Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Victor Project ? Ontario?s First Diamond Mine

    Agenda ? Where?s Victor ? What work was done to get approval to spend $982m ? a brief history ? Some project facts ? The triple bottom-line accomplishments to date ? Construction A Brief History

    May 1, 2006

  • CIM
    Further Notes Concerning Ore-Shoots

    By G. Vibert Douglas

    Introduction A preliminary paper dealing with the subject of ore-shoots was presented to this Society at its Annual Meeting last year (1). The present paper records the attempts which have been made

    Jan 1, 1935

  • CIM
    Mineral deposits associated with granitoid intrusions and related subvolcanic stocks ill New Brunswick and their relationship to Appalachian tectonic evolution

    By A. A. Ruitenberg, L. R. Fyffe

    "This paper compares several distinct types of mineral deposits associated with different families of granitoid rocks in the New Brunswick Appalachians. Porphyry copper deposit s are associated with l

    Jan 1, 1982

  • CIM
    Gold mineralization at Poplar Mountain, Western New Brunswick, Canada ? Potential relation to granitic intrusions

    By G. Chi

    Outline 1.Regional geologic setting 2.Host rocks and structures 3.Mineralization, alteration and paragenesis 4.Geochronology 5.Major and trace elements 6.Fluid inclusions 7.Carbon and oxygen i

    Apr 1, 2005

  • CIM
    Shrinkage Stoping at the Mouska Mine Symposium of Vein Deposits

    By Robert Marchand

    _ North-western Quebec _ Bousquet mining district _ 21 M oz mining camp _ 100,000 t/yr (400 t/d) _ Shrinkage : 52 % _ Longhole : 40% _ Development : 8% _ 5 days/week _ 120 employees _Discover

    Oct 1, 2001

  • CIM
    Metallurgical Optimisation after the Replacement of two BOF Vessels at Dillinger Hütte/Germany

    By V. Fiedler, H. Lachmund, R. Bruckhaus

    "After producing some 50 million tonnes of crude steel the two BOF vessels at Dillinger Hüitte steel plant had to be replaced in 2000/01 due to large deformations. The new vessel design was optimised

    Jan 1, 2004

  • CIM
    Evolution of Ground Support Practice at LaRonde Mine: Innovative Solutions to High-Stress Yielding Ground

    By Pascal Turcotte

    _ Introduction _ LaRonde _ Controlling Instability in Haulage Drifts _ Failure mechanism in drifts walls _ Failure mechanism in drifts back _ Field Behaviour of Support Elements _ The ?Hybrid B

    Feb 1, 2008

  • CIM
    Gadgets Hydraulic Flow Switch

    THIS article describes the origin and details of a hydraulically operated switch to control the operation of an automatic underground pumping system. This system was installed in December, 1939, on th

    Jan 1, 1945

  • CIM
    Behaviour and Benefits of Arsenic in Copper Electrorefining

    By A. Pranowo, G. R. F. Alvear F., N. Aslin, M. S. Moats

    "The toxicity of arsenic is well known and documented; however, the presence of arsenic in copper electrorefining anodes and electrolytes is critically necessary to produce high-quality cathode. Arsen

    Jan 1, 2016

  • CIM
    New Trend of the Global Flow of Strategic Metals

    By K. Halada

    Current trend of the global flow of strategic metals are analyzed to discuss the strategy of the development of recycling technology and alternative technology. In many cases, each global flow of meta

    Jan 1, 2014

  • CIM
    Large Diameter Raise Boring in Hard Rock: An overview, its application and considerations

    By Patrick S. Hudd

    Traditionally in hard rock mining, large diameter raise boring was thought of as 3.04 metre or 3.66 metre diameter holes 300 metres deep. Mine and ventilation engineers were challenged to design syste

    Oct 1, 2010

  • CIM
    Study of the Use of Flotation Tails as Flux in the Process of Smelting Copper Concentrates

    By H. Henao, F. Canales

    The present work evaluated the use of copper ore flotation tails as flux in the process of smelting copper concentrates. For this purpose, experimental and simulated liquidus lines were obtained at di

    Jan 1, 2019

  • CIM
    Silicate Micro-encapsulation of Pyrite to Prevent Acid Mine Drainage

    By Kostas Fytas

    Acid mine drainage (AMD) is a serious environmental problem that preoccupies the Canadian Mining Industry. Considerable amounts of money are spent every year in an effort to prevent or reduce the acid

    May 1, 2001

  • CIM
    Room temperature mechanical behavior of two refractory castables

    By T. Cutard, H. Marzagui, E. Ouedraogo, M. Roosefid, M. Prompt, C. Deteuf

    The present work is achieved in the framework of a French national program on modeling and experimental characterization of the thermo-mechanical properties of refractory materials (PROMETHEREF). This

    Jan 1, 2004

  • CIM
    Platinum and Platinum-Gold Nanoparticles Supported on HY Zeolite. Catalytic Activity in isomerization and Oxidation Reactions

    By Golaleh Riahi

    An original method is used to obtain stable nanoparticles of gold-based mono- and bimetallic systems supported on an acidic zeolite. This approach has been applied to PtHY (1wt% Pt) and to bimetallic

    Oct 1, 2003

  • CIM
    Post-magmatic Remobilization of Platinum-Group Elements in the Kelly Lake Ni-Cu Sulfide Deposit, Copper Cliff Offset, Sudbury

    By Peter C. Jones, Wanda M. Carter, David H. Watkinson

    "Abstract - Pyrrhotite, chalcopyrite, and pentlandite are the dominant sulfide minerals in the 740 zone of the Kelly Lake orebody (Inco Ltd.), Copper Cliff Offset, Sudbury. Petrographic and quantitati

    Jan 1, 2001

  • CIM
    Reduction of Silver Loss in Copper Cathode

    By Nitin Bhavsar, Kaushik Vakil, Lakshmikanth Reddy, Sanjay Sarkar, Tathavadkar. Vilas, Bhavin Desai, Raghavendra Adiga

    Gold and platinum group metals (PGM) do not dissolve in sulfate electrolyte from anode during electro-refining of primary copper. The PGM form solid ‘slimes’ which accumulates at bottom of the electro

    Jan 1, 2019

  • CIM
    Temperature Variation Rules During the Process of Gas Adsorption in Coal

    By Baisheng Nie, Longlong Yang, Tao Yang, Wenjie Jia

    "Gas adsorption in coal is an exothermic and physical process. Temperature might change during the dynamical process. In order to get the temperature variation of gas adsorption process, the experimen

    Jan 1, 2015

  • CIM
    Éléonore Project Update

    Éléonore Project Highlights Éléonoreis a multi-million ounce, high grade gold discovery in Québec Currently at the advanced exploration and engineering studies stage Excellent potential for expans

    May 1, 2007

  • CIM
    Wildlife Utilization of Reclamation Habitats within the Highland Valley Copper Operating Area

    By Richard Howie

    Avian Diversity ?? Pre-mining ?? 110 - 125 species would have occurred ?? Dominated by forest species ?? Wetland productivity unknown ?? Post mining ?? 192 documented ?? Forested species in red

    May 1, 2008