Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Development of Automated Lead Ingot Casting Machines at the Broken Hill Associated Smelters Pty. Ltd.

    By Dawson RD

    For the past 45 years, the casting of refined lead ingots by The Broken Hill Asso- ciated Smelters Pty. Ltd. (B.H.A,S,) at Port Pirie has been mainly by use of manually operated rotary casting whee

    Jan 1, 1975

  • AUSIMM
    Geophysical Characteristics, Deep Structure, Magmatism and Metallogeny of the Pacific Belt (cb9a84ed-c170-4df7-9e0a-0f6710234aaf)

    By Maslov LA

    We have considered the following characteristics of the crust and upper mantle of the Pacific Belt: seismic wave velocit> anomalies, mechanical stress and shear deformation rate fields, heat flow and

    Jan 1, 1995

  • AUSIMM
    A Comparison through Observation and Simulation of the Power Utilisation and Performance of Two Dissimilar Comminution Plants

    By Johnston G, Revy T

    Dominion Mining Ltd. and the JKMRC have conducted a detailed investigation of the performance of two of Dominion Mining's gold treatment plants (Haveluck and Paddy's Flat). In terms of des

    Jan 1, 1991

  • AUSIMM
    The Stratigraphic and Metamorphic Sequence of Mount Isa, and Associated Igneous Intrusions

    The stratigraphic sequence west of Mount Isa contains the Judenan Beds, Eastern Creek Volcanics, and May Downs gneiss. It is an incomplete sequence as major north-south faults divide the area into fou

    Jan 1, 1972

  • AUSIMM
    The Interaction Between a Tunnel/Cavity and Nearby Structures

    By Abdalla MH

    The deformation resulting from the presence of a tunnel may signifcantly affected, nearby structures and need to be considered during design of both tunnel and structure. The aim of this paper is t

    Jan 1, 1987

  • AUSIMM
    Excavation of the Headrace Tunnel, King River Power Development

    By Baynes F. J, Bermingham A. G

    The 6000m long King Headrace Tunnel will be driven through hard Owen Conglomerate in the Eastern third and feldspar porphyry in the Western two thirds, with the anticipated hardness up to 350MPa un

    Jan 1, 1987

  • AUSIMM
    Long-term Monitoring and Targeted Assessments to Improve Management of Mine Wastes – the Batu Hijau Project

    By S L. Simpson, J Waworuntu, B M. Angel

    "The Batu Hijau copper/gold mine, operated by PT Newmont Nusa Tenggara, is located in the south-western part of Sumbawa Island, Indonesia, and is situated ~10 km from the south coast at an altitude of

    Jun 28, 2016

  • AUSIMM
    Geotechnical and Environmental Aspects of Heap Leach Design, Operation and Closure

    By Bronson B

    The geotechnical and environmental aspects of heap leaching are very closely tied during design, operations and closure. Potential environmental impacts from heap leaching are mostly due to land di

    Jan 1, 1994

  • AUSIMM
    Studies on Optical Basicity of Slags

    By Morinaga K

    The optical basicity (A, Pb2+ as probe ion) of various oxide glass systems has been measured to establish the new basicity scale of slag melts. Best conditions of glassy fragments to measure A wer

    Jan 1, 1980

  • AUSIMM
    A Four-Dimensional Interactive Learning System Approach to Mining Engineering Education

    By S Saydam

    Professional engineers need to be able to apply university learning to practice. In particular, they have to take responsibility for interactions between technical systems and the complex social envir

    Nov 22, 2011

  • AUSIMM
    The Diesel Electric and Compressed Air Central Power Plant of Western New South Wales Electric Power Pty. Ltd.for the Broken Hill Mines

    Broken Hill is situated at an elevation of approximately 1000 ft. above sea-level, on the Barrier Ranges, in the State of New South Wales, Australia. It is approximately 700, 280 and 330 miles from th

    Jan 1, 1932

  • AUSIMM
    Paper No. 196. The Water Flume Conveyors of The Mount Lyell Mining And Railway Company Limited.

    THE power requirements of the Mount Lyell Mining and Railway Company at Queenstown, Tasmania, have, since the inception of smelting operations in June, 1,,896, been derived continuously from the exten

    Jan 1, 1911

  • AUSIMM
    The Kintyre Uranium Deposit: An Exploration Case History

    By Andrew R. L

    The Kintyre uranium deposit was discovered in 1985 in the course of following up radio- metric anomalies generated in an earlier air- borne survey. The latter survey was conducted primarily to acqui

    Jan 1, 1988

  • AUSIMM
    Design of Sample Plants ù Getting it Right First Time

    The basic rule for correct design of a sample plant is that all parts of the material being sampled must have an equal probability of being collected and becoming part of the final sample for analysis

    Jan 1, 2005

  • AUSIMM
    Static Testing of Shotcrete

    By A G. Thompson, E Villaescusa, D Howard

    The Western Australian School of Mines (WASM) has developed a facility for the static testing of full-scale ground support elements (Morton et al, 2007). The test facility consists of several stiff st

    Jan 1, 2008

  • AUSIMM
    Structural Controls on the Superposition of High Sulfidation Epithermal Mineralisation Into Porphyry Copper-Molybdenum Deposits: Lessons From Rosario, Northern Chile

    By P A. Gow, J L. Walshe, G J. Masterman

    The Eocene-Oligocene porphyry belt of northern Chile contains the worldÆs largest accumulation of porphyry-related copper metal. Conflicting models exist regarding the relative importance of strike-sl

    Jan 1, 2005

  • AUSIMM
    Application of High Resolution Video Camera for Blast Evaluation

    By Adhikari G. R, Raju N. M

    The breaking of rock by explosives occurs so rapidly that the details of the phenomenon cannot he observed by the unaided eye. High resolution cameras and VCRs offer a means of slowing down the blas

    Jan 1, 1995

  • AUSIMM
    Formulation of Guidelines on Personal Attributes and Professional Competencies for Graduate Mining Engineers

    By Brady B. H

    Increasingly, consideration is being given to the nominal `outcomes' of degree courses in engineering, including mining engineering. These are concerned not only with knowledge and technical un

    Jan 1, 1997

  • AUSIMM
    Advanced Modelling for Flotation Process Simulation

    By W T. Pate, A V. Potapov, J K. Lichter

    Even though flotation is one of the most important unit operations of mineral processing, accurate modelling of this process for plant performance prediction has remained elusive. In the last four to

    Jan 1, 2005

  • AUSIMM
    Simulation of Product Size Distributions of a Marra Mamba Iron Ore ù Comparison of Conventional Drill and Blast Versus Surface Miner Product at the Cloud Break Deposit

    By B Ilich, M Brad, R Brandli, E MarT

    The Wirtgen surface miner was investigated for application to the Cloud Break iron ore deposit since it can selectively mine thin seams and there is no requirement for drilling and blasting or primary

    Jan 1, 2007