Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Whither the Mining Engineer Degree?

    By J. B. Evans

    "THE OPPORTUNITY to participate in a CIM seminarconcerning the direction of mining engineer trainingis perhaps fortuitous as it comes at a time when theengineering schools which have invited inspectio

    Jan 1, 1972

  • CIM
    Valuation Introduction

    By Lawrence Devon Smith, Keith Spence, William Roscoe

    "In March 2003 the CIM Council adopted and approved the document “Standards and Guidelines for Valuation of Mineral Properties” as developed by the Special Committee of the Canadian Institute of Minin

    Jan 1, 2003

  • CIM
    An overview of wear-resistant alloys for the mining industry

    By J. B. C. Wu, B. McKee

    "Mining along with subsequent processing of the minerals often presents conditions where a wear- and/or corrosion-resistant alloy is needed to minimize downtime and maximize efficiency. This paper is

    Jan 1, 1997

  • CIM
    Commissioning and Early Operation of the Con Mine Pressure Oxidation Plant

    By Paul D. Young, Michael J. Allan

    "The Con Mine has been producing gold continuously since 1938. In 1990 laboratory and pilot plant investigations began into the use of pressure oxidation for treatment of an arsenic trioxide waste pro

    Jan 1, 1994

  • CIM
    Influence of additives on microstructural changes of nitride bonded SiC refractories

    By F. Golestani-Fard, A. A. Nourbakhsh

    In this paper microstructural development of nitride-Bonded SIC refractories is reported in presence of Al203, Mg() and Urea additives .The samples were prepared by mixing, shaping and firing at 1400-

    Jan 1, 2004

  • CIM
    Milling Operations at Lemoine Mines Limited

    By G. Ladouceur

    "LOCATIONThe mine and mill are located in Lemoine township which is 20 miles directly south-east of the town of Chibougamau Quebec. Personnel live in Chibougamau and commute to the property over 33 mi

    Jan 1, 1979

  • CIM
    Towards a Comprehensive Model of the Flash Smelting Furnace

    By P. Taskinen, A. Jokilaakso

    The Flash Smelting Process for copper and nickel production has been one of the most successful new metallurgical process developments in the 20th century. The experimental data from laboratory scale

    Jan 1, 2019

  • CIM
    Copper Mountain Mine

    By Victor Dolmage

    "The localization of orebodies by geological structures is well demonstrated at the Copper Mountain mine of southwestern British Columbia. These extensive deposits; owned and workd by the Granby Conso

    Jan 1, 1954

  • CIM
    GSC PAPER 88-21 (Canada) - Standardized Coal Resource/Reserve Reporting System for Canada, Geological Survey of Canada - GSC PAPER 88-21

    By L. Klatzel-Mudry, D. J. Nikols, J. D. Hughes

    "The Geological Survey of Canada Paper 88-21, A Standardized Coal Resource/Reserve Reporting System for Canada, is referenced by National Instrument 43-101 for the preparation of resource and reserve

    Jan 1, 2003

  • CIM
    Wastewater treatment at Hudson Bay Mining and Smelting Co., Limited

    By R. V. Typliski, G. J. Labarre

    "Hudson Bay Mining and Smelting Co., Limited, Flin Flon, Manitoba, has developed a metallurgical wastewater treatment system employing two-stage lime neutralization, sludge recirculation and conventio

    Jan 1, 1980

  • CIM
    Evaluation of Specific Charge Parameter on Open-Pit Blasting

    By Abdurrahman Tosun

    It is very important for after blasting processes that muck pile fragmentation is predicted and controlled during blasting. Therefore, a significant research effort has been devoted to the development

    Aug 1, 2013

  • CIM
    Prevention of "Spontaneous Heating" by Low Temperature Immersion Carbonization of Coal

    By J. G. Speight

    Laboratory studies indicate that autogenous heating of low-rank coal can be prevented by a prior treatment which involves immersing the coal for short (5-15 min.) periods in an inert liquid at tempera

    Jan 1, 1973

  • CIM
    Recovery of Uranium from Typical Leach Solutions

    Recently, renewed interest in the recovery of uranium from leach solutions has necessitated a re-examination of the hydrometallurgy methods used for uranium in the 1960?s to 1970?s. A synthesizing ove

    Aug 1, 2010

  • CIM
    Texture of Az31b Sheets Processed by Asymmetric Rolling

    By H. Utsunomiya

    Most magnesium alloy sheets show low deformability in rolling. Edge cracks and transverse fractures are common difficulties. In addition, rolled sheets show well-developed basal texture <0001>//ND. Th

    Jan 1, 2006

  • CIM
    Effect of additives on hydration resistance of dolomite refractories

    By A. M. Hadian

    The use of dolomite refractories in steel making and cement industries has advantages over other basic products particularly in countries where this type of refractories is produced. Due to existence

    Jan 1, 2004

  • CIM
    Reconciling the Recent Uranium Surge With Staff Shortages: Where are the Human Resources for the Next Generation?

    By P. W. Waggitt

    ABSTRACT From approximately 1986 until 2000, uranium production was at a historic low. In 2003, uranium mineral exploration surged, despite the global financial crisis; however, the shortage and aging

    Jan 1, 2014

  • CIM
    Operating Experience Recovering Acid And Copper At The Phelps Dodge El Paso Rod Mill Using Emew® Technology

    By D. P. Fenton

    The Phelps Dodge El Paso Rod Mill produces approximately 2.4 million pounds per day of copper rod from a casting and rolling operation. The newly formed rod is treated to remove mill scale and oxides

    Jan 1, 2007

  • CIM
    The Influence of the Fe3+/Fe2+ Redox Couple on the Chalcopyrite Leacidng

    By E. M. Córdoba

    The effect of the Fe3+ lFe2+ redox couple on the chemical and biological dissolution of chalcopyrite was studied. All the tests were carried out in stirred flasks with 100 mL of a ferric/ferrous sulph

    Jan 1, 2007

  • CIM
    Coal Reclamation from the Summit Mine Dump (Paper No. 13 )

    "Background:The recorded coal production in Nova Scotia from 1863 to 1980 was 390, 000, 000 short tons. This extraction was associated with an estimated 60,000,000 short tons of discarded material. Th

    Jan 1, 1983

  • CIM
    The Metso MP1250 Cone Crusher – Two Case Studies (f0f34b8b-9322-405b-9121-e0158cd99f3c)

    By S. Koski, M. Schmalzel, D. A. Jacobson, S. Crosby, P. Cook, M. Mular

    "Mining operations, whether new or existing, are constantly looking for ways to maximize production and improve energy efficiency, while keeping the footprint required to a minimum. The Nordberg MP125

    Jan 1, 2012