Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Predictive Maintenance Using Simulation and Machine Learning

    By R Marchant, D Willingham

    "Predictive maintenance (also known as PHM or equipment ‘health monitoring’) refers to the intelligent monitoring of equipment to avoid future equipment failures. In contrast to conventional preventiv

    Oct 10, 2016

  • AUSIMM
    Low Voidage Blasting to Improve Underground Stope Productivity

    Productivity of mines can be improved by taking fewer, but larger blasts. The initial blasts taken in starting a mining block are restricted by the low amount of void or space to fire into. Block cave

    Jan 1, 2008

  • AUSIMM
    Abandoned Coal Mines - Friend or Foe?

    By C Rogers

    "The Coal Seam Gas (CSG) industry has seen a rapid increase in activity over a 30-year periodfrom the early 1990s within Australia. Despite public concerns over environmental issues, theCSG industry h

    Jun 1, 2012

  • AUSIMM
    Surface Reactivity of High-Sulfide Copper Mine Tailings Under Shallow Water Cover Conditions

    By A D. Paktunc

    The surface reactivity of underwater deposited, high-sulfide copper mine tailings was evaluated under fresh and saline water cover conditions by measuring the surface and pore water quality as a funct

    Jan 1, 2003

  • AUSIMM
    Production of a Low Arsenic Copper Concentrate at MMG Rosebery

    By Y Peng, D J. Bradshaw, G Long

    As copper reserves deepen, they are becoming increasingly less pure. Penalty elements such as arsenic, antimony and bismuth are occurring in increasing concentrations. Environmental issues with smelte

    Oct 29, 2012

  • AUSIMM
    Underground Stope Drill and Blast Designs Optimisation Program

    By C Preston, T Williams, D Roy

    The easiest way to mine valuable orebodies is through the use of explosives and well-planned blasting layouts that produce fragmentation profiles designed specifically for conveyance equipment in unde

    Aug 24, 2015

  • AUSIMM
    Identify, Convert and Sustain – Resource Development in the Pilbara – The Rio Tinto Way

    By G Danckert

    The key technical theme of ‘orebody knowledge’ has been applied by Rio Tinto in the Pilbara iron ore precinct from 1966, when operations first started there. It forms the basis of present day applicat

    Jul 11, 2011

  • AUSIMM
    A Method of Assessing the Efficiency of Powered Supports in Service

    By Bigdy D. N

    The paper describes a system for providing mine management with a continuous indication of the effectivness of longwall coalface powered supports in controlling roof-to-floor convergence. The syst

    Jan 1, 1988

  • AUSIMM
    Capacity Evaluation of Iron Ore Processing Facilities Utilising Dynamic Simulations

    By N Steenkamp, L Furstenberg, W Cele, M Richter

    Managing productivity and improving efficiency for a healthy return on capital employed have become key mining industry strategies under prevailing tough global market conditions. However, achieving t

    Jul 13, 2015

  • AUSIMM
    The Relationship between Blasting Parameters and Muck Pile Configuration

    By D Van Doorselaere

    The purpose of blasting during mining is to produce a muck pile that can be efficiently loaded and transported. There is an increasing awareness of the variation in muck pile characteristics and its e

    Aug 24, 2015

  • AUSIMM
    Carrapateena Vent Rise Performance – Geotechnical Design and Calibration

    By G Balog, T Ormerod, D Sidea

    Carrapateena is a copper-gold sub level caving operation located in the Gawler Craton, South Australia. One of Australia’s largest undeveloped copper deposits, the project will be a 4.25 Mtpa undergro

    Mar 15, 2021

  • AUSIMM
    Control of Ore Flows at Opencasts

    By M A. Faizulin, N G. Stukalova

    The present till now practice of averaging of ore by metal content at mining-dressing enterprises does not allow evaluating objectively really existing regularities of dressing process. The processing

    Jan 1, 2003

  • AUSIMM
    Frother Evaluation

    By Quinn P, Robertson G, Agar GE

    The replacement of diphenylguanidine (DPG) for separating INCO Bessemer matte with a water soluble collector requires a frother since most collectors do not have frothing properties. The objective o

    Jan 1, 1993

  • AUSIMM
    Design and Commissioning of a 40 Tonne per Day Flotation Concentrate Bio-Oxidation Treatment Plant at the Harbour Lights Mine

    By Carter A. J, Miller D. M, Holder N. H M, Van Aswegen P C

    The Harbour Lights Mine situated at Leonora in Western Australia, mines a refractory sulphidic gold ore. The main sulphide minerals are pyrite and arsenopyrite. Due to the association of gold with the

    Jan 1, 1992

  • AUSIMM
    Never Touch a Running System - Longwall Cutting Sequences and their Potential

    The optimisation and validation of shearer cutting methods is a time consuming engineering task. Many different parameters, of which not all can be controlled, can vary. The easiest solution, to incre

    Dec 6, 2010

  • AUSIMM
    Underground Trucking into the Future

    By C J. Noack, P B. Ganza

    The concept of large trucks underground has been around for some time. While the road train concept is gaining momentum, there are underground mining applications where these trucks have not been suit

    Jan 1, 2005

  • AUSIMM
    Super-Scavenging of zinc Residue by the FASTFLOT Process at Pasmico Mining, Broken Hill

    By Fickera M. A, Marshall S, Burgeese F. L, Burgees J, Estrina H

    A new high intensity flotation process FASTFLOT was deployed to recover residual zinc from the zinc circuit tailings at Pasminco Mining's Concentrator, Broken Hill. Performance of the FASTFLOT

    Jan 1, 1995

  • AUSIMM
    Traffic and Emission Modelling for Surface Roads near the Lane Cove Tunnel Corridor

    The Lane Cove Tunnel (LCT) is an important infrastructure link in New South Wales (NSW) and runs from the end of the Gore Hill Freeway at Artarmon at its eastern extremity, to the end of the M2 at Nor

    Jan 1, 2008

  • AUSIMM
    æCommunity Collaboration is Good Business' (Good for Communities and Good for the Industries Working Within Them)

    By S M. Stewart

    Industry, especially extractive industry, must now give serious attention to the impact its operations have on the natural environment and on the economic, social, and cultural context within which it

    Jan 1, 2007

  • AUSIMM
    Non-Ideal Shock Energy Factor versus Powder Factor for Open Pit Blast Design – ANFO and Chemically-Sensitised Emulsions

    By K G. Fleetwood

    This paper proposes an approach to determine the influence of non-ideal detonation characteristics related to the charge diameter, explosive type and confinement conditions on the available shock ener

    Nov 8, 2011