in high deformation tailgate environments has been achieved over the last decade through development of stiffer and increased capacity standing support products. æThe CanÆ is one

    Jan 1, 2005

  • AUSIMM
    Roof characterisation for hazard planning at Oaky North mine using geophysical data

    By B Vorster, T Medhurst, A Huey

    Roof conditions at Oaky North Mine can be prone to stress related damage and/or time dependent degradation. The ability to identify these areas prior to mining has proved challenging using traditional

    Nov 29, 2022

  • AUSIMM
    An Integrated Approach to Proactive Tailings Management

    By T Huynh, K Tungpalan, E Wightman, M Edraki, S Palaniandy

    Most preventive environmental management practices promote proactive integrated approaches to waste management. For example, life cycle assessment is often used to find the ‘hot spots’ of environmenta

    Jul 27, 2015

  • AUSIMM
    The Marvel Loch Crusher Product Sampling System

    The Marvel Loch Operations (MLO) plant was treating ores from up to six MLO sources and in addition needed to blend externally sourced ores with its own ores. This presented a metallurgical accounting

    Mar 1, 2010

  • AUSIMM
    Bentonite and Fuller's Earth Deposits of New South Wales: I. Occurrence, Mineralogy and Physical Properties

    By See G. T

    Bentonites and fuller's earths from seven localities in N.S.W. have been analysed with respect to occurrence, mineralogy and physical properties and areas for future prospecting have been indicat

    Jan 1, 1959

  • AUSIMM
    Water Quality Compliance Monitoring at Macraes Gold Mine: A New Perspective

    Planning for the Macraes Extension project highlighted the need for additional tailings storage availability. The possible solution of developing new tailings impoundments in Northern Gully, in tum, l

    Jan 1, 1993

  • AUSIMM
    Go with the flow – managing hydrogeological staff turnover at Ernest Henry mine

    By C Hawtin, B Miller, D Ashton

    Ernest Henry mine (EHM) is an Iron oxide copper-gold sublevel cave mine located 30 minutes north of Cloncurry in North-West Queensland. The underground mine lies beneath open pit excavations, which we

    Sep 20, 2017

  • AUSIMM
    Design of mine workings under surface waters in New South Wales

    By Laxaminarayan Holla

    Significant coal reserves in New South Wales lie underneath major bodies of natural and stored surface waters. In order that mining can occur safely and without any adverse effect on the surface, vari

    Jan 1, 1987

  • AUSIMM
    The importance of rate of rise in life-of-mine planning of an upstream raised tailings storage facility – a case study

    By D A. Williams, P J. Chapman

    The acceptable rate of rise of the tailings beaches on upstream-raised tailings storage facilities (TSFs) is critical to life of mine planning. This is illustrated through a case study in Western Aus

    Jul 23, 2018

  • AUSIMM
    Closure Cost Estimation - All Things to All Men?

    By H Jones

    Closure cost estimates may be generated at any stage of a mining operationÆs life; commencing with the initial prefeasibility studies and continuing through to the final decommissioning cost estimates

    Nov 20, 2012

  • AUSIMM
    Comparison of Min/Max Autocorrelation Factors, Kriging, Co-kriging and Inverse Distance Block Totals – A Magnetite Hematite Case Study

    By D Kentwell

    For deposits where a full assay suite of elements/oxides is available and where several variables are critical to the evaluation of the deposit, it is desirable for the estimated block values of all e

    Jul 13, 2015

  • AUSIMM
    The Golden Mile – 125 years of mining and the challenges posed for today’s mine geologist

    By M Watson, A V. Engelbrecht, E Murray-Hayden

    Whereas mine reconciliation is a well-established month-end process for most modern mining operations, the resource sector has yet to endorse uniform reporting factors against which model accuracy and

    Mar 22, 2022

  • AUSIMM
    Computer Assisted Ore Reserve Calculations at Western Mining Corporation Ltd's Kambalda Nickel Operations

    By Reichman J. P

    Extensive use is made of a small scale computer (IBM 1130), in the calculations of ore reserves for Western Mining Corporation's nickel mine at Kambalda, W.A. All surface drilling data such a

    Jan 1, 1973

  • AUSIMM
    Ore Ageing Test Work for the Ok Tedi Skarns

    By M Morey

    Ok Tedi Mine is located eighteen kilometers from the Irian Jaya border in the Star Mountains, Western Province, Papua New Guinea. Sequential flotation concentrators produce a copper / gold concentrate

    Aug 8, 2011

  • AUSIMM
    Geometallurgy applied to small-scale mining: a case study

    By D Lozada, A Salazar

    Geometallurgy is a tool that, for more than a century, has been present in the implicit operations of mineral beneficiation. There’s a need to understand the characteristics of the material to be proc

    Aug 29, 2018