Ventilation At Depth At North Broken Hill Limited
Autocompression and virgin rock tempera ture have a marked influence on the ventilation of the lower levels at North Broken Hill Limited N.S.W. To maintain comfortable working temp- eratures without
Jan 1, 1977
-
Cemented Rock Fill Research at Mount Isa Mines Limited 1992-1997
By A G. Greenwood
Research into cemented rock fill at Mount Isa Mines Limited since 1992 is described. The key mechanisms controlling segregation during stope filling with cemented rock fill are described and include t
Jan 1, 1998
-
A Geotechnical Data Management System for Surface and Underground Mines
By Brant BA, Lewandowski R, Trendle M, Haughton D
There is a vast amount of geotechnical data, which can be obtained during exploration programs at new and existing mine sites. Additional information on the performance of the in-situ rock mass can
Jan 1, 1983
-
Introduction of Autonomous Loaders to Olympic Dam Operations, Australia
WMC Resources Ltd has been involved the development and trialling of an automated load haul dump vehicle system since 1997. This paper describes the introduction of the system into the Olympic Dam Ope
Jan 1, 2005
-
The Compatibility of Major Economic Criteria for Project Evaluation
The most frequently applied project evaluation criteria are the Net Present Value, the Internal Rate of Return, and the Pay Back Period. Unfortunately, the Internal Rate of Return and the Pay Back Per
Jan 1, 1991
-
Improving Fine Copper and Gold Flotation Recovery ù A Plant Evaluation
By G Wood, B Lumsden
A statistical ærandomised block designÆ full plant trial of magnetic conditioning of flotation feed was undertaken at Rio TintoÆs Northparkes Mine in New South Wales. Magnetic conditioning of flotatio
Jan 1, 2007
-
Commissioning a Large Coal Blending and Preparation Plant
The Curragh coal mining operation was designed and constructed to produce two coals initially at a rate of 4.3Mtpa. These are a high thermal energy steam coal primarily for domestic electricity ge
Jan 1, 1986
-
Structure, Evolution and Economic Importance of the Taupo Volcanic Zone, New Zealand
The Taupo Volcanic Zone (TVZ) is the largest active volcanic belt in New Zealand. It is
Jan 1, 1987
-
-
The Permeability of Coal to Mixtures of Methane and Carbon Dioxide
The relationship between the permeability of coal to a mixture of methane and carbon dioxide, and the permeability to methane and carbon dioxide separately is described in this paper, along with the a
Jan 1, 1989
-
Remnant Mining
As world demand for various minerals increases the mining industry in its endeavour to satisfy this demand will, eventually,look to the extraction of orebodies which previously may have been uneco
Jan 1, 1975
-
Computer Control of Grinding and Flotation at the Zinc Corporation, Limited and New Broken Hill Consolidated Limited
The philosophy of computer control of grinding and flotation at ZC/NBHC is presented. The performance and reliability of the in- stalled systems are discussed.
Jan 1, 1978
-
Maximum Panel Width Determination for Sub-level Caving with Bottom Ore Drawing
By Adranyl W. W
Sub-level caving with bottom ore drawing has gained wide acceptance in rich, soft, low magnetic iron ores because it provides moderate ore dilution and ore losses. The main problem here is the high
Jan 1, 1995
-
Supergene Enrichment of Ilmenite-Is it Related to Laterization?
Supergene enrichment of ilmenite occurs through a complex series of reactions with initial oxidation and hydration followed by leaching and dehydration. Lateritization appears to be associated wit
Jan 1, 1986
-
The Design, Installation and Commissioning of the Northparkes MinesÆ Lift 2 Ground Handling System
By I Ross
The ground handling system needed for the second lift of the underground block caving operation at Northparkes Mines had to link into the existing infrastructure. Production requirements indicated tha
Jan 1, 2005
-
Valuation of Mining Company Acquisitions
This paper examines the methods and people required for the evaluation of project or corporate acquisitions. Experience over the past five years has shown that some growth can be achieved by carefu
Jan 1, 1989
-
An Approach to Hard Rock Pillar Design at the McArthur River Mine
By E Villaescusa
This paper describes a methodology for the design of mine pillars at the McArthur River Mine. The pillar strength is calculated using a method that accounts for confinement, pillar geometry and intact
Jan 1, 1998
-
Processing of Groote Eylandt Manganese Ores
By Taylor R. K A, Berglin C. I K
The manganese ore deposits at Groote Eylandt are quite variable both in regard to grade and physical cond- ition. In order to treat a wider range of these ores and to increase production a new prim
Jan 1, 1973
-
The Options for Cooling Deep Mines
By Van Rensburg C S J
The options that are open to engineers for cooling mines are limited and are primarily dependent upon the thermophysical properties of coolants. These properties are carefully analysed in the cont
Jan 1, 1988
-
Developments to Enhance the Productivity and Cost-Effectiveness of Large Rotary Blasthole Drills
The on-going technical developments to enhance the productivity and cost effectiveness of large blasthole drills incorporate many of the blasthole drilling operating experiences garnered over the past
Jan 1, 1992