    Strata Control Considerations for Improved Mine Roadway and Panel Driveage Rates

    By Fabjanczyk MW, Nemcik JA, Matthews SM

    The major strata control considerations which affect the optimisation of roadway driveage in highly stressed strata is the performance of reinforcement placed and the extent of stress induced roc

    Jan 1, 1988

  • AUSIMM
    Dragline Performance Evaluations for Tarong Coal Using Physical Modelling

    By Lumley G. I, Hayes H

    Non-intrusive methods for the reliable determination of dragline bucket and rigging performance have been achieved using physical modelling. Modelling offers a logical first step towards developing ma

    Jan 1, 1992

  • AUSIMM
    SXHD Crusher Developments at the Copper Concentrator, Mount Isa Limited

    By Molloy GR, Eaton RA

    The crusher development programme for 7ft Super Extra Heavy Duty (SXHD) Symons cone crushers commenced in 1984. The main objective of the programme was to run the crushers at maxi- mum power for the

    Jan 1, 1988

  • AUSIMM
    Mine Water Resource Management Systems

    By Gillies A. D S, Lee A. H

    The major operational objectives of a mine water resource management system (WRMS) are to supply the water needs of the mine and mill, to minimise disturbance to mining due to rainfall flooding or see

    Jan 1, 1992

  • AUSIMM
    The Sinking and Equipping of the Burwood Colliery Tunnel

    In order to meet the increasing demand for coal for their Newcastle Steel Works, the Broken Hill Pty. Co. Ltd., on June 5, 1937, approved of a scheme to sink a tunnel to the Victoria Seam at their Bur

    Jan 1, 1947

  • AUSIMM
    Control System Improvement Through Alarm Reduction

    By R West

    The Olympic Dam smelter facility processes copper concentrate feed using direct-to-blister smelting technology to support the current site production rate of 225 000 t/a copper. The metallurgical cont

    Jan 1, 2005

  • AUSIMM
    Thick Seam Mining As Practised At Westfalen Colliery, QLD.

    This paper describes thick seam mining as practised at Westfalen Colliery, Redbank via Ipswich,in South Queensland. The author describes the develop- ment of the mine from conception to the time of

    Jan 1, 1976

  • AUSIMM
    Mine Dewatering and Water Disposal Bendigo Goldfield

    By Showers JAF

    The Western Mining Corporation mining lease on the Bendigo Goldfield measures 5krri x 18km with more than 20 anticlinal folds parallelling th long north-south boundaries. Numerous closely spaced sha

    Jan 1, 1988

  • AUSIMM
    Piling and Raise Bore Construction – Key Learnings from a Client’s Perspective

    By R Austerberry, S Green

    Highly weathered ground, limited collar options and the need to achieve a desired outcome at the lowest possible cost led to the need to adopt a construction approach that had no established design me

    Mar 24, 2014

  • AUSIMM
    Development of Drilling and Blasting Practices at The Vickery Coal Mine

    By Conley R, Payne I

    The Vickery Coal Mine commenced open cut mining operations in May 1991. All overburden and interburden is drilled and blasted for excavation by dragline or hydraulic excavator. The mode of operation a

    Jan 1, 1992

  • AUSIMM
    Blast Design System

    ICI Australia has been developing PC-based software to assist the blast engineer to design and monitor open pit blasts. The scope of this software differs significantly from commercially available min

    Jan 1, 1992

  • AUSIMM
    "What do Geostatistics and Cut-Off Grade Optimisation have to do with Real Options Applied to Mine Project Evaluation?"

    By J Araya, O Leiva

    The mine evaluation process, composed of the designing, planning and valuation of a mine project, is, among other variables, based on an estimated orebody model. However, as the information from the d

    Sep 26, 2011

  • AUSIMM
    Three Dimensional Graphics Modelling as Applied to Longhole Stoping Design

    By Woodlands W. K

    A 3D graphics modelling system has been applied to longhole stope ring design at Z.C. Mines, Broken Hill, NSW. This has been in operation for a four month period (January, 1988). The purpose of th

    Jan 1, 1988

  • AUSIMM
    Simple Prediction of the Processing Characteristics of Ores Using QEM*SEM

    By Johnson CR, Wilkie G

    The aim of the study was to use quantitative mineralogical measurements to predict the processing characteristics of an ore. Samples were taken from a wide range of concentrators processing ores of

    Jan 1, 1989

  • AUSIMM
    The Relevance Of Borehole And Bore Core Evaluation To The Design Of Underground Coal Mines

    The relevance of borehole and bore core evaluation to the design of underground coal mines is illustrated by considering the technical parameters of colliery design and the information from which t

    Jan 1, 1977

  • AUSIMM
    Using Fundamentals to Break the Breakdown Maintenance Cycle

    During 1991 - 1993 the author interviewed approximately thirty senior managers of varying responsibilities in either the engineering, construction or operation of a heavy industrial facility. The purp

    Jan 1, 1998

  • AUSIMM
    Structure of the Roof at the End of Longwall Face and Its Support

    Two ends of a longwall face are not only concentrated locations of equipment, but also provide ventilation and access. The roof strata stability here has an important influence on mining coal and

    Jan 1, 1986

  • AUSIMM
    Magnetite Oxidation During Pellet Induration

    By M Bannear, J-F Wilhelmy, R Jones

    Mineralogical study of the interactions between fluxes and iron-oxides helps to understand how magnetite oxidises to haematite during pellet firing. Samples of OneSteel magnetite pellets tested at COR

    Jan 1, 2007

  • AUSIMM
    Development of a Coal Mass Flow Monitor

    By Whitworth NR, Fox MJ, Henley RG

    The coal mass flow monitor was developed to measure the instantaneous mass flow rate of pulverised coal to the copper reverberatory furnace at Mount Isa. The instrument was calibrated with an isokinet

    Jan 1, 1985

  • AUSIMM
    Pilot Tunnel and Blast Enlargement for Vibration Control

    By Lunardi P, Pelizza S

    The link between the Lecco bypass and major road SS36 (Italy) requires the construction of a double two-way tunnel (through the mount San Martino carbonatic massif). The tunnel excavating section

    Jan 1, 1987