Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Fingerprinting and Signatures - Tracing Mine Impacts in Complex Aquatic SystemsBy C Bonini, A Markham, P Whittle, B Pearson
"Mine-derived sedimentation in rivers can have significant impacts on the processes and features of the receiving environment and impact on communities reliant on this environment. However, identifyin
Nov 26, 2013
-
Queensland Mines Plant Trials with Caro's AcidBy Ring R. J, Waters D. J, Vautier F. E, Fulton E. J
Laboratory leach tests have been carried out by the Australian Atomic Energy Commission to compare the effectiveness of Caro's acid (permonosulphuric acid) as an alternative oxidant to pyrolusite
Jan 1, 1983
-
Ultra-High-Intensity Blasting - A New Paradigm in MiningBy G F. Brent, S Hawke, M Rothery, P Dare-Bryan
Mine-to-mill studies have previously demonstrated downstream productivity benefits from relatively modest increases in blast energy, or powder factor. These increases have up to now been limited by sa
Sep 26, 2013
-
Managing the Closure and Reopening of the South Ramp at Telfer Gold Mine During Sublevel Cave Breakthrough into the Open PitThe Newcrest Mining Limited Telfer Gold Mine consists of an underground sublevel cave (SLC) operation located 734 m directly below active open pit operations. Open pit and underground current producti
Nov 25, 2010
-
Managing Expectations – From Buyer Beware to Buyer Be AwareBy P J. Fairfield
"This paper reflects on the author’s experiences in undertaking mining studies and reviewing mining projects and technical reports, particularly over the past five years, and the impact of recent chan
Mar 8, 2016
-
The Physical Chemistry of Carbothermic Reduction of Sulphide Minerals: 'A Novel Metal Production Route'By Grieveson P, Terry B. S
Carbothermic reduction of sulphide minerals for achieving a selective separation of metallic species from complex minerals has been discussed by considering the prevailing oxygen potential during th
Jan 1, 1992
-
Northparkes Mines - New Performance Benchmarks for Underground MiningFor more than 15 years after the Northparkes orebodies were first discovered in 1976, the project was delayed by the need to find an economic way of mining the low-grade E26 deposit. The decision to
Jan 1, 1997
-
Interactive Modelling and Visualisation of Large Deposits Using Linear OctreesLarge deposits present computational challenges to todayÆs commercial orebody modelling systems that are based on conventional block models. We describe a system that is specifically engineered to mod
Sep 26, 2011
-
Application of a reinforcement learning AI solution for optimisation of screening shuttles controlBy A Horeth, E Duggan, B Versiani, A Gooch
Iron ore screening plant productivity is strongly affected by the performance of the shuttle operation, with the control system robustness and associated strategies having a direct impact on utilisati
Nov 8, 2021
-
Optimum Dig Lines for Open Pit Grade ControlBy I Treloar, T Elenbaas, E Isaaks
Critical reviews of grade control generally focus on blasthole sampling and the estimation of ore control block model (OCM) grades, with little or no attention given to dig-line design. For example, t
Aug 18, 2014
-
Determining the Deportment of Minor and Trace Elements in Base Metal Concentrates, with an Example from Broken HillBy F Radke, P A. Tilyard
Determination of the mineralogical location (deportment) of minor and trace elements (including credit and penalty elements) in base metal concentrates can indicate whether further processing is likel
Jan 1, 1998
-
Is the Python Right for Me? PythonGekko Systems Pty Ltd have developed the Python Underground Processing Plant for the concentration of gold and sulfide ores. The Python plant has an established flow sheet including fine crushing, scr
Aug 1, 2010
-
The Impact of Residence Time on Copper Recovery in Telfer Gold MineÆs Cyanide Recycling ProcessBy P Breuer, A Simons
The sulfidisation, acidification, recycle and thickening (SART) process is currently being used at NewcrestÆs Telfer Gold Mine to recover cyanide and copper from the cyanidation tails of the pyrite co
Sep 26, 2013
-
Contemporary Criteria of Open Pit Long-Term Production SchedulingProduction scheduling of open pit mining is a key area as it deals with the management of operating cash flows of mining companies. The efficiency of long-term schedules is usually assessed with econo
Sep 26, 2011
-
A novel approach to evaluating gravity pre-concentration amenability utilising the hydrodynamics of dense liquids in inclined channelsBy J Zhou, T D. McGrath, K P. Galvin, C P. Lowes, J J. Eksteen
Pre-concentration of low grade ores can improve the economic and environmental sustainability of an operation significantly, with opportunities for implementation ranging from run-of-mine to mill disc
Nov 10, 2020
-
Hellyer tailings – complex mineralogy but higher grade than many ore bodiesBy M Barden, G Lane, B Quilliam
NQ Minerals PLC, through Hellyer Gold Mines Pty Ltd, plans to reprocess the contents of the Hellyer tailings dam to produce lead/silver concentrate, zinc concentrate and pyrite concentrate (containing
Nov 21, 2018
-
Hydroseparation Concentrates and Automated Precious Metal Searches Used to Characterise Process Products from Selected MinesBy R Lastra, Y Choi, C Hamilton, P Kondos
Hydroseparation (http://www.cnt-mc.com) was used to concentrate sized fractions (from <38 ¦m to 150 ¦m) of various ore products ahead of carbon-in-pulp (CIP)-treatment. The resulting size-by-size c
Jan 1, 2008
-
MineSense technology empowering bucket resolution Mine to Mill reconciliationBy M Haest, S Sandler, R Botha, H Lang, K Hume
Benchmark practices in the mining industry include the establishment of Quality Programs — Quality Assurance and Quality Control (QAQC) — to monitor the correct execution of sampling protocols and con
Mar 22, 2022
-
Evaluation of Mineral Processing Effectiveness and Causes of Mineral LossesBy Siwiec A
The laboratory investigations which are necessary to evaluate the mineral processing effectiveness usually include density separation of narrow size fraction of the feed and one of the products. In
Jan 1, 1993
-
Unlocking value chain optimisation with a digital mining systemBy S Gulati, N Sarkar, T Vink, S Battersby, L Okada
This paper examines a successful project implemented by BHP Mitsubishi Alliance (BMA) and the Polymathian team at Deswik, aimed at enhancing short-term scheduling processes to reduce vessel turn times
Sep 1, 2024