Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Evidence for a Feeder Pipe and Associated Alteration at the Brunswick No. 12 Massive-Sulfide Deposit (6ba284c3-b619-4b87-9743-c3aba495d77c)

    By Wayne D. Goodfellow, William M. Luff, Steven J. Juras

    Brunswick No. 12 is a vent-proximal massive sulfide deposit that formed above a feeder pipe with associated hydrothermal alteration. Because of the replacement of bedded sulfides deposited above the h

    Jan 1, 1992

  • CIM
    An electrochemical criterion for galvanic protection of steel exposed to marine environments

    By H. E. Wilde

    "Zinc has been used for many years as a galvanic coating for the protection of steel. Electrochemical measurements show that zinc actually overprotects steel. The corrosion rate of DQSK (drawing quali

    Jan 1, 1990

  • CIM
    An Overview of the ULU Gold Deposit, High Lake Volcanic Belt, Nunavut, Canada

    By R. Carpenter, H. Muntanion, P. Kleespies, E. Flood, M. Tansey

    Abstract - BHP Minerals discovered the Archean lode gold ULU deposit on the western margin of the High Lake Volcanic Belt in 1989. The greenschist to amphibolite facies mafic volcanic and sedimentary

    Jan 1, 2004

  • CIM
    Diavik ? The Art of the Possible

    By Doug Ashbury

    Diamond Miners? Challenges ? Remote ? 300 kilometres from Yellowknife ? Sub-Arctic conditions ? permafrost, climate ? No power ? No all-weather roads ? Ore bodies difficult to find ? Caribou, fi

    Apr 1, 2005

  • CIM
    Underground water bulkhead construction at Pamour No. 1 mine

    By H. Kalsi

    "IntroductionRoyal Oak Mines Inc. is currently operating the Parnour No.1 mine located 10.5 miles east of Tinunins, adjacent to Highway No. 101. The operation produces gold ore at a rate of 3300 tpd.

    Jan 1, 1994

  • CIM
    Mine and Tailings Effluent Treatment at the Kimberley, B.C. Operations of Cominco Ltd. (641e0bef-605a-4287-82ae-93ec545560c0)

    By W. J. Kuit

    "Complex facilities which provide for the collection, management and treatment of effluents emanating from the Sullivan mine and concentrator tailings were made operational in October, 1979. Key featu

    Jan 1, 1980

  • CIM
    Treatment of Complex Feeds at Noranda Copper Smelting and Refining

    By Peter Godbehere, Christian Desroches, Viken Baboudjian

    "Noranda Copper Smelting and Refining is a unit of Noranda Metallurgy Inc., comprising the Home smelter in Rouyn-Noranda, Quebec and the C.C.R. Refinery in Montreal East. The Home smelter provides cus

    Jan 1, 1995

  • CIM
  • CIM
    A proposed underground communication system for the near-future

    By Pierre Montrueil, Marcel St-Amant

    Within the next few years, underground mobile equipment will be partially automated. Mining methods will integrate more and more automation. Such an evolution will be possible only if adequate undergr

    Jan 1, 1994

  • CIM
    Key Lake: the trail of its discovery

    By Gerhard Kircbner, Boen Tan

    "IntroductionThe Key Lake uranium-nickel ore deposits are located in the Athabasca Basin of northern Saskatchewan, Canada (Fig. 1). Many papers have been published on Key Lake in the past (Dahlkarnp a

    Jan 1, 1994

  • CIM
    Comprehensive Heat Study at a Wyoming Underground Trona Mine

    By Arash Habibi

    The FMC Westvaco Trona Mine is located near Green River, Wyoming and has an annual production of 4.5 M tons. The underground mine has three active development panels and one longwall panel. The mining

    Aug 1, 2013

  • CIM
    Tax issues during hard times

    By Robert B. Parsons

    "During hard times, the focus on tax issues makes a slight change in direction. Mining companies contemplate the tax treatment of transactions and circumstances which are the product of a difficult fi

    Jan 1, 1993

  • CIM
    Committee issues report on federal sales tax reform

    By Robert B. Parsons

    """I would be a rich man if I had a dime for every man hour spent by the bureaucracy on changing tax legislation."" Anonymous.The mind of a cynic might very well conjure thoughts about ""change for th

    Jan 1, 1983

  • CIM
    Sequential Acid Leaching of Nickel Laterites with Iron Precipitation

    By J. D. Gillaspie, D. T. White

    "Sulphuric acid atmospheric leaching of nickel saprolite / garnierite ores was proposed in the early twentieth century, prior to the development of the pressure acid leaching process for limonite ores

    Jan 1, 2016

  • CIM
    Grade Control and the Life of Mine Plan

    By Mike McKevitt

    We are trying to promote a concept and a change in management?s approach to the iterative process of grade control. This is important as grade control must routinely try and achieve the long term obj

    May 1, 2009

  • CIM
    Recent Progress of the “O-SR Process” Technology

    By I. Ueda, S. Ishikawa, T. Nagata

    “O-SR process” in which the S-Furnace of the Mitsubishi process is followed by existing reverberatory furnaces (RFs) and Peirce Smith (PS) converters has been operated since December 2007. The S-Furna

    Jan 1, 2019

  • CIM
    Use of Models to Help Evaluate River-Water-Quality-Protection Measures

    By William DeWit

    When rivers are contaminated from industrial operations, as often occurs near repositories of spent mine tailings, decision-support tools can be critically important in evaluating the effectiveness of

    May 1, 2011

  • CIM
    Phoenix Camp, B. C.

    By R. H. Seraphim

    "The Phoenix Camp, in the Boundary Creek district of southern British Columbia, produced before 1920 about 15 million tons of ore averaging more than l ·5 per cent copper, about 0.03 ounces per ton in

    Jan 1, 1949

  • CIM
    Ball Mill Overload Detection Algorithms

    By D. Sbarbaro

    In many modem concentrators the use of supervisory systems in their grinding circuits has meant more consistent operations and increases in capacity. These systems rely on a series of specific algorit

    Jan 1, 2007

  • CIM
    Optimization of a Tilt Poured Permanent Mold Casting via Solidification Modeling

    By Bernard Tougas, Franco Chiesa, David Levasseur, Bernard Duchesne

    "In the present paper, the optimization of a tilt poured permanent mold will be carried out using filling and solidification modeling. This exercise resulted in 3 modifications of the initial mold des

    Jan 1, 2014