Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Frustum Confining Vessel (FCV) For Investigation of Deep Foundation Performance

    By Abolfazl Eslami, Masoud Zare, Ali Asadi, Ali Abrang

    "Physical small scale models for study of deep foundations can be performed in simple chambers (1g), calibration chambers (CC), and centrifuge apparatus (ng) which involve some limitations and difficu

    Jan 1, 2015

  • DFI
    Recent Experiences With Optical Fibre Monitoring Of Geotechnical Structures

    By Gust Van Lysebetten, Monika de Vos

    The objectives of monitoring geotechnical structures can be very diverse, including optimisation of the design, quality control, long term performance assessment, and approval of innovative execution

    May 1, 2022

  • DFI
    Contactless Anchor Measurement with Elastomagnetic Sensors

    By Damir Dedic, Wörle. Patrick

    "Soil properties within a construction project area are analyzed during the planning phase. However, it is only possible to achieve selective soil exploration, even in the case of very extensive inves

    Jan 1, 2017

  • DFI
    Adaptive Design and Contractual Approaches to Address Geotechnical Uncertainties in a Design-Build Ground Improvement Project

    By Kalyani Devabhaktuni, Mike Minton, Mark T. Howe, Yan Zhang

    During the procurement phase of a Design-Build (DB) project, design-build contractors must often commit to a fixed price based on limited or incomplete geotechnical information. This lack of informati

    Jan 1, 2019

  • DFI
    Construction of a Deep Slurry Cutoff Wall for the Sacramento River East Levee Program

    By Louay Owaidat, Daniel Jabbour, Allan Frappier, Jose Gomez, Mark Stanley, Tino Maestas

    The U.S. Army Corps of Engineers (USACE) is implementing a levee strengthening program along the Sacramento River East Levee (SREL) designed to correct 11 miles of deficient levees as identified by re

    Sep 8, 2021

  • DFI
    Artificial Ground Freezing: A Smart Application Below The Airport Of Perth

    By Luca Pingue, Regine Jagow-Klaff, Franco Muratore, Carlandrea Albonico, Damiano Frontini, Rudolf Wernecké

    This paper describes an artificial ground freezing (AGF) application carried out to ensure both watertightness and structural support for the safe excavation of four cross passages of the Forrestfield

    May 1, 2022

  • DFI
    Lateral Stresses On Multilevel Tieback Walls

    By Liiban A. Affi

    The most difficult task of designing multilevel tieback walls for deep excavation support is the determination of lateral stresses. These lateral stresses act not only on the shored height, but also

    Jan 1, 2010

  • DFI
    Interdisciplinary And Inventive Approaches To Drilled Shaft Remediation

    By William D. Oder, Seth H. Hamblin, Les R. Chernatskas, Jonathan L. Ernst

    Large diameter drilled deep foundations are a widely utilized solution throughout North America and the world. Numerous design and construction techniques developed over the past 100 years have made t

    Oct 1, 2022

  • DFI
    Replacement of the Kosciuszko Bridge Brooklyn Connector: An Integrated Design and Construction Approach

    By M. D. Riegel, P. B. Pizzimenti, E. M. Zamiskie, Britain A. Materek

    "The Skanska/Kiewit/ECCO III team (SKE) in association with HNTB was awarded the design-build contract for Phase I of the Kosciuszko Bridge Replacement Project. As lead designer for the SKE team, HNTB

    Jan 1, 2016

  • DFI
    Creative Solution For Sydney Data Centre

    By M. Krzaninski, Y. Zou, A. Frost

    The foundation solution for a data centre building in Sydney, Australia comprised two alternatives, the first of which incorporated the use of CFA piles founded in rock at approx. 27m depth to support

    Nov 1, 2022

  • DFI
    Top-Loaded Bidirectional Test, a New Approach to Deep Foundations Load Testing

    By Patrick J. Hannigan, Frank Rausche, Rozbeh B. Moghaddam

    The Top-Loaded Bi-Directional Test (“TLBT”) is a new method to apply bi-directional loads to a deep foundation element with the loading source located above the foundation head. In the TLBT reusable l

    Sep 8, 2021

  • DFI
    Assessment of Existing Bulkhead Walls for Dredging Impacts

    By Rakam Lama Tamang, Michael J. Byle, Stephen Ernst

    "For various reasons, dredging may become necessary in front of existing bulkhead walls, either for channel deepening or for environmental remediation of contaminated sediments. The removal of sedimen

    Jan 1, 2017

  • DFI
    Driving and Extraction of Steel Pipe Piles in Nearshore Environment

    By Jim Rix, Ken Been, Nihal Bohra, Anthony Rice, Juan Lopez

    "A temporary bridge, supported on steel pipe piles, was built to expedite the construction of a breakwater structure off the western coast of Peru. The bridge provided access for dump trucks to the br

    Jan 1, 2017

  • DFI
    Driving And Extraction Of Steel Pipe Piles In Nearshore Environment

    By Nihal Bohra

    A temporary bridge, supported on steel pipe piles, was built to expedite the construction of a breakwater structure off the western coast of Peru. The bridge provided access for dump trucks to the bre

  • DFI
    Experimental P-Y Curves from Centrifuge Tests on Pile Foundations Subjected to Liquefaction and Lateral Spreading

    By Arash Khosravifar, Nason McCullough, Stephen, Milad Souri, Scott Schlechter, E. Dickenson

    The results of five centrifuge models were used to evaluate the response of pile-supported wharves subjected to inertial and liquefaction-induced lateral spreading loads. The centrifuge models contain

    Jan 1, 2019

  • DFI
    Cofferdam Failures ? Introduction

    By Richard J. Hartman

    This presentation identifies some of the more common problems associated with cofferdam construction. After the various problems are identified, they are briefly explained and possible solutions and p

    Jan 1, 1987

  • DFI
    Adjacent Top-Loaded Bi-Directional Test And Conventional Bidirectional Load Test Results – Site Ii

    By Patrick J. Hannigan, Seth Robertson, Rozbeh B. Moghaddam

    The Top-Loaded Bi-Directional Test (―TLBT‖) and the conventional Bi-Directional Load Test (―BDLT‖) are full-scale static load test methods. In both methods, the test loads are applied bi-directionally

    Oct 1, 2022

  • DFI
    Earth Pressure Distribution On Diaphragm Wall During Excavation

    By Ting Chinsu

    Diaphragm wall with tie-back cable is widely used for deep excavation, especially in the area with high density of buildings. This paper presents the measured earth pressure distribution on diaphragm

    Jan 1, 1991

  • DFI
    Case Histories of Circular Secant Pile Access Shafts for Tunnels

    By Piotr Kozlowski, Stanley L. Worst, Matthew J. Niermann

    Circular secant pile shafts were installed along the tunnel alignments for both the Ohio Canal Interceptor Tunnel project in Akron, Ohio and the Ohio River Tunnel project in Louisville, Kentucky. The

    Jan 1, 2019

  • DFI
    CPT Methods for Helical Pile Design

    By Howard A. Perko, Margaret Dring, Gerald Verbeek, Scott Slaughter

    Helical piles have become a widely used deep foundation system in recent years due to their many inherent advantages. The cone penetration test (CPT) is commonly used in geotechnical practice to evalu

    Sep 8, 2021