Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Integrated Planning of Geotechnical Investigations for New Mining Projects

    By Rosengren KJ

    Geotechnical conditions often have a critical influence on the design of new open pit and underground mines, but they are often considered of secondary importance in relation to other factors, suc

    Jan 1, 1986

  • AUSIMM
    The Imperial Smelting Furnace - Operations with Increased Tuyere Angle

    By Potter DJ, Firkin GR

    The Imperial Smelting Furnace operated by Sulphide Corporation Pty. Limited at its Cockle Creek zinc-lead smelter was recently equipped with tuyeres angled at 25 degrees instead of the usual 10 de

    Jan 1, 1981

  • AUSIMM
    Geology and Resource Estimation at the Panguna Porphry Copper/Gold Mine Papua New Guinea

    Daily geological mapping of the Panguna porphyry copper/gold system since mining began in 1971 has provided a good basis for resource estimation and mine planning as the mine and estimation methods

    Jan 1, 1987

  • AUSIMM
    Development of Blast Furnace Slag as an Aggregate on Road Surfacing

    By Simpson JF, Murrie SJ

    In determining new areas for slag disposal a foamed slag aggregate has been developed for use as a skid resistant material. The foaming of the slag does not rely on the use of water, but rather on

    Jan 1, 1979

  • AUSIMM
    Social Responsibility and Obligations to Indigenous Populations

    By Taylor MN

    The influx of an industrial environment into or adjacent to the indigenous society has in the past frequently caused the breakdown of traditional be- haviour and culture, and the generation of socia

    Jan 1, 1978

  • AUSIMM
    Fatigue Resistant Design and Repair of Dynamically Loaded Structures

    By Scales PJ

    Fatigue is the primary cause of failure of structural and mechanical components subject to dynamic loading. Recognition of this basic fact and the development of appropriate techniques and details

    Jan 1, 1982

  • AUSIMM
    Mineralogy and Geology of the Serpentinite Associated Hitura Ni-Cu Deposit, Finland: Implications for Benefication

    By Penttila V

    The Paleoproterozoic Hitura Ni-Cu deposit in western Finland is in an ultramafic igneous complex composed of two subvertical plug-shaped bodies embedded in intensely migmatised felsic gneisses. The

    Jan 1, 1996

  • AUSIMM
    Effect of Tectonic Stress on the Stability of Slopes

    By Wu Y. H, Lu J. P

    Slope stability has now become a practical tool in the design and oper- ation of open pits. The stability of rock slope depends on many factors, including not only structural geology, the existence o

    Jan 1, 1989

  • AUSIMM
    The Wafi River High Sulphur Epithermal Gold Deposit, Papua New Guinea

    By Erceg MM

    The Waft River gold deposit is hosted by low grade metasediments which have been intruded by a dacite/andesite porphyry complex. Wafi River is classified as a high sulphur, epithermal type gold deposi

    Jan 1, 1990

  • AUSIMM
    An Investigation into a Water Inflow at Wongawilli Colliery, Southern Coalfield, New South Wales

    By Poole GR

    An unusually high flow of water from an oxtr.iction panel in Wongawilli Colliery pr,;npted the investigation of the possible sources of the water. It is more probable that water is derived f r,m s

    Jan 1, 1986

  • AUSIMM
    Risk Management of a Gold Heap Leach Project

    One of the biggest drawbacks of deciding upon a heap leach method of treating gold ore is the risk associated with the full-scale production heaps not performing as predicted by the testwork. This p

    Jan 1, 1994

  • AUSIMM
    OMEN - An Approach to the Optimisation of Methane Drainage Systems

    By Schofield D, Denby B, Stout F, Moli A

    This paper documents the development of a user-friendly computational program, which has been constructed to assist the mine ventilation engineer in the optimal design and operation of methane drain

    Jan 1, 1995

  • AUSIMM
    Ravenswood Gold Mine, an Experience of Rapid Exploration, Development and Production

    By Palmer G, Dennis R, Clark A

    The Ravenswood Mine in North Queensland is the first gold mine developed by Carpentaria Gold Pty Ltd, a wholly owned subsidiary of MIM Holdings Ltd. Carpentaria Exploration Pty Ltd began exploratio

    Jan 1, 1989

  • AUSIMM
    The Derivation of Thermodynamic Properties of Slags from Slag Fuming Plant Data

    A Kellogg type computer model of the slag fuming process is applied in reverse to derive some thermodynamic properties of components in lead blast furnace slag. At 1200¦C, the average activity coe

    Jan 1, 1980

  • AUSIMM
    Ore Reserve Systems-Principles and Practice

    By Gooday PE, Brech GE

    Ore reserve categories used by Pancontinental Mining fall into one of three fundamental groupings: Geological In Situ Reserves Mining Reserves Production Estimates The first of these describes the

    Jan 1, 1987

  • AUSIMM
    Trigger Release Mechanism for Release of Mine Water to Magela Creek

    By McGill RA

    The Ranger Uranium Mine is surrounded by a World Heritage National Park. The strict environmental controls under which the mine operates are based on scientific and social requirements. Release of n

    Jan 1, 1988

  • AUSIMM
    Paper No. 193. Filter-Pressing.

    THE filter-press, which has done so much for the successful-treatment of the sulpho-telluride ores of Kalgoorlie, has a serious rival in the vacuum process, and this paper is written with a view to ar

    Jan 1, 1911

  • AUSIMM
    Thermodynamics of Liquid Cobalt-Gold Alloys

    By Toguri JM

    A solid electrolyte technique has been used to measure the activity of cobalt in liquid cobalt-gold alloys containing between 0.085 and 0.50 mole fraction of cobalt, and for temperatures from just

    Jan 1, 1984

  • AUSIMM
    Geotechnical Factors Contributing to Stockpile Slope Stability

    By Patridge A. C

    Observations of coal stockpiles subject to unusual levels of instability showed that the particular coals exhibited 'gap grading', a relative lack of intermediate size particles. This led

    Jan 1, 1995

  • AUSIMM
    Geological Modelling and Grade Control in a Narrow Vein, High-Grade Gold Mine

    The Vera Nancy orebodies, although simple in overall geometry, are in detail generally narrow, multi-veined and fluctuating in width, strike and dip. Tight geological control is required to optimise g

    Jan 1, 2000