Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Blast Design Optimization to Minimize Induced Vibrations of Structures

    By Kavetsky A, Scott A

    As well as breaking and moving rock, blast energy sets up a seismic wave in the ground which can cause significant damage to rock structures and buildings and disturbance to human occupants. This se

    Jan 1, 1990

  • AUSIMM
    Application of Knowledge Based Expert Systems in the Mining Industry

    Expert systems are a product of Artificial Intelligence (AI), a field of long standing, dedicated to the study of problem solving using heuristics, construction of symbolic representations of knowl

    Jan 1, 1998

  • AUSIMM
    Developments in Milling Practice at the Lead/Zinc Concentrator of Mount Isa Mines Limited from 1990

    By Johnson N. W, Munro P. D, Pease J. D

    The Lead/Zinc Concentrator of Mount Isa Mines Limited processes complex fine grained ore from the Isa and Hilton silver-lead-zinc orebodies, producing lead concentrate, zinc concentrate and (until 1

    Jan 1, 1997

  • AUSIMM
    On-Line Analysis for the Mineral Industry

    By Howarth W. J, Sowerby B. D, Watt J. S

    On-line analysis systems have found widespread application in the metalliferous mineral and coal industries. The continuous analysis and rapid response of these systems has led to improved control of

    Jan 1, 1993

  • AUSIMM
    Low Intensity Rotating Magnetic Field Separation

    Magnetic separation using particle rotation in a continuously rotating magnetic field offers very low to insignificant non-magnetic particle entrapment, and precise magnetic fractions. The precision o

    Jan 1, 2000

  • AUSIMM
    Flocculant Selection for Coal Process Streams

    By Loo C. E

    Thirty two polyacrylamide flocculant samples were selected from the wide range offered to the Australian coal industry. An extensive test program was conducted to consider the properties of the flo

    Jan 1, 1989

  • AUSIMM
    The Contribution of Geology to Achieving Mining Performance at Hilton Mine

    By Dennis B

    The Hilton Mine, 20 km north of Mount Isa was discovered in 1947. The underground mine has been a significant producer from 1989. The long development history is the result of complex orebody geometry

    Jan 1, 1993

  • AUSIMM
    The Nickel-Copper Deposit at Radio Hill, Karratha, Western Australia

    By Wightman D, Hoyle M. W H, Peters W. S

    The Radio Hill nickel-copper deposit is located 30 km south of Karratha. It is a new discovery in an area where similar mineralization had been previously discovered at Mt. Scholl and Ruth Well. Radio

    Jan 1, 1987

  • AUSIMM
    The Geology of the Wonthaggi Coalfield, Victoria

    By Knight J. L, Baker G

    The Wonthaggi coalfield is in South Gippsland, about 90 miles southeast of Melbourne. It is situated on the down-faulted block of the South Gippsland highlands that lies south of the Kongwak fault, be

    Jan 1, 1944

  • AUSIMM
    Post-Permian Subsidence and Tectonics, Vulcan Sub-Basin, North West Shelf, Australia

    Tectonic subsidence plots have been calculated for well, extrapolated-well and significant off-well (seismically-based) locations in the Vulcan Sub-basin and adjacent highs (western Timor Sea). The su

    Jan 1, 1990

  • AUSIMM
    Island Arc Geodynamics: A Model with Implications for Seismic and Magmatic Processes

    By Demin SS

    Slow seismotectonic movements along the in-clined deep fault zone under the compressional horizontal stresses are supposed to be the prin-cipal mechanism controlling the structure and processes in the

    Jan 1, 1990

  • AUSIMM
    Field Studies of Semi-Passive Biogeochemical Treatment of Acid Rock Drainage at the Island Copper Mine Pit Lake

    By M Wen, J Gerit, C A. Pelletier, D Muggli

    On-land waste rock dumps at BHP Billiton Base MetalsÆ Island Copper Mine (ICM) near the northern end of Vancouver Island, B.C. continue to discharge ARD. These waters, which amount to approximately fi

    Jan 1, 2003

  • AUSIMM
    Meteorological Forecasting of Blast Noise from the Del Park Minesite (fbcdcfc5-5412-43cd-8805-cbe0739cecc8)

    Alcoa of Australia's Western Australian bauxite mining operations in the Darling Ranges, southeast of Perth, present major challenges in the control of air blast. The close proximity of rural com

    Jan 1, 1983

  • AUSIMM
    Blast Furnace Aerodynamics

    By Petersen V, Potke W, Polthier K

    The paper reviews some of the aerodynamic factors in the blast furnace process and outlines the areas requiring further study. Detailed discussion is given to the pressure drop in both the dry and th

    Jan 1, 1975

  • AUSIMM
    Towards Achieving Sustainable Water Management for an Acidic Open Cut Pit at Mount Morgan, Queensland

    By T Laurencont, C Unger

    The Mount Morgan minesite, located approximately 40 km SW of Rockhampton in Central Queensland, comprises 270 ha of unrehabilitated land which is the currently the major source of acid mine drainage r

    Jan 1, 2003

  • AUSIMM
    No. 3 Ventilation Shaft: Shaft-Sinking Equipment

    With the sinking of the new No. 3 Shaft and the increasing depth and northward movement of the mining operations, improved ventilation of the mine workings became necessary and it was decided to sink

    Jan 1, 1957

  • AUSIMM
    Post Pillar Cut and Fill Stoping at the Dolphin Mine of King Island Scheelite

    By Bedford D. J

    The post pillar cut and fill stoping method has been adopted by King Island Scheelite for the extraction of the main Dolphin orebody. The orebody is a massive, tabular deposit varying from 10 to 50

    Jan 1, 1977

  • AUSIMM
    Blasting Improvements at KCGM

    Blasting is a common practice in mining whereby solid rock is fractured, using explosives, to a more manageable size. The effectiveness of blasting influences a number of downstream activities such as

    Jan 1, 2003

  • AUSIMM
    Longwall Coal Cutting Machines the Future

    By Carthew J

    For more than 30 years shearer loaders have been the most important winning machines for,longwall mining. While the machines of the first generation had a driving power of only 100 or so kW, the p

    Jan 1, 1988

  • AUSIMM
    The Mount Bonnie Gold Silver Project

    By Eupene GS, Cheong GE

    Operations at the Mount Bonnie gold/silver project are described. The project is based on the gossan of a stratiform and stratabound polymetallic sulphide deposit. The gossan contains approx- imat

    Jan 1, 1984