Lateral Load Tests on Step Tapered Bored Piles in Calcareous Sands
By Nabil F. Ismael, Mohamed El Deeb
"The behavior of laterally loaded step tapered bored piles in calcareous sand was examined by field tests. Lateral load tests were carried out on straight and step tapered bored piles 5.3 m long embed
Jan 1, 2005
-
Route 9A Pedestrian Tunnel at the World Trade Center
By Raymond E. Sandiford
"The redevelopment of the World Trade Center (WTC) provided an opportunity for the Port Authority of NY and NJ to complete a long sought underground connection between all of Lower Manhattan’s transit
Jan 1, 2012
-
Securing of In-Situ Cement Mixing Quality for the Expansive Soil with the ‘Montmorillonite’ Inclusion
By Masaru Sakakibara, Ngo Tuan Anh, Mitsuo Nozu
"In the southern region of Vietnam and the southern United States, numbers of Deep Mixing (DM) columns have been installed to increase the stability of slopes and mitigate ground settlement. However,
Jan 1, 2015
-
Vibrations Caused by Pile Driving
By K. Rainer Massarsch
"Part 2 of 2 (Continued from Summer 2004 edition) By K. Rainer Massarsch, Geo Engineering AB, Stockholm, SwedenVibrations, which are caused by the installation of piles in dry or permeable soils, can
Jan 1, 2004
-
Slope Stabilization of Mill Creek Landslide Using Steel H-Piles
By Kessi E. Zicko, Eric A. Hackenberg, Paul J. Lewis
"Following snow melt and spring rains in 2011, a landslide measuring approximately 600 feet long and 300 feet in slope length occurred within the southbound roadway embankment of a heavily travelled 2
Jan 1, 2015
-
Case Studies/case Histories In Geotechnical Engineerin: Enhancing The Practice In An Interactive Learning Environment
By Waddah Akili
This paper describes the steps taken in planning, developing, and executing a case study/ case history course in geotechnical/ foundation engineering at an international university. The paper sheds li
-
Soil Mixing Monitoring System Quality Control for the SR-83 Project in Florida
By Danny Winters, Wesley Schmutzler, Christopher Lewis, Matteo Bertoni
"SR 83/US 331 is a primary North/South roadway in Walton County that is a crucial link for tourism and commerce between the Walton County beaches and the heavily traveled I-10 corridor in the panhandl
Jan 1, 2017
-
Incorporating Site Variability into LRFD Design of Pile Foundations
By Murad Y. Abu-Farsakh, Md Habibur Rahman
The properties of all natural soil deposits are highly variable, and they are rarely homogeneous. Cone penetration tests (CPT) were used to assess the site variability, which was then incorporated in
Sep 8, 2021
-
Pile Driving Equipment ? The Right Tool For The Job - "How To Avoid First Day 'Down Time' Blues"
By R. Paul De Bruyn
A. Crane Check List -- Make -- Model -- Year of Manufacture -- Where is load chart? Is it for this crane? -- Boom style and length -- Boom tip drawing (sketch) for fixed lead connection.
Jan 1, 1990
-
Vertical Load Carrying Capacity Of Concrete Expanded Base Piles
By Mustapha Zergoun
This paper presents the results of load tests to assess the vertical load carrying capacity of concrete expanded base piles, or pressure injected footings, for various projects located near Vancouver,
Jan 1, 2004
-
Recent Advances in Quiet & Vibration-less Steel Pile Installation
By R. K. Filip
"Steel bearing piles have long been used to carry high compressive, tensile and lateral loads. Such piles are most commonly tubular or ""H"" profile and are typically installed using percussive techni
Jan 1, 2005
-
Helical Pile Foundation Solution for Landfill Redevelopment
By Kevin Baumgartner, Steven Babcock
A landfill in Phoenix, AZ reached capacity and was graded over in the 1970s. The property was subdivided into lots in 2007 to create a business park. However, the challenging site conditions caused by
Sep 8, 2021
-
Soil Nail Design Optimization of 100 Ft Deep Excavation Project in San Diego, CA
By Babak Mamaqani, Pirooz Barar
The Heights project was located at Fashion Valley North, San Diego, CA. The scope of the project was to replace two existing commercial buildings with a large 7-story multi-family residential building
Sep 8, 2021
-
Innovative Crosshole Sonic Logging Testing Drilled Shafts
By Joshua C. Adams, Les Chernauskas, Edward L. Hajduk
"Drilled shafts are increasingly being used to support bridge and building foundations. Because these foundations usually carry very high design loads and often serve as non-redundant, single load car
Jan 1, 2009
-
Alternative Design and Construction Method for Clinton CSO Underground Storage Facility
By Meeok Kim, Paul Beljan, Gordon Chen
"Clinton combined sewer overflow storage (CSO) facility project developed by the Department of Water Environment Protection of Onondaga County, New York, is to improve sewer facilities and infrastruct
Jan 1, 2015
-
Load Tests On Large Diameter Bored Piles In Cemented Sands
By Nabil F. Ismael
Load tests were carried out to examine the ultimate bearing capacity of short, large diameter bored piles in connection with the construction of a multistory building on the Arabian Gulf in Kuwait.
-
Trump International Is OPA Winner
"Standing 92 stories high and just over 1,362 ft tall, Chicago’s Trump International Hotel and Tower is perfectly positioned at the center of one of the world’s most impressive skylines.The Tower serv
Jan 1, 2009
-
A Ten-Year Perspective of Jet Grouting: Advancements in Applications and Technology
By Gary T. Brill
In the presentation, the development and new applications of the jet grouting technique in the North America are briefly introduced at first and followed by the outline and advantages of Jet Grouting.
Feb 10, 2003
-
Innovative Use Of Ground Improvement
By Mark Koelling
This paper presents a case history of a ground improvement program conducted in a soft soil environment and seismically active region in the northwest corner of Washington State near the Canadian bord
Jan 1, 2010
-
Helical Piers/ Anchors in the Chicago Building Code
By Gary L. Seider, Dana A. Wesolek, Fred C. Schmednecht
"A new condominium project, The Atelier, developed by Pickus Companies located at the corner of Bryn Mawr and Sheridan in Chicago, IL required an earth retention system to protect the surrounding road
Jan 1, 2005