Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Optimising the operation of paste thickening at the Yara Siilinjärvi Plant
By E Ruhanen, S Kauvosaari, M Kosonen, C Meintjes
The Yara Siilinjärvi plant is located in the central part of Finland. Siilinjärvi is Western Europe's only apatite mine and annually it produces 1 Mt of apatite concentrate, which create
Aug 29, 2018
-
New Methods for Quantifying Geology and Geological Engineering Risk in Large-Scale Deep Tunnelling – Both in Design and in the Build Phase
By D FitzGerald
A critical component of any new tunnel design in a complex geological setting is the development of an integrated three-dimensional (3D) geology model with a full set of geotechnical properties of the
Mar 8, 2011
-
Slope stability is a critical issue for the open pit mining community
By M Edgar, G Pattemore, M Auad, K Job, A Job, S Gale
In recent decades, significant advances have improved the modelling techniques for predicting slope failure. Predicting failures is vital in open pit mining due to the significant risk posed to person
Jun 22, 2022
-
Petrology of the Broken Hill Lode and its Bearing on Ore Genesis
LIST OF CONTENTSAbstractIntroductionSelected Sections of the Broken Hill LodeLocality PlansPetrology1. Zinc Corporation Mine: DDH. 5.98, section 30, No. 26 level2. Zinc Corporation Mine: DDH. 838, sec
Jan 1, 1959
-
Propagation of the South Wedge - Drill and Blast
By R Cunningham, P Duniam
Late in 2005 it became apparent that cave propagation at the Northparkes Mine was not progressing as planned. By mid-2006 sufficient Reserves were identified to warrant an extensive drill and blast pr
Jan 1, 2007
-
A novel innovation for reconciliation
By J R. Ruiseco, D La Rosa, L Julian, W Hunt
The DeGrussa copper-gold deposit is located 900 km North of Perth. Copper-gold bearing massive sulfide lenses occur in lower greenschist facies meta-sedimentary and mafic volcanics of the Bryah Basin.
Mar 22, 2022
-
Design and Operation of Gunpowder Copper Ltd's In Situ Leach-SX-EW Process
The Mammoth Mine is located some five kilometres from the town of Gunpowder which is approximately 120 km north-west of Mount Isa in Queensland.
Jan 1, 1993
-
Optimising Project Value and Robustness
By W Stange, N Hanson
An important aspect of the project evaluation process is the achievement of a clear and quantitative understanding of the primary drivers influencing project value and risk. A business scenario-based
Jan 1, 2007
-
Dynamic Interpolation – Estimation in a Folded Environment at the Cosmo Deposit, Northern Territory, Australia
By A Finch, C Pridmore
The Cosmo Project falls within the Archaean to Palaeo-Proterozoic Pine Creek Orogen, one of the major mineral provinces of Australia.The Cosmo Deposit is interpreted to be a series of steep north-west
Aug 18, 2014
-
Integration of a Microseismic Monitoring System in Mining the Pasminco Broken Hill Southern Cross Area
By K P. Tully
In August 1996 a Microseismic Monitoring System developed by ISS International Limited was installed at the Pasminco Broken Hill Mine -Southern Cross area. The project aims were to:Assist in daily saf
Jan 1, 1998
-
In situ dynamic testing of mesh straps and W-straps
By P Mikula, B Darlington, J Graham, P Young
In underground mines experiencing dynamic events, there is an ever-present challenge to design and maintain a capable ground support system. One key component of ground support systems is surface supp
Nov 29, 2022
-
Evaluating All the Alternatives to Select the Best Project Strategy
It is well known that the ability to influence project value reduces significantly as planning progresses and decisions regarding project parameters are made. However, at the prefeasibility stage in p
Jan 1, 2007
-
Sensors and Systems for the Measurement of Tunnel Movements During and After Construction
By W Ward, J Clegg, R Barnes, T Zhong
This paper provides an overview of methods for measuring tunnel deflection and construction’s effects on the surrounding environment during and post construction. It will also review illustrative case
Sep 17, 2014
-
Methods and Apparatus for the Determination of Dust Suspended in Air
By Read T. A
PART 1The quantity of dust present and the methods used for suppression of dust in metalliferous mines has, in recent years, received considerable attention from mining engmeers in various parts of th
Jan 1, 1922
-
Phosphorus association with goethite – effects of Fe(II)-catalysed recrystallisation
By M I. Pownceby, N Karimian, A Frierdich
These may be found with goethite through mechanisms including direct substitution or coprecipitation of nanocrystalline phases. Understanding P incorporation in goethite has significant implications f
Sep 18, 2023
-
Adsorption and Desorption Technique in Predicting Outburst of Gas and Coal (Coal Mines Symposium September. 1980)
The paper describes the studies conducted to date on the short term adsorption/desorption of gases in coal from the point of view of developing techniques to predict imminent outbursting condition
Jan 1, 1980
-
Geometallurgical Modelling Techniques Applicable to Prefeasibility Projects – La Colosa Case Study
By P A. Montoya
La Colosa is a world-class porphyry Au project located in Colombia, currently undergoing prefeasibility analysis. As part of collaboration between AngloGold Ashanti and the AMIRA P843A GeMIII Project,
Sep 5, 2011
-
Geostatistical analyses of cone penetration testing data of a tailings storage facility in a semi‐arid setting
By P Chapman, B Moosapoor
The objective of this paper is to present the potential applications of geostatistical analyses in planning CPTu investigations, as well as interpolation of CPTu data. The paper presents a case study
Jul 1, 2021
-
Proactive Measures for Fatality Prevention in the Mining Industry ù Why Fatalities Persist While Lost Time Injuries Decline
The traditional measure of Lost Time Injury Frequency Rate (LTIFR) as a measure of improvement in safety performance is recognised as inadequate and misleading, lulling managers into believing that sa
Jan 1, 2003
-
Remote Mining in the Canadian Arctic - The Falconbridge Limited Raglan Experience
In February 1995, Falconbridge Limited approved the construction of a nickel mining and milling facility on its Raglan property situated in the Nunavik region of northern Quebec, Canada. The construct
Jan 1, 1998